{"id":1092938,"date":"2026-11-24T13:40:23","date_gmt":"2026-11-24T08:10:23","guid":{"rendered":"https:\/\/www.squareyards.com\/blog\/?p=1092938"},"modified":"2026-11-24T13:40:23","modified_gmt":"2026-11-24T08:10:23","slug":"nhai-moves-ahead-with-rs-15000-crore-mumbai-pune-greenfield-expressway","status":"publish","type":"post","link":"https:\/\/www.squareyards.com\/blog\/nhai-moves-ahead-with-rs-15000-crore-mumbai-pune-greenfield-expressway","title":{"rendered":"NHAI moves ahead with Rs 15,000-crore Mumbai-Pune Greenfield Expressway"},"content":{"rendered":"<p><span style=\"font-weight: 400;\">The National Highways Authority of India (NHAI) has moved the first package of the proposed Rs 15,000-crore Mumbai-Pune Greenfield Expressway into the tender process. The wider project is planned as a roughly 130-km, eight-lane corridor connecting the Navi Mumbai region with Pune. It is expected to provide an additional high-capacity road link between the two regions. The expressway also aims to improve access to the Jawaharlal Nehru Port Authority (JNPA) area and reduce the Mumbai-Pune journey time to around 90 minutes.<\/span><\/p>\n<p><span style=\"font-weight: 400;\">The first tender covers a 29.2-km stretch from Pagote to Chowk in Maharashtra. The NHAI e-procurement schedule lists 24 December 2026 as the bid opening date. This section is planned as a six-lane highway under the BOT (Toll) model and includes two tunnels through the Sahyadri range. The remaining stretch of around 100 km towards Pune is still at the planning and detailed project report (DPR) stage.<\/span><\/p>\n<h2><span style=\"font-weight: 400;\">Mumbai-Pune Expressway: Key project details<\/span><\/h2>\n<p><span style=\"font-weight: 400;\">The proposed Mumbai-Pune Greenfield Expressway is expected to strengthen road connectivity between the Mumbai Metropolitan Region and Pune. Here are the key details of the proposed expressway.<\/span><\/p>\n<table style=\"width: 84.3545%;\">\n<tbody>\n<tr>\n<td style=\"text-align: center; width: 37.051%;\">\n<p><b>Particulars<\/b><\/p>\n<\/td>\n<td style=\"text-align: center; width: 94.3289%;\">\n<p><b>Details<\/b><\/p>\n<\/td>\n<\/tr>\n<tr>\n<td style=\"text-align: center; width: 37.051%;\">\n<p><span style=\"font-weight: 400;\">Project<\/span><\/p>\n<\/td>\n<td style=\"text-align: center; width: 94.3289%;\">\n<p><span style=\"font-weight: 400;\">New Mumbai-Pune Greenfield Expressway<\/span><\/p>\n<\/td>\n<\/tr>\n<tr>\n<td style=\"text-align: center; width: 37.051%;\">\n<p><span style=\"font-weight: 400;\">Proposed length<\/span><\/p>\n<\/td>\n<td style=\"text-align: center; width: 94.3289%;\">\n<p><span style=\"font-weight: 400;\">Around 130 km<\/span><\/p>\n<\/td>\n<\/tr>\n<tr>\n<td style=\"text-align: center; width: 37.051%;\">\n<p><span style=\"font-weight: 400;\">Planned configuration<\/span><\/p>\n<\/td>\n<td style=\"text-align: center; width: 94.3289%;\">\n<p><span style=\"font-weight: 400;\">Eight lanes for the wider corridor<\/span><\/p>\n<\/td>\n<\/tr>\n<tr>\n<td style=\"text-align: center; width: 37.051%;\">\n<p><span style=\"font-weight: 400;\">Estimated project cost<\/span><\/p>\n<\/td>\n<td style=\"text-align: center; width: 94.3289%;\">\n<p><span style=\"font-weight: 400;\">Rs 15,000 crore<\/span><\/p>\n<\/td>\n<\/tr>\n<tr>\n<td style=\"text-align: center; width: 37.051%;\">\n<p><span style=\"font-weight: 400;\">Target travel time<\/span><\/p>\n<\/td>\n<td style=\"text-align: center; width: 94.3289%;\">\n<p><span style=\"font-weight: 400;\">Around 90 minutes<\/span><\/p>\n<\/td>\n<\/tr>\n<tr>\n<td style=\"text-align: center; width: 37.051%;\">\n<p><span style=\"font-weight: 400;\">First tendered package<\/span><\/p>\n<\/td>\n<td style=\"text-align: center; width: 94.3289%;\">\n<p><span style=\"font-weight: 400;\">29.2 km, Pagote to Chowk<\/span><\/p>\n<\/td>\n<\/tr>\n<tr>\n<td style=\"text-align: center; width: 37.051%;\">\n<p><span style=\"font-weight: 400;\">First package configuration<\/span><\/p>\n<\/td>\n<td style=\"text-align: center; width: 94.3289%;\">\n<p><span style=\"font-weight: 400;\">Six lanes, BOT (Toll) mode<\/span><\/p>\n<\/td>\n<\/tr>\n<tr>\n<td style=\"text-align: center; width: 37.051%;\">\n<p><span style=\"font-weight: 400;\">Key structures<\/span><\/p>\n<\/td>\n<td style=\"text-align: center; width: 94.3289%;\">\n<p><span style=\"font-weight: 400;\">Two tunnels through the Sahyadri range<\/span><\/p>\n<\/td>\n<\/tr>\n<tr>\n<td style=\"text-align: center; width: 37.051%;\">\n<p><span style=\"font-weight: 400;\">Implementing