{"id":71737,"date":"2022-11-15T16:29:19","date_gmt":"2022-11-15T10:59:19","guid":{"rendered":"https:\/\/www.squareyards.com\/blog\/?p=71737"},"modified":"2026-06-10T14:21:17","modified_gmt":"2026-06-10T08:51:17","slug":"dholera-smart-city-smcart","status":"publish","type":"post","link":"https:\/\/www.squareyards.com\/blog\/dholera-smart-city-smcart","title":{"rendered":"Dholera Smart City Gujarat: Objective, Projects and Current Status (2026)"},"content":{"rendered":"<p><span style=\"font-weight: 400;\">Dholera Smart City is India&#8217;s first fully planned greenfield smart city, located in Gujarat. Spread across 920 sq. km., the Dholera Special Investment Region (DSIR) is being developed as part of the Delhi\u2013Mumbai Industrial Corridor (DMIC) &#8211; with the ambition of becoming a world-class industrial, commercial and residential hub. It sits roughly 100 km south-west of Ahmedabad and is designed to eventually house up to 2 million residents.<\/span><\/p>\n<p><span style=\"font-weight: 400;\">This isn&#8217;t another urban development project with a glossy brochure and vague timelines. Dholera is a government-backed mission to fundamentally rethink how Indian cities get built, powered and governed &#8211; and in 2026, that mission has real, visible momentum behind it.<\/span><\/p>\n<h2><span style=\"font-weight: 400;\">Quick Facts About Dholera Smart City<\/span><\/h2>\n<table>\n<tbody>\n<tr>\n<td>\n<p><span style=\"font-weight: 400;\">Parameter<\/span><\/p>\n<\/td>\n<td>\n<p><span style=\"font-weight: 400;\">Details<\/span><\/p>\n<\/td>\n<\/tr>\n<tr>\n<td>\n<p><span style=\"font-weight: 400;\">Location<\/span><\/p>\n<\/td>\n<td>\n<p><span style=\"font-weight: 400;\">Gujarat, India (~100 km from Ahmedabad)<\/span><\/p>\n<\/td>\n<\/tr>\n<tr>\n<td>\n<p><span style=\"font-weight: 400;\">Total Area<\/span><\/p>\n<\/td>\n<td>\n<p><span style=\"font-weight: 400;\">920 sq. km.<\/span><\/p>\n<\/td>\n<\/tr>\n<tr>\n<td>\n<p><span style=\"font-weight: 400;\">Governing Body<\/span><\/p>\n<\/td>\n<td>\n<p><span style=\"font-weight: 400;\">DICDL (Dholera Industrial City Development Ltd.)<\/span><\/p>\n<\/td>\n<\/tr>\n<tr>\n<td>\n<p><span style=\"font-weight: 400;\">Part of<\/span><\/p>\n<\/td>\n<td>\n<p><span style=\"font-weight: 400;\">Delhi\u2013Mumbai Industrial Corridor (DMIC)<\/span><\/p>\n<\/td>\n<\/tr>\n<tr>\n<td>\n<p><span style=\"font-weight: 400;\">Phase 1 Activation Area<\/span><\/p>\n<\/td>\n<td>\n<p><span style=\"font-weight: 400;\">22.5 sq. km.<\/span><\/p>\n<\/td>\n<\/tr>\n<tr>\n<td>\n<p><span style=\"font-weight: 400;\">Planned Population Capacity<\/span><\/p>\n<\/td>\n<td>\n<p><span style=\"font-weight: 400;\">Up to 2 million<\/span><\/p>\n<\/td>\n<\/tr>\n<tr>\n<td>\n<p><span style=\"font-weight: 400;\">Key Infrastructure<\/span><\/p>\n<\/td>\n<td>\n<p><span style=\"font-weight: 400;\">Airport, Solar Park, Expressway, ICT Network<\/span><\/p>\n<\/td>\n<\/tr>\n<tr>\n<td>\n<p><span style=\"font-weight: 400;\">Current Status<\/span><\/p>\n<\/td>\n<td>\n<p><span style=\"font-weight: 400;\">Phase 1 infrastructure under advanced development (2026)<\/span><\/p>\n<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<h2><span style=\"font-weight: 400;\">What Makes Dholera a True Greenfield Smart City?<\/span><\/h2>\n<p><span style=\"font-weight: 400;\">The Dholera Special Investment Region (DSIR) is one of India&#8217;s largest and most ambitious industrial-urban ventures. At approximately 920 square kilometres, it sits at the intersection of four major Gujarat cities &#8211; Ahmedabad, Rajkot, Vadodara (Baroda) and Bhavnagar &#8211; a geographic sweet spot that planners didn&#8217;t stumble into by accident.<\/span><\/p>\n<p><span style=\"font-weight: 400;\">Here&#8217;s what separates Dholera from every other &#8220;smart city&#8221; you&#8217;ve heard about: every road, utility line, drainage channel and digital network is being laid before a single resident or business moves in. That&#8217;s the textbook definition of a greenfield smart city &#8211; not retrofitted infrastructure awkwardly patched onto old city bones, but a purpose-built urban system designed from a blank canvas.<\/span><\/p>\n<p><span style=\"font-weight: 400;\">The city features top-class ICT (Information and Communication Technology) infrastructure ensuring high-speed connectivity across its entire footprint. Its position along the Central Spine Expressway, combined with the upcoming Dholera International Airport, gives it a logistics backbone that most established Indian cities still don&#8217;t have. For investors and homebuyers evaluating Dholera SIR plots and Dholera residential plots in 2026, this combination of government backing, planned infrastructure and strategic location is where the real conversation starts.