{"id":1090207,"date":"2026-08-13T16:03:59","date_gmt":"2026-08-13T10:33:59","guid":{"rendered":"https:\/\/www.squareyards.com\/blog\/?p=1090207"},"modified":"2026-08-13T16:03:59","modified_gmt":"2026-08-13T10:33:59","slug":"hinjewadi-nearest-metro-station","status":"publish","type":"post","link":"https:\/\/www.squareyards.com\/blog\/hinjewadi-nearest-metro-station","title":{"rendered":"Hinjewadi Nearest Metro Station: Distance, Routes &#038; Travel Guide (2026)"},"content":{"rendered":"<p><span style=\"font-weight: 400;\">Ask anyone commuting into Rajiv Gandhi Infotech Park how they get to work, and you&#8217;ll hear the same thing: the Mumbai-Bengaluru highway, then a company bus or an Ola, then twenty minutes of bumper-to-bumper crawling near Wipro Circle. The metro, for now, is mostly something people are waiting on rather than using. That&#8217;s changing, but slowly, and with more delays than anyone in Hinjewadi would like.<\/span><\/p>\n<p><span style=\"font-weight: 400;\">Hinjewadi doesn&#8217;t have a metro station of its own today. The nearest working option is Vanaz, the western end of the Aqua Line out in Kothrud, and that&#8217;s a good 10 to 12 km away, not exactly a quick hop. What people actually care about is Pune Metro Line 3, sometimes called the Pink Line, which is being built specifically to run through Hinjewadi itself, with stations planted right next to Infosys, Wipro, and the rest of the tech parks. It&#8217;s just not open yet, and the launch date has moved more than once already.<\/span><\/p>\n<p>{{auto_toc}}<\/p>\n<h2><b>Quick Reference: Metro Access Near Hinjewadi<\/b><\/h2>\n<table>\n<tbody>\n<tr>\n<td>\n<p><b>Option<\/b><\/p>\n<\/td>\n<td>\n<p><b>Line<\/b><\/p>\n<\/td>\n<td>\n<p><b>Distance\/Location<\/b><\/p>\n<\/td>\n<td>\n<p><b>Status<\/b><\/p>\n<\/td>\n<\/tr>\n<tr>\n<td>\n<p><span style=\"font-weight: 400;\">Vanaz<\/span><\/p>\n<\/td>\n<td>\n<p><span style=\"font-weight: 400;\">Aqua Line<\/span><\/p>\n<\/td>\n<td>\n<p><span style=\"font-weight: 400;\">Approx. 10-12 km from Hinjewadi Phase 1<\/span><\/p>\n<\/td>\n<td>\n<p><span style=\"font-weight: 400;\">Operational<\/span><\/p>\n<\/td>\n<\/tr>\n<tr>\n<td>\n<p><span style=\"font-weight: 400;\">Megapolis, Quadron, Infosys Phase 2, Wipro Phase 2 and others<\/span><\/p>\n<\/td>\n<td>\n<p><span style=\"font-weight: 400;\">Pink Line \/ Line 3<\/span><\/p>\n<\/td>\n<td>\n<p><span style=\"font-weight: 400;\">Inside Hinjewadi itself<\/span><\/p>\n<\/td>\n<td>\n<p><span style=\"font-weight: 400;\">Under construction, trial runs completed<\/span><\/p>\n<\/td>\n<\/tr>\n<tr>\n<td>\n<p><span style=\"font-weight: 400;\">Balewadi Stadium, Wakad Chowk, Shivaji Chowk<\/span><\/p>\n<\/td>\n<td>\n<p><span style=\"font-weight: 400;\">Pink Line \/ Line 3<\/span><\/p>\n<\/td>\n<td>\n<p><span style=\"font-weight: 400;\">Just outside Hinjewadi, on the way to Baner<\/span><\/p>\n<\/td>\n<td>\n<p><span style=\"font-weight: 400;\">Under construction<\/span><\/p>\n<\/td>\n<\/tr>\n<tr>\n<td>\n<p><span style=\"font-weight: 400;\">District Court \/ Shivajinagar<\/span><\/p>\n<\/td>\n<td>\n<p><span style=\"font-weight: 400;\">Pink Line \/ Line 3, interchange with Purple &amp; Aqua<\/span><\/p>\n<\/td>\n<td>\n<p><span style=\"font-weight: 400;\">City center end of the corridor<\/span><\/p>\n<\/td>\n<td>\n<p><span style=\"font-weight: 400;\">Under construction<\/span><\/p>\n<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<p><span style=\"font-weight: 400;\">None of that is a small caveat. It changes the whole way you should think about &#8220;nearest metro station&#8221; for Hinjewadi. Right now the honest answer is that there isn&#8217;t one operating yet, but there will be several, and soon.