agency<\/span><\/p>\n<\/td>\n<td style=\"text-align: center; width: 94.3289%;\">\n<p><span style=\"font-weight: 400;\">National Highways Authority of India (NHAI)<\/span><\/p>\n<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<h2><span style=\"font-weight: 400;\">NHAI advances tender process for Pagote-Chowk stretch<\/span><\/h2>\n<p><span style=\"font-weight: 400;\">The first package Mumbai-Pune Greenfield Expressway covers 29.2 km, starting near Pagote at its junction with NH-348 (earlier referred to as NH4B) and ending at Chowk, where it will meet NH-48. It has an estimated tender value of around Rs 3,653 crore. The tender specifies a construction period of 910 days. The tender describes this section as a six-lane greenfield highway to be developed under the build-operate-transfer (Toll) model. This is distinct from the wider 130-km corridor, which is being described as an eight-lane expressway.<\/span><\/p>\n<p><span style=\"font-weight: 400;\">The package includes two tunnels through the Sahyadri range. These tunnels are expected to help the road pass through the hilly terrain while reducing the need for a longer surface alignment. The tender schedule has been revised through subsequent corrigenda. The NHAI e-procurement listing records the bid opening date as 24 December 2026. The tender process is not the same as the start of full-scale construction.\u00a0<\/span><\/p>\n<h2><span style=\"font-weight: 400;\">Mumbai-Pune Greenfield Expressway route and key connectivity\u00a0<\/span><\/h2>\n<p><span style=\"font-weight: 400;\">The proposed Mumbai-Pune Greenfield Expressway corridor is intended to strengthen road links between the Navi Mumbai region, the Jawaharlal Nehru Port Authority (JNPA) area and Pune. It is planned as an alternative route running parallel to the existing Mumbai-Pune Expressway. The Pagote end will connect with the NH-348 network, while the Chowk end meets NH-48. The wider route is planned to continue towards Shivare village near Bhor, with a link to the Pune Ring Road.<\/span><\/p>\n<p><span style=\"font-weight: 400;\">The corridor is also expected to improve access to the <\/span><a href=\"https:\/\/www.squareyards.com\/blog\/mumbai-pune-expressway-linking-atal-setu-impact\"><span style=\"font-weight: 400;\">Atal Setu<\/span><\/a><span style=\"font-weight: 400;\"> and the wider Navi Mumbai transport and logistics network. For freight movement, the link could benefit businesses operating around JNPA and industrial areas in the Raigad belt. The final travel pattern will depend on the completed alignment, junction design, and connecting road infrastructure.<\/span><\/p>\n<h3><span style=\"font-weight: 400;\">A new road link between Mumbai and Pune<\/span><\/h3>\n<p><span style=\"font-weight: 400;\">The existing Mumbai-Pune road journey is served by established highway infrastructure, including the Mumbai-Pune Expressway and the old Mumbai-Pune highway. The proposed Mumbai-Pune Greenfield Expressway route is intended to add capacity and provide another connection between the two urban regions, particularly for traffic linked to Navi Mumbai, JNPA and the Pune side.<\/span><\/p>\n<p><span style=\"font-weight: 400;\">The proposed 90-minute journey is an indicative target. Actual travel times will depend on the final route, access points, traffic conditions, toll arrangements, and the time needed to connect from local destinations to the expressway.<\/span><\/p>\n<h2><span style=\"font-weight: 400;\">Real estate markets along the proposed corridor<\/span><\/h2>\n<p><span style=\"font-weight: 400;\">Large road projects can influence where homebuyers, businesses and logistics operators look for property. The effect is usually gradual and depends on more than the expressway alone. Local employment, public transport, social infrastructure, project supply and the quality of last-mile access also shape demand. The corridor may bring added attention to parts of Navi Mumbai, Raigad and Pune.<\/span><\/p>\n<h3><span style=\"font-weight: 400;\">Panvel and Ulwe: Navi Mumbai&#8217;s growth belt<\/span><\/h3>\n<p><span style=\"font-weight: 400;\"><a href=\"https:\/\/www.squareyards.com\/property-rates\/panvel\">Panvel<\/a> is an important junction in the wider Navi Mumbai growth area, with access to major road links and the JNPA side. Square Yards lists an indicative average asking price of about Rs 15,450 per square foot (psf) for Panvel. <a href=\"https:\/\/www.squareyards.com\/ulwe-in-navi-mumbai-overview-959\">Ulwe<\/a>, which is part of the wider Navi Mumbai market, has an indicative average asking price of around Rs 17,700 psf. These are asking-price indicators and can vary by project, sector, property type, and configuration.