<\/span><\/p>\n<h2><span style=\"font-weight: 400;\">Primary Objectives of Dholera Smart City<\/span><\/h2>\n<p><span style=\"font-weight: 400;\">Dholera Smart City isn&#8217;t being built around a vague &#8220;world-class city&#8221; aspiration. There&#8217;s a structured vision and\u00a0 the objectives that guide the Dholera City project are specific enough to be held accountable:<\/span><\/p>\n<ul>\n<li><span style=\"font-weight: 400;\">24\/7 Smart Power Supply &#8211; Power smart meters accessible round-the-clock, with solar electricity as the primary energy source for urban services.<\/span><\/li>\n<li><span style=\"font-weight: 400;\">Eco-Friendly Design &#8211; Walking and cycling lanes lined with trees, green corridors and parks integrated throughout the city layout &#8211; not squeezed in as afterthoughts.<\/span><\/li>\n<li><span style=\"font-weight: 400;\">Zero-Waste Ambition &#8211; Maximum recycling of waste goods, wastewater reuse systems and incinerator-based waste-to-energy conversion built into the city&#8217;s core operations.<\/span><\/li>\n<li><span style=\"font-weight: 400;\">ICT-Enabled Infrastructure &#8211; An Integrated City Management System (ICCC) to manage traffic, utilities, surveillance and emergency services from a single central command.<\/span><\/li>\n<li><span style=\"font-weight: 400;\">Industrial Wastewater Management &#8211; Dedicated collection systems so industrial discharge doesn&#8217;t contaminate the broader environment.<\/span><\/li>\n<li><span style=\"font-weight: 400;\">Open Storm Drainage &#8211; Planned storm channels to prevent flooding &#8211; a lesson learned the hard way from older Indian cities.<\/span><\/li>\n<li><span style=\"font-weight: 400;\">Citizen-First Urban Planning &#8211; Every decision benchmarked against how it actually improves quality of life for residents and their livelihoods.<\/span><\/li>\n<li><span style=\"font-weight: 400;\">Sustainable Housing for 7 Lakh+ People &#8211; Positioned 50 km south of Ahmedabad, Dholera will provide housing for over 700,000 people in Phase 1 alone.<\/span><\/li>\n<li><span style=\"font-weight: 400;\">Global Financial and Industrial Hub &#8211; The long-term goal is to position Dholera India as a genuine world-class destination for finance, manufacturing and logistics.<\/span><\/li>\n<li><span style=\"font-weight: 400;\">Multimodal Connectivity &#8211; Roads, railways, ports and digital highways working together to move people, goods and data efficiently.<\/span><\/li>\n<li><span style=\"font-weight: 400;\">Complete Urban Services &#8211; Schools, hospitals, multi-functional parks, community halls and colleges, all connected via a green transit corridor.<\/span><\/li>\n<li><span style=\"font-weight: 400;\">Pollution Reduction by Design &#8211; The city is planned to reduce traffic congestion and air pollution structurally, not just through policy mandates that may or may not be enforced.<\/span><\/li>\n<\/ul>\n<h2><span style=\"font-weight: 400;\">Who Is Actually Building Dholera Smart City?<\/span><\/h2>\n<p><span style=\"font-weight: 400;\">The Dholera Smart City project is implemented through a Special Purpose Vehicle (SPV) created jointly by the Gujarat State Government and the National Industrial Corridor Development Corporation (NICDC) Trust under the Central Government.<\/span><\/p>\n<p><span style=\"font-weight: 400;\">That SPV is called the Dholera Industrial City Development Limited (DICDL). It handles all planning, execution and management of infrastructure development across the DSIR.<\/span><\/p>\n<p><span style=\"font-weight: 400;\">The dual involvement of state and central government bodies is worth paying attention to. It adds a layer of institutional credibility and financial stability that private township projects simply cannot replicate &#8211; which is a meaningful factor when you&#8217;re evaluating the risk profile of investing in Dholera Smart City.<\/span><\/p>\n<h2><span style=\"font-weight: 400;\">Dholera Smart City Projects: What&#8217;s Being Built Right Now<\/span><\/h2>\n<p><span style=\"font-weight: 400;\">The Dholera Investment Region project is grounded in the Special Investment Region (SIR) Act of 2009, which gave Gujarat the legal framework to declare large-scale investment regions and develop them with dedicated governance structures.