{"id":1092286,"date":"2026-10-30T13:57:25","date_gmt":"2026-10-30T08:27:25","guid":{"rendered":"https:\/\/www.squareyards.com\/blog\/?p=1092286"},"modified":"2026-10-30T13:57:25","modified_gmt":"2026-10-30T08:27:25","slug":"kolkata-metro-beleghata-it-centre","status":"publish","type":"post","link":"https:\/\/www.squareyards.com\/blog\/kolkata-metro-beleghata-it-centre","title":{"rendered":"Kolkata Metro targets December services on Beleghata\u2013IT Center stretch"},"content":{"rendered":"<p><span style=\"font-weight: 400;\">Kolkata Metro is targeting passenger services by December 2026 on the 4.5-km Beleghata\u2013IT Center stretch of the Orange Line. The extension will add three stations and connect the existing New Garia\u2013Beleghata service to Salt Lake Sector V. Operations remain subject to testing and safety clearance, and no firm opening date has been announced.<\/span><\/p>\n<p><span style=\"font-weight: 400;\">Improved access to Sector V\u2019s employment hub could influence housing demand in connected parts of eastern Kolkata. The impact will depend on station access, feeder services, job growth and civic infrastructure; the metro link alone does not guarantee rising property prices.<\/span><\/p>\n<h2><b>Kolkata Metro Beleghata\u2013IT Center stretch: Project details<\/b><\/h2>\n<table style=\"width: 63.348%;\">\n<tbody>\n<tr>\n<td style=\"width: 16.8966%;\">\n<p><b>Project detail<\/b><\/p>\n<\/td>\n<td style=\"width: 82.8736%;\">\n<p><b>Information<\/b><\/p>\n<\/td>\n<\/tr>\n<tr>\n<td style=\"width: 16.8966%;\">\n<p><span style=\"font-weight: 400;\">Metro line<\/span><\/p>\n<\/td>\n<td style=\"width: 82.8736%;\">\n<p><span style=\"font-weight: 400;\">Orange Line, part of the Kavi Subhash\u2013Jai Hind Bimanbandar corridor<\/span><\/p>\n<\/td>\n<\/tr>\n<tr>\n<td style=\"width: 16.8966%;\">\n<p><span style=\"font-weight: 400;\">Section<\/span><\/p>\n<\/td>\n<td style=\"width: 82.8736%;\">\n<p><span style=\"font-weight: 400;\">Beleghata to IT Center, Salt Lake Sector V<\/span><\/p>\n<\/td>\n<\/tr>\n<tr>\n<td style=\"width: 16.8966%;\">\n<p><span style=\"font-weight: 400;\">Length<\/span><\/p>\n<\/td>\n<td style=\"width: 82.8736%;\">\n<p><span style=\"font-weight: 400;\">Approximately 4.5 km<\/span><\/p>\n<\/td>\n<\/tr>\n<tr>\n<td style=\"width: 16.8966%;\">\n<p><span style=\"font-weight: 400;\">Stations to be added<\/span><\/p>\n<\/td>\n<td style=\"width: 82.8736%;\">\n<p><span style=\"font-weight: 400;\">Gour Kishore Ghosh (Chingrighata), Nalban and IT Center<\/span><\/p>\n<\/td>\n<\/tr>\n<tr>\n<td style=\"width: 16.8966%;\">\n<p><span style=\"font-weight: 400;\">Current status<\/span><\/p>\n<\/td>\n<td style=\"width: 82.8736%;\">\n<p><span style=\"font-weight: 400;\">Trial runs began in October 2026; testing and safety clearance are required before passenger services<\/span><\/p>\n<\/td>\n<\/tr>\n<tr>\n<td style=\"width: 16.8966%;\">\n<p><span style=\"font-weight: 400;\">Target<\/span><\/p>\n<\/td>\n<td style=\"width: 82.8736%;\">\n<p><span style=\"font-weight: 400;\">December 2026; no firm passenger-service date has been announced<\/span><\/p>\n<\/td>\n<\/tr>\n<tr>\n<td style=\"width: 16.8966%;\">\n<p><span style=\"font-weight: 400;\">Network connection<\/span><\/p>\n<\/td>\n<td style=\"width: 82.8736%;\">\n<p><span style=\"font-weight: 400;\">The Orange Line will connect with the Green Line at Sector V<\/span><\/p>\n<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<h2><b>Extension brings metro closer to Salt Lake Sector V<\/b><\/h2>\n<p><span style=\"font-weight: 400;\">The Beleghata\u2013IT Center section is the next phase of the Orange Line, which already operates between Kavi Subhash in New Garia and Beleghata. Once opened, the extension will provide a direct metro link between southern Kolkata and the IT Center in <\/span><a href=\"https:\/\/www.squareyards.com\/salt-lake-sector-v-in-kolkata-overview-15279\"><span style=\"font-weight: 400;\">Salt Lake Sector V<\/span><\/a><span style=\"font-weight: 400;\">. The interchange with the Green Line will connect Orange Line passengers to the Salt Lake\u2013Howrah corridor.<\/span><\/p>\n<p><span style=\"font-weight: 400;\">The remaining Orange Line sections toward New Town and the airport are separate phases and are not included in the Beleghata\u2013IT Center opening.<\/span><\/p>\n<h2><b>Housing demand could rise near connected areas<\/b><\/h2>\n<p><span style=\"font-weight: 400;\">Sector V\u2019s concentration of offices provides the extension with a clear commuter link. Easier access may support rental demand among people working in the IT district, including those in residential areas connected to Sector V by the metro and feeder roads.