{"id":1044637,"date":"2025-02-19T13:17:07","date_gmt":"2025-02-19T07:47:07","guid":{"rendered":"https:\/\/www.squareyards.com\/blog\/?p=1044637"},"modified":"2026-09-18T13:18:15","modified_gmt":"2026-09-18T07:48:15","slug":"construction-cost-in-chennai-smrthme","status":"publish","type":"post","link":"https:\/\/www.squareyards.com\/blog\/construction-cost-in-chennai-smrthme","title":{"rendered":"Chennai Building Construction Cost &#038; Per Sq Ft Rates"},"content":{"rendered":"\r\n<p><span style=\"font-weight: 400;\">Chennai&#8217;s coastal soil and monsoon season make construction here trickier than most cities, and that shows up in the bill.<\/span><\/p>\r\n<p><b>Construction cost in Chennai typically ranges from \u20b91,800 to \u20b93,500+ per square foot, depending on the quality tier you choose.<\/b><span style=\"font-weight: 400;\"> The construction rate in Chennai also shifts by zone. Land, labor availability, and transport costs vary across the city more than you&#8217;d expect.<\/span><\/p>\r\n<p><span style=\"font-weight: 400;\">This guide breaks down cost by quality tier, by zone, by house size, and covers current material price ranges too: cement, steel, sand, bricks, tiles. Rates shift with market conditions and location, so treat every figure here as a planning range. Confirm current numbers with two or three local contractors before you budget around any of this.<\/span><\/p>\r\n<p>{{auto_toc}}<\/p>\r\n<h2><span style=\"font-weight: 400;\">What Is the Construction Cost in Chennai Right Now?<\/span><\/h2>\r\n<p><span style=\"font-weight: 400;\">Construction cost in Chennai falls between \u20b91,800 and \u20b93,500+ per square foot. Quality tier drives most of that range. Zone and material choice fill in the rest.<\/span><\/p>\r\n<p><span style=\"font-weight: 400;\">A few quick facts worth knowing:<\/span><\/p>\r\n<ul>\r\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">Basic or economy construction starts around \u20b91,800 per sq ft: standard ceramic tiles, basic fixtures, standard steel<\/span><\/li>\r\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">Standard or mid-range construction runs \u20b92,200 to \u20b92,800 per sq ft: good-quality branded materials, moderate finishing<\/span><\/li>\r\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">Premium or luxury construction can push past \u20b93,500 per sq ft: high-end vitrified tiles, premium wood, architectural elevation<\/span><\/li>\r\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">Land cost, professional fees, and several statutory approvals are almost never included in a builder&#8217;s quoted rate<\/span><\/li>\r\n<\/ul>\r\n<p><span style=\"font-weight: 400;\">That last point catches more people off guard than anything else here. A quote for a 1,000 sq ft house at \u20b92,363 per sq ft sounds complete. Add professional fees and the costs everyone forgets, and the real number climbs another 15 to 25%.<br \/><\/span><span style=\"font-weight: 400;\">The construction price in Chennai has also been trending upward, up roughly 5 to 10% over the past year, driven mainly by cement, steel, and sand costs. Budgeting a small buffer for that shift is smarter than locking a number too early.<\/span><\/p>\r\n<h2><span style=\"font-weight: 400;\">Construction Cost by Quality Tier<\/span><\/h2>\r\n<p><span style=\"font-weight: 400;\">Here&#8217;s what each tier gets you in Chennai, based on typical builder packages priced per sqft.