<\/span><\/p>\n<p><span style=\"font-weight: 400;\">The DSIR covers 920 sq. km. across 22 villages &#8211; a development zone large enough to host entire industrial ecosystems, not just individual factories or housing clusters. And unlike typical SEZs or industrial parks, the Dholera SIR city integrates residential, commercial, recreational and industrial zones within one master-planned geography.<\/span><\/p>\n<p><span style=\"font-weight: 400;\">Because Dholera is part of the DMIC corridor, it inherits committed logistical support &#8211; reliable road, rail and port connectivity with minimal disruption. For businesses, that translates to lower supply chain costs and faster market access than most competing industrial locations in western India.<\/span><\/p>\n<h2><span style=\"font-weight: 400;\">2026 Project Status<\/span><\/h2>\n<table>\n<tbody>\n<tr>\n<td>\n<p><span style=\"font-weight: 400;\">Project<\/span><\/p>\n<\/td>\n<td>\n<p><span style=\"font-weight: 400;\">Contractor<\/span><\/p>\n<\/td>\n<td>\n<p><span style=\"font-weight: 400;\">Status<\/span><\/p>\n<\/td>\n<td>\n<p><span style=\"font-weight: 400;\">Estimated Cost<\/span><\/p>\n<\/td>\n<\/tr>\n<tr>\n<td>\n<p><span style=\"font-weight: 400;\">Design &amp; Construction of ABCD Building<\/span><\/p>\n<\/td>\n<td>\n<p><span style=\"font-weight: 400;\">Cube Construction &amp; Engineering Ltd<\/span><\/p>\n<\/td>\n<td>\n<p><span style=\"font-weight: 400;\">Completed<\/span><\/p>\n<\/td>\n<td>\n<p><span style=\"font-weight: 400;\">\u20b972.31 Cr<\/span><\/p>\n<\/td>\n<\/tr>\n<tr>\n<td>\n<p><span style=\"font-weight: 400;\">Raw Water Transmission Main<\/span><\/p>\n<\/td>\n<td>\n<p><span style=\"font-weight: 400;\">D.R. Agarwal Infra Pvt Ltd<\/span><\/p>\n<\/td>\n<td>\n<p><span style=\"font-weight: 400;\">Completed<\/span><\/p>\n<\/td>\n<td>\n<p><span style=\"font-weight: 400;\">\u20b929.67 Cr<\/span><\/p>\n<\/td>\n<\/tr>\n<tr>\n<td>\n<p><span style=\"font-weight: 400;\">Adhiya River Bunding Phase 1<\/span><\/p>\n<\/td>\n<td>\n<p><span style=\"font-weight: 400;\">Jugalkishor Ramkishan Agarwal Pvt Ltd<\/span><\/p>\n<\/td>\n<td>\n<p><span style=\"font-weight: 400;\">Completed<\/span><\/p>\n<\/td>\n<td>\n<p><span style=\"font-weight: 400;\">\u20b911.87 Cr<\/span><\/p>\n<\/td>\n<\/tr>\n<tr>\n<td>\n<p><span style=\"font-weight: 400;\">Interior Works of BBC Building<\/span><\/p>\n<\/td>\n<td>\n<p><span style=\"font-weight: 400;\">New Concept<\/span><\/p>\n<\/td>\n<td>\n<p><span style=\"font-weight: 400;\">Completed<\/span><\/p>\n<\/td>\n<td>\n<p><span style=\"font-weight: 400;\">\u20b919.44 Cr<\/span><\/p>\n<\/td>\n<\/tr>\n<tr>\n<td>\n<p><span style=\"font-weight: 400;\">Experience Zone at ABCD Building<\/span><\/p>\n<\/td>\n<td>\n<p><span style=\"font-weight: 400;\">Tagbin<\/span><\/p>\n<\/td>\n<td>\n<p><span style=\"font-weight: 400;\">Completed<\/span><\/p>\n<\/td>\n<td>\n<p><span style=\"font-weight: 400;\">\u20b94.84 Cr<\/span><\/p>\n<\/td>\n<\/tr>\n<tr>\n<td>\n<p><span style=\"font-weight: 400;\">Design &amp; Construction of Roads and Services<\/span><\/p>\n<\/td>\n<td>\n<p><span style=\"font-weight: 400;\">Larsen &amp; Toubro Ltd<\/span><\/p>\n<\/td>\n<td>\n<p><span style=\"font-weight: 400;\">Ongoing<\/span><\/p>\n<\/td>\n<td>\n<p><span style=\"font-weight: 400;\">\u20b91,801.07 Cr<\/span><\/p>\n<\/td>\n<\/tr>\n<tr>\n<td>\n<p><span style=\"font-weight: 400;\">Canal Front Development Zone 2<\/span><\/p>\n<\/td>\n<td>\n<p><span style=\"font-weight: 400;\">P.R. Patel &amp; Company<\/span><\/p>\n<\/td>\n<td>\n<p><span style=\"font-weight: 400;\">Ongoing<\/span><\/p>\n<\/td>\n<td>\n<p><span style=\"font-weight: 400;\">\u20b926.43 Cr<\/span><\/p>\n<\/td>\n<\/tr>\n<tr>\n<td>\n<p><span style=\"font-weight: 400;\">Canal Front Development Zone 3<\/span><\/p>\n<\/td>\n<td>\n<p><span style=\"font-weight: 400;\">P.R. Patel &amp; Company<\/span><\/p>\n<\/td>\n<td>\n<p><span style=\"font-weight: 400;\">Ongoing<\/span><\/p>\n<\/td>\n<td>\n<p><span style=\"font-weight: 400;\">\u20b914.99 Cr<\/span><\/p>\n<\/td>\n<\/tr>\n<tr>\n<td>\n<p><span style=\"font-weight: 400;\">Service Area Buildings<\/span><\/p>\n<\/td>\n<td>\n<p><span style=\"font-weight: 400;\">Bridge &amp; Roof Co. India Ltd<\/span><\/p>\n<\/td>\n<td>\n<p><span style=\"font-weight: 400;\">Ongoing<\/span><\/p>\n<\/td>\n<td>\n<p><span style=\"font-weight: 400;\">\u20b932.82 Cr<\/span><\/p>\n<\/td>\n<\/tr>\n<tr>\n<td>\n<p><span style=\"font-weight: 400;\">Common Effluent Treatment Plant<\/span><\/p>\n<\/td>\n<td>\n<p><span style=\"font-weight: 400;\">Larsen &amp; Toubro Ltd<\/span><\/p>\n<\/td>\n<td>\n<p><span style=\"font-weight: 400;\">Ongoing<\/span><\/p>\n<\/td>\n<td>\n<p><span style=\"font-weight: 400;\">\u20b9156.86 