<\/span><\/p>\n<h3><b>1. Vanaz Metro Station: The Closest Working Option Today<\/b><\/h3>\n<p><b>Distance from Hinjewadi:<\/b><span style=\"font-weight: 400;\"> Roughly 10-12 km, closer for addresses near Marunji and farther for anything deeper into Hinjewadi Phase 2 or 3\u00a0<\/span><\/p>\n<p><b>Metro Line:<\/b><span style=\"font-weight: 400;\"> Aqua Line, western terminus\u00a0<\/span><\/p>\n<p><b>Travel Time by Auto\/Cab:<\/b><span style=\"font-weight: 400;\"> 30 to 40 minutes, longer during evening traffic on the Kothrud-Hinjewadi stretch<\/span><\/p>\n<p><span style=\"font-weight: 400;\">Vanaz sits at the western end of the Aqua Line in Kothrud, and it&#8217;s the only operational metro station anywhere close to Hinjewadi right now. &#8220;Close&#8221; is relative here, since it&#8217;s still a 30 to 40 minute drive away with no direct road that makes the trip quick. Most people commuting from Hinjewadi don&#8217;t bother routing through Vanaz at all, they just drive the whole way. It&#8217;s really a station for people whose journey starts somewhere else and happens to end near Hinjewadi, not the other way round.<\/span><\/p>\n<h3><b>2. Megapolis Circle &amp; Quadron Business Park: Right at the IT Park&#8217;s Doorstep<\/b><\/h3>\n<p><b>Distance from Hinjewadi:<\/b><span style=\"font-weight: 400;\"> Inside Hinjewadi Phase 3\u00a0<\/span><\/p>\n<p><b>Metro Line:<\/b><span style=\"font-weight: 400;\"> Pink Line \/ Line 3, western end of the corridor\u00a0<\/span><\/p>\n<p><b>Status:<\/b><span style=\"font-weight: 400;\"> Under construction, part of the first 12-station phase<\/span><\/p>\n<p><span style=\"font-weight: 400;\">Megapolis Circle is where Line 3 actually begins, and Quadron Business Park follows right after it. Both stations sit inside the Hinjewadi IT park itself, not on its outskirts, which is a real departure from how most of India&#8217;s IT-corridor metro projects have worked out. Once these are running, anyone based in Hinjewadi Phase 3 or working out of the Megapolis campus won&#8217;t need an auto or a shuttle at all for the first leg of the trip.<\/span><\/p>\n<h3><b>3. Infosys Phase 2 &amp; Wipro Phase 2: Built for the Biggest Employers<\/b><\/h3>\n<p><b>Distance from Hinjewadi:<\/b><span style=\"font-weight: 400;\"> Inside Hinjewadi Phase 2\u00a0<\/span><\/p>\n<p><b>Metro Line:<\/b><span style=\"font-weight: 400;\"> Pink Line \/ Line 3\u00a0<\/span><\/p>\n<p><b>Status:<\/b><span style=\"font-weight: 400;\"> Under construction, part of the first 12-station phase<\/span><\/p>\n<p><span style=\"font-weight: 400;\">These two stations, along with Dohler and Pall India nearby, are named directly after the companies they serve, which tells you how deliberately the alignment was planned. Infosys and Wipro alone employ tens of thousands of people across their Hinjewadi campuses, and a station sitting right outside each one is about as close to door-to-door metro access as an IT park commute gets in this country. This stretch is probably the single biggest reason the corridor was built in the first place.