<\/span><\/p>\r\n<table>\r\n<thead>\r\n<tr>\r\n<th>\r\n<p><b>Quality Tier<\/b><\/p>\r\n<\/th>\r\n<th>\r\n<p><b>Typical Cost per Sq Ft<\/b><\/p>\r\n<\/th>\r\n<th>\r\n<p><b>What&#8217;s Usually Included<\/b><\/p>\r\n<\/th>\r\n<\/tr>\r\n<\/thead>\r\n<tbody>\r\n<tr>\r\n<td>\r\n<p><span style=\"font-weight: 400;\">Basic \/ Economy<\/span><\/p>\r\n<\/td>\r\n<td>\r\n<p><span style=\"font-weight: 400;\">\u20b91,800 \u2013 \u20b92,200<\/span><\/p>\r\n<\/td>\r\n<td>\r\n<p><span style=\"font-weight: 400;\">Standard ceramic tiles, basic fixtures, standard steel<\/span><\/p>\r\n<\/td>\r\n<\/tr>\r\n<tr>\r\n<td>\r\n<p><span style=\"font-weight: 400;\">Standard \/ Mid-Range<\/span><\/p>\r\n<\/td>\r\n<td>\r\n<p><span style=\"font-weight: 400;\">\u20b92,200 \u2013 \u20b92,800<\/span><\/p>\r\n<\/td>\r\n<td>\r\n<p><span style=\"font-weight: 400;\">Good-quality branded materials, moderate finishing<\/span><\/p>\r\n<\/td>\r\n<\/tr>\r\n<tr>\r\n<td>\r\n<p><span style=\"font-weight: 400;\">Premium \/ Luxury<\/span><\/p>\r\n<\/td>\r\n<td>\r\n<p><span style=\"font-weight: 400;\">\u20b92,800 \u2013 \u20b93,500+<\/span><\/p>\r\n<\/td>\r\n<td>\r\n<p><span style=\"font-weight: 400;\">High-end vitrified tiles, premium wood, architectural elevation, luxury fittings<\/span><\/p>\r\n<\/td>\r\n<\/tr>\r\n<\/tbody>\r\n<\/table>\r\n<p><span style=\"font-weight: 400;\">Most homeowners in Chennai land in the Standard tier, and it&#8217;s usually the right call. Branded materials show up here without paying for design work a family home rarely needs.<\/span><\/p>\r\n<h2><span style=\"font-weight: 400;\">Construction Cost by Zone in Chennai<\/span><\/h2>\r\n<p><span style=\"font-weight: 400;\">Where you build in Chennai changes the number more than most people realize. Here&#8217;s how basic versus premium finishes price out across different zones.<\/span><\/p>\r\n<table>\r\n<thead>\r\n<tr>\r\n<th>\r\n<p><b>Zone<\/b><\/p>\r\n<\/th>\r\n<th>\r\n<p><b>Basic Finish<\/b><\/p>\r\n<\/th>\r\n<th>\r\n<p><b>Premium Finish<\/b><\/p>\r\n<\/th>\r\n<\/tr>\r\n<\/thead>\r\n<tbody>\r\n<tr>\r\n<td>\r\n<p><a href=\"https:\/\/www.squareyards.com\/under-construction-projects-in-tambaram-west-chennai\" target=\"_blank\" rel=\"noopener\"><span style=\"font-weight: 400;\">Tambaram, Chromepet, Pallavaram<\/span><\/a><\/p>\r\n<\/td>\r\n<td>\r\n<p><span style=\"font-weight: 400;\">\u20b92,100 \u2013 \u20b92,400\/sq ft<\/span><\/p>\r\n<\/td>\r\n<td>\r\n<p><span style=\"font-weight: 400;\">\u20b92,600 \u2013 \u20b92,900\/sq ft<\/span><\/p>\r\n<\/td>\r\n<\/tr>\r\n<tr>\r\n<td>\r\n<p><a href=\"https:\/\/www.squareyards.com\/under-construction-projects-in-porur-chennai\" target=\"_blank\" rel=\"noopener\"><span style=\"font-weight: 400;\">Porur<\/span><\/a><span style=\"font-weight: 400;\">, Ramapuram, Maduravoyal<\/span><\/p>\r\n<\/td>\r\n<td>\r\n<p><span style=\"font-weight: 400;\">\u20b92,200 \u2013 \u20b92,500\/sq ft<\/span><\/p>\r\n<\/td>\r\n<td>\r\n<p><span style=\"font-weight: 400;\">\u20b92,700 \u2013 \u20b93,100\/sq ft<\/span><\/p>\r\n<\/td>\r\n<\/tr>\r\n<tr>\r\n<td>\r\n<p><a href=\"https:\/\/www.squareyards.com\/under-construction-projects-in-velachery-chennai\" target=\"_blank\" rel=\"noopener\"><span style=\"font-weight: 400;\">Velachery<\/span><\/a><span style=\"font-weight: 400;\"> and Pallikaranai<\/span><\/p>\r\n<\/td>\r\n<td>\r\n<p><span style=\"font-weight: 400;\">\u20b92,200 \u2013 \u20b92,500\/sq ft<\/span><\/p>\r\n<\/td>\r\n<td>\r\n<p><span style=\"font-weight: 400;\">\u20b92,800 \u2013 \u20b93,100\/sq