Cr<\/span><\/p>\n<\/td>\n<\/tr>\n<tr>\n<td>\n<p><span style=\"font-weight: 400;\">Sewage Treatment Plant (10 MLD)<\/span><\/p>\n<\/td>\n<td>\n<p><span style=\"font-weight: 400;\">Larsen &amp; Toubro Ltd<\/span><\/p>\n<\/td>\n<td>\n<p><span style=\"font-weight: 400;\">Ongoing<\/span><\/p>\n<\/td>\n<td>\n<p><span style=\"font-weight: 400;\">\u20b953.13 Cr<\/span><\/p>\n<\/td>\n<\/tr>\n<tr>\n<td>\n<p><span style=\"font-weight: 400;\">Balance Works of WTP<\/span><\/p>\n<\/td>\n<td>\n<p><span style=\"font-weight: 400;\">MS Khurana Engineering Ltd<\/span><\/p>\n<\/td>\n<td>\n<p><span style=\"font-weight: 400;\">Ongoing<\/span><\/p>\n<\/td>\n<td>\n<p><span style=\"font-weight: 400;\">\u20b987.97 Cr<\/span><\/p>\n<\/td>\n<\/tr>\n<tr>\n<td>\n<p><span style=\"font-weight: 400;\">Earth Filling in Activation Area Plots<\/span><\/p>\n<\/td>\n<td>\n<p><span style=\"font-weight: 400;\">Montecarlo Ltd<\/span><\/p>\n<\/td>\n<td>\n<p><span style=\"font-weight: 400;\">Ongoing<\/span><\/p>\n<\/td>\n<td>\n<p><span style=\"font-weight: 400;\">\u20b986.01 Cr<\/span><\/p>\n<\/td>\n<\/tr>\n<tr>\n<td>\n<p><span style=\"font-weight: 400;\">ICT MSI Project<\/span><\/p>\n<\/td>\n<td>\n<p><span style=\"font-weight: 400;\">D.R. Agarwal Infra Pvt Ltd<\/span><\/p>\n<\/td>\n<td>\n<p><span style=\"font-weight: 400;\">Ongoing<\/span><\/p>\n<\/td>\n<td>\n<p><span style=\"font-weight: 400;\">\u20b968.99 Cr<\/span><\/p>\n<\/td>\n<\/tr>\n<tr>\n<td>\n<p><span style=\"font-weight: 400;\">Interior Works of SPV Building<\/span><\/p>\n<\/td>\n<td>\n<p><span style=\"font-weight: 400;\">New Concept<\/span><\/p>\n<\/td>\n<td>\n<p><span style=\"font-weight: 400;\">Ongoing<\/span><\/p>\n<\/td>\n<td>\n<p><span style=\"font-weight: 400;\">\u20b915.58 Cr<\/span><\/p>\n<\/td>\n<\/tr>\n<tr>\n<td>\n<p><span style=\"font-weight: 400;\">Adhiya River Bunding Phase 2<\/span><\/p>\n<\/td>\n<td>\n<p><span style=\"font-weight: 400;\">Kalthia Engineering &amp; Construction Ltd<\/span><\/p>\n<\/td>\n<td>\n<p><span style=\"font-weight: 400;\">Ongoing<\/span><\/p>\n<\/td>\n<td>\n<p><span style=\"font-weight: 400;\">\u20b921.25 Cr<\/span><\/p>\n<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<h3><span style=\"font-weight: 400;\">ABCD Building &#8211; The Operational Heart of Dholera<\/span><\/h3>\n<p><span style=\"font-weight: 400;\">The ABCD Building in Dholera &#8211; Administration, Business, Convention and Display &#8211; is the nerve centre of the entire city project. Now completed and operational, it houses coordination offices, an experience zone and a digital display area that brings the Dholera master plan to life visually. If you want to understand what the city will actually look like at full build-out, this is where that picture takes shape.<\/span><\/p>\n<h3><span style=\"font-weight: 400;\">Dholera International Airport &#8211; Where Things Stand in 2026<\/span><\/h3>\n<p><span style=\"font-weight: 400;\">The Dholera International Airport, located at Navagam, crossed its most critical structural milestone at the end of last year. Phase 1 civil works were completed in December 2025 and the airport moved into its licensing and trial phase in early 2026. Here&#8217;s the current picture as of June 2026:<\/span><\/p>\n<ul>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">Area: 1,426 hectares<\/span><\/li>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">Runway: 3,200 m Code 4E runway &#8211; ready and capable of handling wide-body aircraft<\/span><\/li>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">Passenger Terminal: Structure complete<\/span><\/li>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">ATC Tower: Built and in place<\/span><\/li>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">Cargo Handling Facility: Operational<\/span><\/li>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">Calibration Flights: Conducted January\u2013February 2026<\/span><\/li>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">Full Passenger Operations (Phase 1): Targeted for December 2026, pending final AAI approval<\/span><\/li>\n<\/ul>\n<p><span style=\"font-weight: 400;\">Phase 2 will eventually add a second, longer runway (4,000 m), expanded terminal capacity and infrastructure scaled for 30\u201350 million passengers annually &#8211; though those timelines are yet to be officially announced.<\/span><\/p>\n<p><span style=\"font-weight: 400;\">Once fully operational, the airport will connect Dholera directly to national and international routes, significantly boosting Dholera land prices while anchoring industrial logistics at a scale the region hasn&#8217;t seen before.