<\/span><\/p>\n<h3><b>4. Balewadi Stadium, Wakad Chowk &amp; Shivaji Chowk: The Middle Stretch<\/b><\/h3>\n<p><b>Distance from Hinjewadi:<\/b><span style=\"font-weight: 400;\"> Bordering Hinjewadi on the Baner-Wakad side\u00a0<\/span><\/p>\n<p><b>Metro Line:<\/b><span style=\"font-weight: 400;\"> Pink Line \/ Line 3\u00a0<\/span><\/p>\n<p><b>Status:<\/b><span style=\"font-weight: 400;\"> Under construction, part of the first 12-station phase<\/span><\/p>\n<p><span style=\"font-weight: 400;\">This is where the line starts moving out of the IT park and into the more residential parts of the corridor. Wakad Chowk and Shivaji Chowk sit along a stretch that&#8217;s already dense with apartment complexes, and Balewadi Stadium adds the sports complex and its surrounding development into the mix. For people living in Wakad or Balewadi and working in Hinjewadi, this middle section is likely to be the most heavily used part of the whole line once it opens.<\/span><\/p>\n<h3><b>5. District Court \/ Shivajinagar: The City-Centre Interchange<\/b><\/h3>\n<p><b>Distance from Hinjewadi:<\/b><span style=\"font-weight: 400;\"> Eastern terminus of Line 3, roughly 23 km from Megapolis Circle\u00a0<\/span><\/p>\n<p><b>Metro Line:<\/b><span style=\"font-weight: 400;\"> Pink Line \/ Line 3, interchanging with the Purple Line and Aqua Line\u00a0<\/span><\/p>\n<p><b>Status:<\/b><span style=\"font-weight: 400;\"> Under construction, expected in the second phase of the rollout<\/span><\/p>\n<p><span style=\"font-weight: 400;\">District Court is where everything meets. It&#8217;s already a live interchange for the Purple and Aqua lines, and once Line 3 reaches it, Hinjewadi will effectively be connected to the entire operational Pune Metro network through a single change of trains. This station is part of the later phase of the corridor, though, expected to open after the Hinjewadi-side stretch, so it&#8217;s the one people should count on last rather than first.<\/span><\/p>\n<h2><b>Why the Opening Keeps Moving<\/b><\/h2>\n<p><span style=\"font-weight: 400;\">Here&#8217;s where it gets a little frustrating and worth being upfront about. The corridor was originally supposed to be ready by March 2025. Then March 2026. Then Maharashtra CM Devendra Fadnavis announced in mid-March 2026 that the Hinjewadi-Balewadi stretch would open in May, with the rest following in July. Trial runs were completed on both directions by mid-February 2026, and officials said the project had crossed 94-95% completion by April.<\/span><\/p>\n<p><span style=\"font-weight: 400;\">May came and went. The target shifted to June 15, then slipped again to mid-July after a review meeting in Mumbai where Fadnavis reportedly told PMRDA officials that repeated delays would not be tolerated going forward. As of this writing, the phase 1 stretch (the 12 Hinjewadi-side stations, running roughly from Maan to Balewadi) hasn&#8217;t been confirmed as operational, and the remaining 11 stations toward Shivajinagar are being targeted for sometime around September or October 2026. Given the track record here, treat any specific date as a working estimate rather than a promise, and check MahaMetro or the PMRDA website before planning around it.<\/span><\/p>\n<h2><b>Getting to Hinjewadi Right Now, Without the Metro<\/b><\/h2>\n<p><b>From Baner or Balewadi:<\/b><span style=\"font-weight: 400;\"> Take the shuttle or a fifteen- to twenty-minute cab ride along the Baner-Hinjewadi Road, longer during evening peak.<\/span><\/p>\n<p><b>From Wakad:<\/b><span style=\"font-weight: 400;\"> Ten to fifteen minutes by auto or bike, this is one of the shorter last-mile hops around Hinjewadi.<\/span><\/p>\n<p><b>From Kothrud (Vanaz metro):<\/b><span style=\"font-weight: 400;\"> Take the Aqua Line to Vanaz, then a 30 to 40 minute cab ride the rest of the way. Most people skip this entirely and just drive.<\/span><\/p>\n<p><b>From Shivajinagar or the city center:<\/b><span style=\"font-weight: 400;\"> Purple Line to Shivajinagar station, then a taxi or bike taxi covering the remaining distance, usually 35 to 45 minutes depending on traffic on the Mumbai-Bengaluru highway.