ft<\/span><\/p>\r\n<\/td>\r\n<\/tr>\r\n<tr>\r\n<td>\r\n<p><a href=\"https:\/\/www.squareyards.com\/under-construction-projects-in-anna-nagar-west-chennai\" target=\"_blank\" rel=\"noopener\"><span style=\"font-weight: 400;\">Anna Nagar<\/span><\/a><span style=\"font-weight: 400;\"> and Arumbakkam<\/span><\/p>\r\n<\/td>\r\n<td>\r\n<p><span style=\"font-weight: 400;\">\u20b92,500 \u2013 \u20b92,900\/sq ft<\/span><\/p>\r\n<\/td>\r\n<td>\r\n<p><span style=\"font-weight: 400;\">\u20b93,200 \u2013 \u20b93,600\/sq ft<\/span><\/p>\r\n<\/td>\r\n<\/tr>\r\n<tr>\r\n<td>\r\n<p><span style=\"font-weight: 400;\">ECR (Palavakkam to Injambakkam)<\/span><\/p>\r\n<\/td>\r\n<td>\r\n<p><span style=\"font-weight: 400;\">\u20b92,400 \u2013 \u20b92,700\/sq ft<\/span><\/p>\r\n<\/td>\r\n<td>\r\n<p><span style=\"font-weight: 400;\">\u20b93,100 \u2013 \u20b93,800\/sq ft<\/span><\/p>\r\n<\/td>\r\n<\/tr>\r\n<\/tbody>\r\n<\/table>\r\n<p><span style=\"font-weight: 400;\">Anna Nagar and Arumbakkam sit at the top of this list, mostly because of land value and established infrastructure. ECR isn&#8217;t far behind. Coastal construction there often needs extra structural work to handle the soil and weather.<\/span><\/p>\r\n<h2><span style=\"font-weight: 400;\">Construction Cost by House Size<\/span><\/h2>\r\n<p><span style=\"font-weight: 400;\">Quality tier and zone set the rate. House size decides the total bill.<\/span><\/p>\r\n<table>\r\n<thead>\r\n<tr>\r\n<th>\r\n<p><b>House Size<\/b><\/p>\r\n<\/th>\r\n<th>\r\n<p><b>Estimated Total Cost<\/b><\/p>\r\n<\/th>\r\n<\/tr>\r\n<\/thead>\r\n<tbody>\r\n<tr>\r\n<td>\r\n<p><span style=\"font-weight: 400;\">600 sq ft (small home)<\/span><\/p>\r\n<\/td>\r\n<td>\r\n<p><span style=\"font-weight: 400;\">\u20b913 lakh \u2013 \u20b917 lakh<\/span><\/p>\r\n<\/td>\r\n<\/tr>\r\n<tr>\r\n<td>\r\n<p><span style=\"font-weight: 400;\">800 sq ft<\/span><\/p>\r\n<\/td>\r\n<td>\r\n<p><span style=\"font-weight: 400;\">\u20b918 lakh \u2013 \u20b922 lakh<\/span><\/p>\r\n<\/td>\r\n<\/tr>\r\n<tr>\r\n<td>\r\n<p><span style=\"font-weight: 400;\">1,000 sq ft (standard quality)<\/span><\/p>\r\n<\/td>\r\n<td>\r\n<p><span style=\"font-weight: 400;\">\u20b921 lakh \u2013 \u20b927 lakh<\/span><\/p>\r\n<\/td>\r\n<\/tr>\r\n<tr>\r\n<td>\r\n<p><span style=\"font-weight: 400;\">2BHK (900\u20131,100 sq ft built-up)<\/span><\/p>\r\n<\/td>\r\n<td>\r\n<p><span style=\"font-weight: 400;\">\u20b918 lakh \u2013 \u20b930 lakh<\/span><\/p>\r\n<\/td>\r\n<\/tr>\r\n<tr>\r\n<td>\r\n<p><span style=\"font-weight: 400;\">3BHK (1,400\u20131,600 sq ft built-up)<\/span><\/p>\r\n<\/td>\r\n<td>\r\n<p><span style=\"font-weight: 400;\">\u20b929 lakh \u2013 \u20b943 lakh<\/span><\/p>\r\n<\/td>\r\n<\/tr>\r\n<tr>\r\n<td>\r\n<p><span style=\"font-weight: 400;\">1,200 sq ft (<\/span><a href=\"https:\/\/www.squareyards.com\/blog\/30x40-house-plan-smrthme\" target=\"_blank\" rel=\"noopener\"><span style=\"font-weight: 400;\">30&#215;40 plot<\/span><\/a><span style=\"font-weight: 400;\">, single floor)<\/span><\/p>\r\n<\/td>\r\n<td>\r\n<p><span style=\"font-weight: 400;\">\u20b922 lakh \u2013 \u20b934 lakh<\/span><\/p>\r\n<\/td>\r\n<\/tr>\r\n<\/tbody>\r\n<\/table>\r\n<p><span style=\"font-weight: 400;\">These figures exclude land, professional fees, and luxury upgrades. Add roughly 15 to 20% on top for those before treating any of these as an all-in number.