<\/span><\/p>\n<h3><span style=\"font-weight: 400;\">Ahmedabad\u2013Dholera Expressway &#8211; Open and Running<\/span><\/h3>\n<p><span style=\"font-weight: 400;\">The Ahmedabad\u2013Dholera Expressway (NH-751) is a 109 km, four-lane access-controlled corridor &#8211; expandable to 12 lanes in the future. It was inaugurated by Prime Minister Narendra Modi on 23 February 2026 and is now fully operational. That date marks one of the most significant infrastructure milestones in Dholera&#8217;s development history.<\/span><\/p>\n<ul>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">Travel time between Ahmedabad and Dholera: reduced to 45\u201350 minutes (from over 2 hours previously)<\/span><\/li>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">Connects Sardar Patel Ring Road, Ahmedabad to Adhelai, near Bhavnagar<\/span><\/li>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">Passes through the Dholera Activation Area with a dedicated interchange<\/span><\/li>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">Integrates with the broader Ahmedabad\u2013Baroda Express Highway network<\/span><\/li>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">Supports daily industrial commuting, freight movement and supply chain logistics<\/span><\/li>\n<\/ul>\n<p><span style=\"font-weight: 400;\">Land values near the expressway corridor have already seen an estimated 25% appreciation since the inauguration, according to market observers. For anyone evaluating plots in Dholera Smart City, this is no longer a &#8220;coming soon&#8221; story &#8211; the road is open today and carrying traffic.<\/span><\/p>\n<h3><span style=\"font-weight: 400;\">Dholera Solar Park &#8211; Clean Energy at Serious Scale<\/span><\/h3>\n<p><span style=\"font-weight: 400;\">The Dholera Solar Park is an Ultra Mega Solar Power Project with a planned total capacity of 5,000 MW by 2030 &#8211; positioning it among India&#8217;s largest renewable energy projects. It spans over 11,000 hectares in TP Zone 6, on barren land specifically repurposed for large-scale solar generation.<\/span><\/p>\n<p><span style=\"font-weight: 400;\">Where things stand in 2026:<\/span><\/p>\n<ul>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">Phase I (300 MW): Operational since 2022, developed by Tata Power Renewable Energy Limited<\/span><\/li>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">Phase II: Under regulatory review<\/span><\/li>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">Remaining Phases: In planning, with government-backed auctions underway<\/span><\/li>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">Supporting bodies: DSIRDA, SECI, GUVNL, GPCL and POWERGRID<\/span><\/li>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">Power purchase agreements (PPAs): 25-year contracts providing long-term revenue stability<\/span><\/li>\n<\/ul>\n<p><span style=\"font-weight: 400;\">The solar park currently powers early industrial and residential zones within the Activation Area with clean, cost-efficient electricity. As phases progress, it will serve high-load users &#8211; including the Tata Electronics semiconductor fab, which requires a reliable, uninterrupted green power supply that most industrial locations in India genuinely can&#8217;t guarantee.<\/span><\/p>\n<h2><span style=\"font-weight: 400;\">Dholera Smart City Industries: What&#8217;s Driving Growth<\/span><\/h2>\n<p><span style=\"font-weight: 400;\">The industrial framework of Dholera SIR Gujarat is built to attract both domestic and global manufacturers. The city&#8217;s plug-and-play infrastructure means businesses can start operations faster than in any traditionally developed industrial zone in India &#8211; and the sector mix reflects serious intent rather than aspirational category-filling.<\/span><\/p>\n<p><span style=\"font-weight: 400;\">Electronics &amp; Semiconductors &#8211; Tata Electronics is building India&#8217;s first commercial-scale 300mm semiconductor fab at Dholera, in partnership with Taiwan&#8217;s Powerchip Semiconductor Manufacturing Corporation (PSMC). Investment: \u20b991,000 crore. Capacity: 50,000 wafers\/month. Chip nodes: 28nm, 40nm, 55nm, 90nm, 110nm. Construction is approximately 50% complete as of April 2026, with trial production targeted for December 2026. In May 2026, Tata Electronics also signed an MoU with ASML for lithography technology &#8211; a landmark deal that marks India&#8217;s entry into serious commercial chip manufacturing.<\/span><\/p>\n<ul>\n<li><span style=\"font-weight: 400;\">Heavy Engineering &#8211; Large-scale fabrication and machinery manufacturing.