<\/span><\/p>\n<p><b>From Pune Airport:<\/b><span style=\"font-weight: 400;\"> No metro route covers this yet. A direct cab is the only real option, and it can take 45 minutes to over an hour depending on the time of day.<\/span><\/p>\n<h2><b>Last-Mile Options Around Hinjewadi<\/b><\/h2>\n<table>\n<tbody>\n<tr>\n<td>\n<p><b>Option<\/b><\/p>\n<\/td>\n<td>\n<p><b>Typical Fare<\/b><\/p>\n<\/td>\n<td>\n<p><b>Notes<\/b><\/p>\n<\/td>\n<\/tr>\n<tr>\n<td>\n<p><span style=\"font-weight: 400;\">Auto-rickshaw<\/span><\/p>\n<\/td>\n<td>\n<p><span style=\"font-weight: 400;\">Rs 100-300<\/span><\/p>\n<\/td>\n<td>\n<p><span style=\"font-weight: 400;\">Widely available but harder to find during evening rush<\/span><\/p>\n<\/td>\n<\/tr>\n<tr>\n<td>\n<p><span style=\"font-weight: 400;\">Ola\/Uber<\/span><\/p>\n<\/td>\n<td>\n<p><span style=\"font-weight: 400;\">Rs 150-450<\/span><\/p>\n<\/td>\n<td>\n<p><span style=\"font-weight: 400;\">24&#215;7, best for late-night travel<\/span><\/p>\n<\/td>\n<\/tr>\n<tr>\n<td>\n<p><span style=\"font-weight: 400;\">Company Shuttle<\/span><\/p>\n<\/td>\n<td>\n<p><span style=\"font-weight: 400;\">Usually free for employees<\/span><\/p>\n<\/td>\n<td>\n<p><span style=\"font-weight: 400;\">Timed around shift changes, the default for most IT park commuters<\/span><\/p>\n<\/td>\n<\/tr>\n<tr>\n<td>\n<p><span style=\"font-weight: 400;\">PMPML Buses<\/span><\/p>\n<\/td>\n<td>\n<p><span style=\"font-weight: 400;\">Rs 15-40<\/span><\/p>\n<\/td>\n<td>\n<p><span style=\"font-weight: 400;\">Frequent on the main Hinjewadi-Wakad-Baner stretch<\/span><\/p>\n<\/td>\n<\/tr>\n<tr>\n<td>\n<p><span style=\"font-weight: 400;\">Bike Taxi<\/span><\/p>\n<\/td>\n<td>\n<p><span style=\"font-weight: 400;\">Rs 50-150<\/span><\/p>\n<\/td>\n<td>\n<p><span style=\"font-weight: 400;\">Popular for short, traffic-heavy hops<\/span><\/p>\n<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<h2><b>What This Means for Property in Hinjewadi<\/b><\/h2>\n<p><span style=\"font-weight: 400;\">Hinjewadi&#8217;s property market has never really needed a metro to sell itself. It&#8217;s home to Infosys, Wipro, TCS, Cognizant, and dozens of other IT and GCC employers, and that alone has kept demand steady for years. What&#8217;s shifting now is the ceiling on prices, and buyers are already pricing in the metro before a single train has run.<\/span><\/p>\n<p><span style=\"font-weight: 400;\">Property rates in Hinjewadi currently sit somewhere around Rs 7,000 to Rs 10,000 per sq ft, depending on the phase and how close a project sits to one of the upcoming stations. Buildings near the Wipro Phase 2 or Infosys Phase 2 stations have reportedly seen faster appreciation than the rest of the belt, sometimes quoted at 10-15% year-on-year, though a lot of that is still speculative until the line is actually carrying passengers.<\/span><\/p>\n<p><a href=\"https:\/\/www.squareyards.com\/sale\/property-for-sale-in-hinjewadi-pune\"><span style=\"font-weight: 400;\">Property for sale in Hinjewadi<\/span><\/a><span style=\"font-weight: 400;\"> near the metro corridor is really a bet on two things happening together: the IT park expansion holding its pace and Line 3 opening on something close to the schedule officials keep announcing. Neither is guaranteed, but both look more likely today than they did a year ago.<\/span><\/p>\n<h2><b>Is It Worth Buying Property in Hinjewadi?