<\/span><\/p>\r\n<h2><span style=\"font-weight: 400;\">Material Price Guide: Cement, Steel, Sand, Bricks, Tiles<\/span><\/h2>\r\n<p><span style=\"font-weight: 400;\">Material prices shift often. Treat these as general ranges, not today&#8217;s exact rate. Always confirm with a local supplier before ordering in bulk.<\/span><\/p>\r\n<table>\r\n<thead>\r\n<tr>\r\n<th>\r\n<p><b>Material<\/b><\/p>\r\n<\/th>\r\n<th>\r\n<p><b>Typical Price Range<\/b><\/p>\r\n<\/th>\r\n<\/tr>\r\n<\/thead>\r\n<tbody>\r\n<tr>\r\n<td>\r\n<p><span style=\"font-weight: 400;\">Cement (OPC 43\/53, 50kg bag)<\/span><\/p>\r\n<\/td>\r\n<td>\r\n<p><span style=\"font-weight: 400;\">\u20b9380 \u2013 \u20b9430 per bag<\/span><\/p>\r\n<\/td>\r\n<\/tr>\r\n<tr>\r\n<td>\r\n<p><span style=\"font-weight: 400;\">TMT steel bars (Fe500D, per kg)<\/span><\/p>\r\n<\/td>\r\n<td>\r\n<p><span style=\"font-weight: 400;\">\u20b958 \u2013 \u20b967 per kg, varies by diameter<\/span><\/p>\r\n<\/td>\r\n<\/tr>\r\n<tr>\r\n<td>\r\n<p><span style=\"font-weight: 400;\">River sand (per tonne)<\/span><\/p>\r\n<\/td>\r\n<td>\r\n<p><span style=\"font-weight: 400;\">\u20b92,400 \u2013 \u20b93,000<\/span><\/p>\r\n<\/td>\r\n<\/tr>\r\n<tr>\r\n<td>\r\n<p><span style=\"font-weight: 400;\">M-Sand (per tonne)<\/span><\/p>\r\n<\/td>\r\n<td>\r\n<p><span style=\"font-weight: 400;\">\u20b91,200 \u2013 \u20b91,500<\/span><\/p>\r\n<\/td>\r\n<\/tr>\r\n<tr>\r\n<td>\r\n<p><span style=\"font-weight: 400;\">Red clay bricks (per piece)<\/span><\/p>\r\n<\/td>\r\n<td>\r\n<p><span style=\"font-weight: 400;\">\u20b99 \u2013 \u20b912<\/span><\/p>\r\n<\/td>\r\n<\/tr>\r\n<tr>\r\n<td>\r\n<p><span style=\"font-weight: 400;\">Fly ash bricks (per piece)<\/span><\/p>\r\n<\/td>\r\n<td>\r\n<p><span style=\"font-weight: 400;\">\u20b95 \u2013 \u20b97<\/span><\/p>\r\n<\/td>\r\n<\/tr>\r\n<tr>\r\n<td>\r\n<p><span style=\"font-weight: 400;\">Vitrified tiles, 2&#215;2 ft (per sq ft)<\/span><\/p>\r\n<\/td>\r\n<td>\r\n<p><span style=\"font-weight: 400;\">\u20b962 \u2013 \u20b9115<\/span><\/p>\r\n<\/td>\r\n<\/tr>\r\n<\/tbody>\r\n<\/table>\r\n<p><span style=\"font-weight: 400;\">Fly ash bricks win out across Tamil Nadu construction, mostly on cost. Cement and steel move with market conditions more than any other material here, so price them close to your actual start date. Not months in advance.<\/span><\/p>\r\n<h2><span style=\"font-weight: 400;\">Material vs. Labor Cost Split<\/span><\/h2>\r\n<p><span style=\"font-weight: 400;\">Materials typically account for 55 to 65% of total construction cost in Chennai. Cement, steel, bricks, sand, and tiles make up most of that share, and cement and steel move the most with market conditions.<br \/><\/span><span style=\"font-weight: 400;\">Labor accounts for another 25 to 35%, covering masons, electricians, plumbers, and general contract labor. The remaining share goes toward equipment rental, transportation, and site overhead.<br \/><\/span><span style=\"font-weight: 400;\">Labor rates have more room to negotiate than material costs. Cement and steel prices are set largely by the market, but labor rates can vary meaningfully between contractors doing comparable work.<\/span><\/p>\r\n<h2><span style=\"font-weight: 400;\">Construction Cost Calculator: How to Estimate Your Own Budget<\/span><\/h2>\r\n<p><span style=\"font-weight: 400;\">Here&#8217;s a simple way to work out your own number before calling a builder. Multiply your built-up area by your target quality tier&#8217;s rate per sqft. Then add roughly 15 to 20% on top for the exclusions listed above.