<\/span><\/li>\n<li><span style=\"font-weight: 400;\">Defence Manufacturing &#8211; Leveraging India&#8217;s broader defence corridor investments.<\/span><\/li>\n<li><span style=\"font-weight: 400;\">Emerging High-Tech Technologies &#8211; AI, robotics and precision manufacturing.<\/span><\/li>\n<li><span style=\"font-weight: 400;\">General Manufacturing &#8211; Across FMCG, packaging and auto-ancillaries.<\/span><\/li>\n<li><span style=\"font-weight: 400;\">Agriculture &amp; Food Processing &#8211; Leveraging Gujarat&#8217;s substantial agri-output.<\/span><\/li>\n<li><span style=\"font-weight: 400;\">Biotechnology &amp; Pharmaceuticals &#8211; Continuing Gujarat&#8217;s established pharma legacy.<\/span><\/li>\n<li><span style=\"font-weight: 400;\">Metal Materials &amp; Processing &#8211; Upstream and downstream metallurgy.<\/span><\/li>\n<li><span style=\"font-weight: 400;\">Renewable Energy &#8211; Solar panel and solar cell manufacturing (ReNew Power and similar players).<\/span><\/li>\n<\/ul>\n<p><span style=\"font-weight: 400;\">For investors looking at Dholera city Gujarat from an industrial land perspective, this sector mix signals strong long-term job creation and sustained demand for commercial and industrial plots.<\/span><\/p>\n<h2><span style=\"font-weight: 400;\">Zones of Dholera Smart City: How the 920 Sq. Km. Is Allocated<\/span><\/h2>\n<p><span style=\"font-weight: 400;\">Dholera&#8217;s master plan follows a precisely calibrated land-use framework &#8211; every zone percentage is designed to create a self-sustaining city that functions independently without leaning on nearby metros.<\/span><\/p>\n<table style=\"width: 53.6473%;\">\n<tbody>\n<tr>\n<td style=\"width: 50.6775%;\">\n<p><span style=\"font-weight: 400;\">Zone Type<\/span><\/p>\n<\/td>\n<td style=\"width: 72.6287%;\">\n<p><span style=\"font-weight: 400;\">Percentage of Total Area<\/span><\/p>\n<\/td>\n<\/tr>\n<tr>\n<td style=\"width: 50.6775%;\">\n<p><span style=\"font-weight: 400;\">Commercial Area<\/span><\/p>\n<\/td>\n<td style=\"width: 72.6287%;\">\n<p><span style=\"font-weight: 400;\">47%<\/span><\/p>\n<\/td>\n<\/tr>\n<tr>\n<td style=\"width: 50.6775%;\">\n<p><span style=\"font-weight: 400;\">Housing Area<\/span><\/p>\n<\/td>\n<td style=\"width: 72.6287%;\">\n<p><span style=\"font-weight: 400;\">28%<\/span><\/p>\n<\/td>\n<\/tr>\n<tr>\n<td style=\"width: 50.6775%;\">\n<p><span style=\"font-weight: 400;\">Common Amenities<\/span><\/p>\n<\/td>\n<td style=\"width: 72.6287%;\">\n<p><span style=\"font-weight: 400;\">8%<\/span><\/p>\n<\/td>\n<\/tr>\n<tr>\n<td style=\"width: 50.6775%;\">\n<p><span style=\"font-weight: 400;\">Roadways<\/span><\/p>\n<\/td>\n<td style=\"width: 72.6287%;\">\n<p><span style=\"font-weight: 400;\">6%<\/span><\/p>\n<\/td>\n<\/tr>\n<tr>\n<td style=\"width: 50.6775%;\">\n<p><span style=\"font-weight: 400;\">Corridor with Easy Access<\/span><\/p>\n<\/td>\n<td style=\"width: 72.6287%;\">\n<p><span style=\"font-weight: 400;\">4%<\/span><\/p>\n<\/td>\n<\/tr>\n<tr>\n<td style=\"width: 50.6775%;\">\n<p><span style=\"font-weight: 400;\">Tourism<\/span><\/p>\n<\/td>\n<td style=\"width: 72.6287%;\">\n<p><span style=\"font-weight: 400;\">3%<\/span><\/p>\n<\/td>\n<\/tr>\n<tr>\n<td style=\"width: 50.6775%;\">\n<p><span style=\"font-weight: 400;\">Sports &amp; Recreation<\/span><\/p>\n<\/td>\n<td style=\"width: 72.6287%;\">\n<p><span style=\"font-weight: 400;\">3%<\/span><\/p>\n<\/td>\n<\/tr>\n<tr>\n<td style=\"width: 50.6775%;\">\n<p><span style=\"font-weight: 400;\">Others<\/span><\/p>\n<\/td>\n<td style=\"width: 72.6287%;\">\n<p><span style=\"font-weight: 400;\">1%<\/span><\/p>\n<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<p><span style=\"font-weight: 400;\">The commercial zone&#8217;s 47% allocation reflects Dholera&#8217;s primary positioning as an industrial and business city rather than a purely residential one. That has direct implications for Dholera plot prices and ROI potential &#8211; this city is built for economic output first and\u00a0 residential growth will follow that engine.<\/span><\/p>\n<h2><span style=\"font-weight: 400;\">Divisions of Dholera Smart City: Functional Zones That Define Land Use<\/span><\/h2>\n<p><span style=\"font-weight: 400;\">Beyond the broad zone percentages, the city is divided into functional areas, each designed to serve a specific role:<\/span><\/p>\n<p><span style=\"font-weight: 400;\">Sports Zone &amp; City Center &#8211; Located along the 250 Metre Expressway, this forms the civic heart of the city.