<\/b><\/h2>\n<h3><b>A job base that doesn&#8217;t depend on the metro:\u00a0<\/b><\/h3>\n<p><span style=\"font-weight: 400;\">Infosys, Wipro, TCS, Cognizant, and a long list of GCC occupiers aren&#8217;t going anywhere, and that alone puts a floor under demand that pure infrastructure bets usually don&#8217;t have. Most upcoming metro corridors are betting on jobs following the rail line eventually. Hinjewadi already has the jobs sitting there.<\/span><\/p>\n<h3><b>Stations built into the IT park, not around it:\u00a0<\/b><\/h3>\n<p><span style=\"font-weight: 400;\">Line 3 isn&#8217;t skirting Hinjewadi from a distance the way a lot of transit projects do. Megapolis, Quadron, Infosys Phase 2, and Wipro Phase 2 sit directly inside the campuses people already work in, which is about as close to door-to-door metro access as an IT park commute gets anywhere in the country.<\/span><\/p>\n<h3><b>Room to run on price:<\/b><span style=\"font-weight: 400;\">\u00a0<\/span><\/h3>\n<p><span style=\"font-weight: 400;\">Current rates in Hinjewadi still sit below Baner and Balewadi, at roughly Rs 7,000 to Rs 10,000 per sq ft. Once Line 3 is actually carrying passengers, the area is likely to re-price closer to what those neighborhoods already command, and buyers moving now are getting in ahead of that shift rather than after it.<\/span><\/p>\n<h3><b>Rental demand that holds up regardless of the construction timeline:<\/b><span style=\"font-weight: 400;\">\u00a0<\/span><\/h3>\n<p><span style=\"font-weight: 400;\">The IT workforce keeps renting in and around Hinjewadi whether the metro opens in July or slips further, so the numbers stay reasonable even while the corridor is still under construction. That&#8217;s a cushion most pre-metro markets don&#8217;t have.<\/span><\/p>\n<h3><b>Buy closest to the stations under construction now:<\/b><span style=\"font-weight: 400;\">\u00a0<\/span><\/h3>\n<p><span style=\"font-weight: 400;\">Properties near the Infosys Phase 2 and Wipro Phase 2 stops are where the earliest appreciation is showing up, since those are the stretches tied most directly to the biggest employers on the corridor.<\/span><\/p>\n<h2><b>Nearby Localities Worth Comparing<\/b><\/h2>\n<p><span style=\"font-weight: 400;\">If you&#8217;re weighing Hinjewadi against the neighborhoods around it, metro access is only one part of the picture. Job proximity and how developed the social infrastructure already is matter just as much, and prices below should be checked against live listings before you act on them.<\/span><\/p>\n<table>\n<tbody>\n<tr>\n<td>\n<p><b>Locality<\/b><\/p>\n<\/td>\n<td>\n<p><b>Approx. Price (per sq ft)<\/b><\/p>\n<\/td>\n<td>\n<p><b>What It&#8217;s Known For<\/b><\/p>\n<\/td>\n<\/tr>\n<tr>\n<td>\n<p><a href=\"https:\/\/www.squareyards.com\/hinjewadi-in-pune-overview-852\"><span style=\"font-weight: 400;\">Hinjewadi<\/span><\/a><\/p>\n<\/td>\n<td>\n<p><span style=\"font-weight: 400;\">Rs 7,000-10,000<\/span><\/p>\n<\/td>\n<td>\n<p><span style=\"font-weight: 400;\">Rajiv Gandhi Infotech Park, GCC and IT employers, multiple upcoming metro stations<\/span><\/p>\n<\/td>\n<\/tr>\n<tr>\n<td>\n<p><a href=\"https:\/\/www.squareyards.com\/wakad-in-pune-overview-842\"><span style=\"font-weight: 400;\">Wakad<\/span><\/a><\/p>\n<\/td>\n<td>\n<p><span style=\"font-weight: 400;\">Rs 7,000-14,000<\/span><\/p>\n<\/td>\n<td>\n<p><span style=\"font-weight: 400;\">Established residential belt right next to Hinjewadi, closer to operational road links<\/span><\/p>\n<\/td>\n<\/tr>\n<tr>\n<td>\n<p><a href=\"https:\/\/www.squareyards.com\/baner-in-pune-overview-820\"><span style=\"font-weight: 400;\">Baner<\/span><\/a><\/p>\n<\/td>\n<td>\n<p><span