<\/span><\/p>\n<h3><span style=\"font-weight: 400;\">Kharghar and Taloja: Residential markets at different price points<\/span><\/h3>\n<p><span style=\"font-weight: 400;\"><a href=\"https:\/\/www.squareyards.com\/kharghar-in-navi-mumbai-overview-940\">Kharghar<\/a> has an established residential base and access to key parts of Navi Mumbai. Its indicative average asking price on Square Yards is around Rs 19,150 psf. <a href=\"https:\/\/www.squareyards.com\/taloja-in-navi-mumbai-overview-4783\">Taloja<\/a> offers a comparatively lower entry point in parts of the market, with an indicative figure of around Rs 11,400 psf. The two locations serve different buyer budgets and should not be treated as one uniform market.<\/span><\/p>\n<h3><span style=\"font-weight: 400;\">Hinjewadi and Wakad: Pune&#8217;s employment-linked markets<\/span><\/h3>\n<p><span style=\"font-weight: 400;\">On the Pune side, Hinjewadi and Wakad are relevant because of their links to the city\u2019s employment and residential belt. Square Yards lists indicative average asking prices of around Rs 11,400 psf in <a href=\"https:\/\/www.squareyards.com\/hinjewadi-in-pune-overview-852\">Hinjewadi<\/a> and Rs 12,700 psf in <a href=\"https:\/\/www.squareyards.com\/wakad-in-pune-overview-842\">Wakad<\/a>. The expressway\u2019s eventual connection with the Pune Ring Road and local road network will matter more to these markets than the headline project length alone.<\/span><\/p>\n<p><b><i>Note:<\/i><\/b><i><span style=\"font-weight: 400;\"> The quoted rates are indicative asking prices, not registered transaction values. Prices can differ considerably across sectors, buildings, age of construction and amenities.<\/span><\/i><\/p>\n<h2><span style=\"font-weight: 400;\">Potential boost to logistics and industrial activity<\/span><\/h2>\n<p><span style=\"font-weight: 400;\">The Mumbai-Pune Greenfield Expressway corridor could have a wider role beyond passenger travel. Improved road access between Navi Mumbai, JNPA and industrial locations in Raigad may support freight movement, warehousing and distribution activity. The Pune end could also benefit businesses that need road access to the city\u2019s manufacturing and technology employment clusters.<\/span><\/p>\n<p><span style=\"font-weight: 400;\">For property markets, this may create demand for industrial plots, warehouses and worker housing in selected locations. The scale of that demand will depend on the final alignment, access-controlled entry points, supporting infrastructure and the pace at which the project is delivered.<\/span><\/p>\n","protected":false},"excerpt":{"rendered":"<p>The National Highways Authority of India (NHAI) has moved the first package of the proposed Rs 15,000-crore Mumbai-Pune Greenfield Expressway into the tender process. The wider project is planned as a roughly 130-km, eight-lane corridor connecting the Navi Mumbai region with Pune. It is expected to provide an additional high-capacity road link between the two [&hellip;]<\/p>\n","protected":false},"author":134,"featured_media":1092939,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"footnotes":""},"categories":[29381],"class_list":["post-1092938","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-new-upcoming-projects"],"acf":[],"_links":{"self":[{"href":"https:\/\/www.squareyards.com\/blog\/wp-json\/wp\/v2\/posts\/1092938","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.squareyards.com\/blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.squareyards.com\/blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.squareyards.com\/blog\/wp-json\/wp\/v2\/users\/134"}],"replies":[{"embeddable":true,"href":"https:\/\/www.squareyards.com\/blog\/wp-json\/wp\/v2\/comments?post=1092938"}],"version-history":[{"count":1,"href":"https:\/\/www.squareyards.com\/blog\/wp-json\/wp\/v2\/posts\/1092938\/revisions"}],"predecessor-version":[{"id":1092941,"href":"https:\/\/www.squareyards.com\/blog\/wp-json\/wp\/v2\/posts\/1092938\/revisions\/1092941"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.squareyards.com\/blog\/wp-json\/wp\/v2\/media\/1092939"}],"wp:attachment":[{"href":"https:\/\/www.squareyards.com\/blog\/wp-json\/wp\/v2\/media?parent=1092938"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.squareyards.com\/blog\/wp-json\/wp\/v2\/categories?post=1092938"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}