<\/span><\/p>\n<p><span style=\"font-weight: 400;\">Information Technology Zone &#8211; A dedicated cluster for IT companies, data centres and innovation labs.<\/span><\/p>\n<p><span style=\"font-weight: 400;\">Green Zone &#8211; Open lands, parks, wetlands and ecological buffers that ensure Dholera remains a livable city rather than just an industrial one.<\/span><\/p>\n<p><span style=\"font-weight: 400;\">Easy Access Corridor &#8211; High-connectivity spine roads and transit routes linking all major zones seamlessly.<\/span><\/p>\n<p><span style=\"font-weight: 400;\">These divisions directly determine which Dholera SIR plots are zoned for residential, commercial or industrial use &#8211; and therefore how their values are likely to move over time.<\/span><\/p>\n<h2><span style=\"font-weight: 400;\">Current Status of Dholera Smart City: Phase 1 Progress in 2026<\/span><\/h2>\n<p><span style=\"font-weight: 400;\">As of 2026, Dholera Smart City is well into Phase 1 execution. The momentum here isn&#8217;t theoretical anymore.<\/span><\/p>\n<h3><span style=\"font-weight: 400;\">Phase 1 &#8211; What&#8217;s Happened and What&#8217;s Happening Now<\/span><\/h3>\n<p><span style=\"font-weight: 400;\">The Activation Area (22.5 sq. km.) is the city&#8217;s first operational industrial zone under Town Planning Schemes 2A and 4A &#8211; with 72 km of internal roads, a 50 MLD water treatment plant and 430 MW power substations all in place.<\/span><\/p>\n<p><span style=\"font-weight: 400;\">The Ahmedabad\u2013Dholera Expressway (NH-751) was inaugurated by PM Modi on 23 February 2026 and is now fully operational, cutting Ahmedabad\u2013Dholera travel time to under 50 minutes.<\/span><\/p>\n<p><span style=\"font-weight: 400;\">The Dholera International Airport completed Phase 1 civil construction in December 2025. The runway is ready, the terminal structure is complete and the ATC tower is built. Full passenger operations are targeted for December 2026, pending AAI approval.<\/span><\/p>\n<p><span style=\"font-weight: 400;\">The Dholera Solar Park Phase I (300 MW) has been operational since 2022. Further phases are progressing toward the 5,000 MW target by 2030.<\/span><\/p>\n<p><span style=\"font-weight: 400;\">Tata Electronics&#8217; semiconductor fab at Dholera is approximately 50% constructed as of April 2026, with trial production of India&#8217;s first commercial chips expected by December 2026. The \u20b991,000 crore project is backed by PSMC (Taiwan) for process technology and ASML for lithography &#8211; making it one of the most consequential private investments in India&#8217;s industrial history.<\/span><\/p>\n<h3><span style=\"font-weight: 400;\">Phase 2 &#8211; What&#8217;s Next<\/span><\/h3>\n<p><span style=\"font-weight: 400;\">Phase 2 will build on Town Planning Schemes 3 and 4, expanding the residential and commercial zones beyond the Activation Area. It will commence after Phase 1 infrastructure is fully commissioned, with timelines expected to firm up through 2026\u20132028.<\/span><\/p>\n<h2><span style=\"font-weight: 400;\">Dholera Plot Price &#8211; What Investors Need to Know<\/span><\/h2>\n<p><span style=\"font-weight: 400;\">Dholera land prices have been appreciating steadily as major infrastructure milestones get delivered. The expressway opened in February 2026 and land near the corridor has already seen an estimated 25% price uptick according to market observers. With the airport moving through its final trial and licensing phase, another round of appreciation is widely expected once commercial operations begin.<\/span><\/p>\n<p><span style=\"font-weight: 400;\">Current Dholera plot prices vary by zone, size and TP scheme. Residential plots in and around the Activation Area are the most actively traded. Commercial and industrial plots positioned along the expressway corridor and near the airport typically command a premium over other zones.<\/span><\/p>\n<p><span style=\"font-weight: 400;\">One important note: always verify plot approvals, RERA registration and DICDL-authorised developer status before any purchase. Dholera&#8217;s land market, like any high-growth city in early development, has genuine opportunities &#8211; and real risks that require careful due diligence.<\/span><\/p>\n<h2><span style=\"font-weight: 400;\">Dholera Smart City Map: How to Read the Master Plan<\/span><\/h2>\n<p><span style=\"font-weight: 400;\">The Dholera Smart City map gives a clear picture of how the 920 sq. km. is divided into town planning zones, industrial corridors, residential sectors, green belts and transport arteries.