style=\"font-weight: 400;\">Rs 12,000-22,000<\/span><\/p>\n<\/td>\n<td>\n<p><span style=\"font-weight: 400;\">Upscale, well-developed retail and dining command a premium over Hinjewadi<\/span><\/p>\n<\/td>\n<\/tr>\n<tr>\n<td>\n<p><a href=\"https:\/\/www.squareyards.com\/tathawade-in-pune-overview-846\"><span style=\"font-weight: 400;\">Tathawade<\/span><\/a><\/p>\n<\/td>\n<td>\n<p><span style=\"font-weight: 400;\">Rs 7,000-9,000<\/span><\/p>\n<\/td>\n<td>\n<p><span style=\"font-weight: 400;\">Budget-friendlier option bordering Hinjewadi Phase 3<\/span><\/p>\n<\/td>\n<\/tr>\n<tr>\n<td>\n<p><a href=\"https:\/\/www.squareyards.com\/balewadi-in-pune-overview-835\"><span style=\"font-weight: 400;\">Balewadi<\/span><\/a><\/p>\n<\/td>\n<td>\n<p><span style=\"font-weight: 400;\">Rs 9,000-16,000<\/span><\/p>\n<\/td>\n<td>\n<p><span style=\"font-weight: 400;\">The stadium and sports complex, growing residential demand, sits on the Line 3 route<\/span><\/p>\n<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<h2><b>Final Word<\/b><\/h2>\n<p><span style=\"font-weight: 400;\">The gap between Hinjewadi and the rest of Pune&#8217;s metro network has been the same story for years now: strong job demand, decent road access, and a metro line that&#8217;s always a few months away. What&#8217;s different this time is that the stations aren&#8217;t skirting the area from a distance; they&#8217;re actually being built inside it, right next to the office parks people are trying to reach.<\/span><\/p>\n<p><span style=\"font-weight: 400;\">Whether that translates into trains running by September or slips into next year is genuinely hard to call, given how many times the date has already moved. Until it does, the honest answer to &#8220;what&#8217;s the nearest metro station to Hinjewadi&#8221; is still &#8220;not one that&#8217;s running yet,&#8221; and anyone commuting in or buying property here should plan around that rather than around the announcement.<\/span><\/p>\n","protected":false},"excerpt":{"rendered":"<p>Ask anyone commuting into Rajiv Gandhi Infotech Park how they get to work, and you&#8217;ll hear the same thing: the Mumbai-Bengaluru highway, then a company bus or an Ola, then twenty minutes of bumper-to-bumper crawling near Wipro Circle. The metro, for now, is mostly something people are waiting on rather than using. That&#8217;s changing, but [&hellip;]<\/p>\n","protected":false},"author":159,"featured_media":1090208,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[218],"acf":[],"_links":{"self":[{"href":"https:\/\/www.squareyards.com\/blog\/wp-json\/wp\/v2\/posts\/1090207"}],"collection":[{"href":"https:\/\/www.squareyards.com\/blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.squareyards.com\/blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.squareyards.com\/blog\/wp-json\/wp\/v2\/users\/159"}],"replies":[{"embeddable":true,"href":"https:\/\/www.squareyards.com\/blog\/wp-json\/wp\/v2\/comments?post=1090207"}],"version-history":[{"count":1,"href":"https:\/\/www.squareyards.com\/blog\/wp-json\/wp\/v2\/posts\/1090207\/revisions"}],"predecessor-version":[{"id":1090209,"href":"https:\/\/www.squareyards.com\/blog\/wp-json\/wp\/v2\/posts\/1090207\/revisions\/1090209"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.squareyards.com\/blog\/wp-json\/wp\/v2\/media\/1090208"}],"wp:attachment":[{"href":"https:\/\/www.squareyards.com\/blog\/wp-json\/wp\/v2\/media?parent=1090207"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.squareyards.com\/blog\/wp-json\/wp\/v2\/categories?post=1090207"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}