<br \/><\/span><span style=\"font-weight: 400;\">For a 1,200 sq ft home at the Standard tier, using the mid-range rate of \u20b92,500 per sq ft, that works out to around \u20b930 lakh for construction alone. Add another 15-20% for CMDA\/DTCP approvals, borewell, sump, and basic interiors. You land somewhere in the \u20b934-36 lakh range for an all-in estimate.<br \/><\/span><span style=\"font-weight: 400;\">This math helps you sanity-check a quote, it doesn&#8217;t replace one. If someone quotes you dramatically below this range, ask exactly what&#8217;s been left out.<\/span><\/p>\r\n<h2><span style=\"font-weight: 400;\">Additional Costs to Budget Separately<\/span><\/h2>\r\n<p><span style=\"font-weight: 400;\">Basic builder packages almost always skip external works and statutory approvals. Missing these in your budget is one of the most common planning mistakes people make.<\/span><\/p>\r\n<ul>\r\n<li style=\"font-weight: 400;\" aria-level=\"1\"><b>CMDA\/DTCP plan approvals.<\/b><span style=\"font-weight: 400;\"> Roughly \u20b945\u2013100 per sq ft, or \u20b940,000 to \u20b92,00,000 total depending on plot size.<\/span><\/li>\r\n<li style=\"font-weight: 400;\" aria-level=\"1\"><b>Borewell and motor.<\/b><span style=\"font-weight: 400;\"> Commonly \u20b990,000 to \u20b91,00,000.<\/span><\/li>\r\n<li style=\"font-weight: 400;\" aria-level=\"1\"><b>Underground sump.<\/b><span style=\"font-weight: 400;\"> Typically \u20b940,000 to \u20b91,25,000, depending on capacity.<\/span><\/li>\r\n<li style=\"font-weight: 400;\" aria-level=\"1\"><b>Septic tank.<\/b><span style=\"font-weight: 400;\"> Usually \u20b935,000 to \u20b960,000.<\/span><\/li>\r\n<li style=\"font-weight: 400;\" aria-level=\"1\"><b>Compound wall.<\/b><span style=\"font-weight: 400;\"> Around \u20b91,000 to \u20b91,400 per running foot.<\/span><\/li>\r\n<\/ul>\r\n<p><span style=\"font-weight: 400;\">None of these show up in a basic per-sq-ft quote. Ask your builder to list them separately before you sign anything.<\/span><\/p>\r\n<h2><span style=\"font-weight: 400;\">How Long Does Construction Take in Chennai?<\/span><\/h2>\r\n<p><span style=\"font-weight: 400;\">A 1,000 sq ft house in Chennai typically takes 7 to 15 months, depending on quality tier. Basic quality builds run 7 to 9 months. Standard quality takes 9 to 12. Premium finishes stretch to 12 to 15.<br \/><\/span><span style=\"font-weight: 400;\">Chennai&#8217;s monsoon season, June through September, can add 3 to 5 weeks of delay on its own. RCC curing and other rain-sensitive work slow down considerably once the heavy rain sets in.<\/span><\/p>\r\n<h2><span style=\"font-weight: 400;\">Where to Buy Construction Materials in Chennai<\/span><\/h2>\r\n<p><span style=\"font-weight: 400;\">Local building material dealers and authorized brand distributors are the standard route for most homeowners. Online platforms like IndiaMart list suppliers too, useful for comparing prices before committing to a dealer.<br \/><\/span><span style=\"font-weight: 400;\">For large quantities, contacting manufacturers directly often beats retail pricing. Compare at least two or three suppliers before placing a bulk order. Cement and steel prices especially can swing more between vendors than people expect.<\/span><\/p>\r\n<h2><span style=\"font-weight: 400;\">Wrapping Up<\/span><\/h2>\r\n<p><span style=\"font-weight: 400;\">Construction cost in Chennai isn&#8217;t one fixed number. It depends on quality tier, zone, and house size, and every figure in this guide is a planning reference, not a quote you can hold a builder to. Confirm final numbers with your own contractor before signing anything.