<\/span><\/p>\n<p><a href=\"https:\/\/www.squareyards.com\/beliaghata-in-kolkata-overview-1234\"><span style=\"font-weight: 400;\">Beleghata<\/span><\/a><span style=\"font-weight: 400;\"> and parts of the EM Bypass corridor may also benefit from improved access to the wider network. <\/span><a href=\"https:\/\/www.squareyards.com\/new-garia-in-kolkata-overview-4258\"><span style=\"font-weight: 400;\">New Garia<\/span><\/a><span style=\"font-weight: 400;\">, already served by the Orange Line, could benefit from a direct connection to Sector V. The effect is likely to vary by neighborhood: homes within easy reach of stations and local transport may be better positioned than properties near the alignment but without easy access.<\/span><\/p>\n<h2><b>A snapshot of property prices near the Orange Line\u00a0<\/b><\/h2>\n<p><span style=\"font-weight: 400;\">The table below compares indicative residential asking prices in selected localities connected to the Orange Line, based on September 2026 listings.\u00a0<\/span><\/p>\n<table style=\"width: 41.3047%;\">\n<tbody>\n<tr>\n<td style=\"width: 23.2323%;\">\n<p><b>Area<\/b><\/p>\n<\/td>\n<td style=\"width: 71.8676%;\">\n<p><b>Indicative asking rate<\/b><\/p>\n<\/td>\n<\/tr>\n<tr>\n<td style=\"width: 23.2323%;\">\n<p><span style=\"font-weight: 400;\">Beleghata<\/span><\/p>\n<\/td>\n<td style=\"width: 71.8676%;\">\n<p><span style=\"font-weight: 400;\">About Rs 9,450 psf<\/span><\/p>\n<\/td>\n<\/tr>\n<tr>\n<td style=\"width: 23.2323%;\">\n<p><span style=\"font-weight: 400;\">New Garia<\/span><\/p>\n<\/td>\n<td style=\"width: 71.8676%;\">\n<p><span style=\"font-weight: 400;\">About Rs 5,200\u2013Rs 5,250 psf<\/span><\/p>\n<\/td>\n<\/tr>\n<tr>\n<td style=\"width: 23.2323%;\">\n<p><a href=\"https:\/\/www.squareyards.com\/em-bypass-in-kolkata-overview-15178\"><span style=\"font-weight: 400;\">EM Bypass<\/span><\/a><\/p>\n<\/td>\n<td style=\"width: 71.8676%;\">\n<p><span style=\"font-weight: 400;\">About Rs 13,400\u2013Rs 13,750 psf<\/span><\/p>\n<\/td>\n<\/tr>\n<tr>\n<td style=\"width: 23.2323%;\">\n<p><span style=\"font-weight: 400;\">Salt Lake Sector V<\/span><\/p>\n<\/td>\n<td style=\"width: 71.8676%;\">\n<p><span style=\"font-weight: 400;\">Rs 11,450 per sq ft for apartments; Rs 10,250 psf for office space<\/span><\/p>\n<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<p><b>*Source: Square Yards Research<\/b><\/p>\n<p><span style=\"font-weight: 400;\">The figures provide a snapshot of the current market, not evidence that the upcoming metro extension has driven price changes. They should also not be compared directly without accounting for differences in property type, project, location, and available inventory.<\/span><b>\u00a0<\/b><\/p>\n<h2><b>Metro access is one factor in the property outlook<\/b><\/h2>\n<p><span style=\"font-weight: 400;\">A direct connection to Sector V may make some residential locations more convenient for office commuters, but it is too early to attribute housing or price growth to the extension. Last-mile transport, station access, public services, and sustained employment demand will shape the longer-term effect.<\/span><\/p>\n<p><span style=\"font-weight: 400;\">For now, the confirmed development is the extension of metro connectivity to IT Center, pending completion of the trial and safety approvals. The real estate opportunity is potential demand in connected residential catchments, not evidence of a price surge.<\/span><\/p>\n","protected":false},"excerpt":{"rendered":"<p>Kolkata Metro is targeting passenger services by December 2026 on the 4.5-km Beleghata\u2013IT Center stretch of the Orange Line. The extension will add three stations and connect the existing New Garia\u2013Beleghata service to Salt Lake Sector V. Operations remain subject to testing and safety clearance, and no firm opening date has been announced. Improved access [&hellip;]<\/p>\n","protected":false},"author":71,"featured_media":1092288,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"footnotes":""},"categories":[29381],"class_list":["post-1092286","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-new-upcoming-projects"],"acf":[],"_links":{"self":[{"href":"https:\/\/www.squareyards.com\/blog\/wp-json\/wp\/v2\/posts\/1092286","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.squareyards.com\/blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.squareyards.com\/blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.squareyards.com\/blog\/wp-json\/wp\/v2\/users\/71"}],"replies":[{"embeddable":true,"href":"https:\/\/www.squareyards.com\/blog\/wp-json\/wp\/v2\/comments?post=1092286"}],"version-history":[{"count":1,"href":"https:\/\/www.squareyards.com\/blog\/wp-json\/wp\/v2\/posts\/1092286\/revisions"}],"predecessor-version":[{"id":1092289,"href":"https:\/\/www.squareyards.com\/blog\/wp-json\/wp\/v2\/posts\/1092286\/revisions\/1092289"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.squareyards.com\/blog\/wp-json\/wp\/v2\/media\/1092288"}],"wp:attachment":[{"href":"https:\/\/www.squareyards.com\/blog\/wp-json\/wp\/v2\/media?parent=1092286"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.squareyards.com\/blog\/wp-json\/wp\/v2\/categories?post=1092286"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}