<br \/><\/span><span style=\"font-weight: 400;\">Before you finalize a budget, get your quality tier clearly defined, check zone-specific rates, and ask what your quote excludes. If you&#8217;re still deciding on a layout, our guide on <\/span><a href=\"https:\/\/www.squareyards.com\/blog\/30x40-house-plan-smrthme\" target=\"_blank\" rel=\"noopener\"><span style=\"font-weight: 400;\">30&#215;40 house plans<\/span><\/a><span style=\"font-weight: 400;\"> is a good next step, and our page on <\/span><a href=\"https:\/\/www.squareyards.com\/under-construction-projects-in-chennai\" target=\"_blank\" rel=\"noopener\"><span style=\"font-weight: 400;\">under-construction projects in Chennai<\/span><\/a><span style=\"font-weight: 400;\"> is worth a look if you&#8217;re comparing builder-led developments instead of building independently.<\/span><\/p>\r\n<p><strong>Dont\u2019 miss It!<\/strong><\/p>\r\n<figure class=\"wp-block-table\">\r\n<table>\r\n<tbody>\r\n<tr>\r\n<td><a href=\"https:\/\/www.squareyards.com\/blog\/construction-cost-in-delhi-smrthme\" target=\"_blank\" rel=\"noopener\"><span data-sheets-root=\"1\">Construction Cost in Delhi<\/span><\/a><\/td>\r\n<\/tr>\r\n<tr>\r\n<td><a href=\"https:\/\/www.squareyards.com\/blog\/construction-cost-in-india-smrthme\" target=\"_blank\" rel=\"noopener\"><span data-sheets-root=\"1\">Construction Cost in India<\/span><\/a><\/td>\r\n<\/tr>\r\n<tr>\r\n<td><a href=\"https:\/\/www.squareyards.com\/blog\/construction-cost-in-bangalore-smrthme\" target=\"_blank\" rel=\"noopener\"><span data-sheets-root=\"1\">Construction Cost in Bangalore<\/span><\/a><\/td>\r\n<\/tr>\r\n<\/tbody>\r\n<\/table>\r\n<\/figure>\r\n<!-- \/wp:structured-content\/faq-item --><!-- \/wp:structured-content\/faq -->","protected":false},"excerpt":{"rendered":"<p>Chennai&#8217;s coastal soil and monsoon season make construction here trickier than most cities, and that shows up in the bill. Construction cost in Chennai typically ranges from \u20b91,800 to \u20b93,500+ per square foot, depending on the quality tier you choose. The construction rate in Chennai also shifts by zone. Land, labor availability, and transport costs [&hellip;]<\/p>\n","protected":false},"author":134,"featured_media":1091204,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[222],"acf":[],"_links":{"self":[{"href":"https:\/\/www.squareyards.com\/blog\/wp-json\/wp\/v2\/posts\/1044637"}],"collection":[{"href":"https:\/\/www.squareyards.com\/blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.squareyards.com\/blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.squareyards.com\/blog\/wp-json\/wp\/v2\/users\/134"}],"replies":[{"embeddable":true,"href":"https:\/\/www.squareyards.com\/blog\/wp-json\/wp\/v2\/comments?post=1044637"}],"version-history":[{"count":8,"href":"https:\/\/www.squareyards.com\/blog\/wp-json\/wp\/v2\/posts\/1044637\/revisions"}],"predecessor-version":[{"id":1091205,"href":"https:\/\/www.squareyards.com\/blog\/wp-json\/wp\/v2\/posts\/1044637\/revisions\/1091205"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.squareyards.com\/blog\/wp-json\/wp\/v2\/media\/1091204"}],"wp:attachment":[{"href":"https:\/\/www.squareyards.com\/blog\/wp-json\/wp\/v2\/media?parent=1044637"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.squareyards.com\/blog\/wp-json\/wp\/v2\/categories?post=1044637"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}