<\/span><\/p>\n<p><span style=\"font-weight: 400;\">The official city map is available at the DICDL portal: dholera.gujarat.gov.in<\/span><\/p>\n<p><span style=\"font-weight: 400;\">The map visually clarifies the location of the Activation Area relative to the full DSIR boundary, zone allocations (commercial, residential, green, IT, sports), road and expressway alignments and\u00a0 airport corridor positioning.<\/span><\/p>\n<p><span style=\"font-weight: 400;\">If you&#8217;re evaluating plots in Dholera Smart City, referring to the official map before making any decision is non-negotiable.<\/span><\/p>\n<h2><span style=\"font-weight: 400;\">Dholera Smart City Portal: Registration Guide<\/span><\/h2>\n<p><span style=\"font-weight: 400;\">The official Dholera Smart City portal gives citizens, investors and businesses access to project updates, services and registration features. Here&#8217;s how to create your account:<\/span><\/p>\n<ol>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">Visit the official website: https:\/\/dholera.gujarat.gov.in\/web\/login<\/span><\/li>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">Click the Register button at the upper right corner of the homepage.<\/span><\/li>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">Select Register from the options.<\/span><\/li>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">Enter your name, email address and mobile number.<\/span><\/li>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">You&#8217;ll receive an OTP on your registered mobile number.<\/span><\/li>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">Verify the OTP, create a secure password and click Register.<\/span><\/li>\n<\/ol>\n<p><span style=\"font-weight: 400;\">You&#8217;re now registered on the Dholera Smart City portal.<\/span><\/p>\n<h3><span style=\"font-weight: 400;\">Citizen Services Available on the Portal in 2026<\/span><\/h3>\n<p><span style=\"font-weight: 400;\">As of 2026, the Dholera Smart City portal provides live project updates to track which infrastructure projects are completed or ongoing, maps and zone details to understand land allocations, stakeholder registration for businesses, investors and residents and\u00a0 direct contact and grievance channels with DICDL.<\/span><\/p>\n<p><span style=\"font-weight: 400;\">As the city&#8217;s infrastructure matures, the portal is expected to expand into utility management, permit applications and community notifications.<\/span><\/p>\n<h3><span style=\"font-weight: 400;\">Contact Information<\/span><\/h3>\n<p><span style=\"font-weight: 400;\">Dholera Industrial City Development Ltd. (DICDL)<\/span><\/p>\n<p><span style=\"font-weight: 400;\">Address: 6th Floor, Block No. 1 &amp; 2, Udyog Bhavan, Sector 11, Gandhinagar, Gujarat \u2013 382017, India Phone: 079 \u2013 29750500 \/ 29750501 Email: info@dicdl.in Official Website: dholera.gujarat.gov.in<\/span><\/p>\n<p><span style=\"font-weight: 400;\">Should You Consider Dholera? A Practical Decision Framework<\/span><\/p>\n<table>\n<tbody>\n<tr>\n<td>\n<p><span style=\"font-weight: 400;\">Factor<\/span><\/p>\n<\/td>\n<td>\n<p><span style=\"font-weight: 400;\">Status in 2026<\/span><\/p>\n<\/td>\n<\/tr>\n<tr>\n<td>\n<p><span style=\"font-weight: 400;\">Government backing<\/span><\/p>\n<\/td>\n<td>\n<p><span style=\"font-weight: 400;\">Strong &#8211; Central + State SPV (DICDL)<\/span><\/p>\n<\/td>\n<\/tr>\n<tr>\n<td>\n<p><span style=\"font-weight: 400;\">Expressway<\/span><\/p>\n<\/td>\n<td>\n<p><span style=\"font-weight: 400;\">Operational since February 2026 (inaugurated by PM Modi)<\/span><\/p>\n<\/td>\n<\/tr>\n<tr>\n<td>\n<p><span style=\"font-weight: 400;\">Airport access<\/span><\/p>\n<\/td>\n<td>\n<p><span style=\"font-weight: 400;\">Phase 1 civil works complete; full ops targeted Dec 2026<\/span><\/p>\n<\/td>\n<\/tr>\n<tr>\n<td>\n<p><span style=\"font-weight: 400;\">Industrial anchor<\/span><\/p>\n<\/td>\n<td>\n<p><span style=\"font-weight: 400;\">Tata Electronics fab ~50% built; trial production Dec 2026<\/span><\/p>\n<\/td>\n<\/tr>\n<tr>\n<td>\n<p><span style=\"font-weight: 400;\">Energy security<\/span><\/p>\n<\/td>\n<td>\n<p><span style=\"font-weight: 400;\">300 MW solar power operational; 5,000 MW target by 2030<\/span><\/p>\n<\/td>\n<\/tr>\n<tr>\n<td>\n<p><span style=\"font-weight: 400;\">Plot availability<\/span><\/p>\n<\/td>\n<td>\n<p><span style=\"font-weight: 400;\">Residential, commercial, industrial options available<\/span><\/p>\n<\/td>\n<\/tr>\n<tr>\n<td>\n<p><span style=\"font-weight: 400;\">Risk factors<\/span><\/p>\n<\/td>\n<td>\n<p><span style=\"font-weight: 400;\">Long development timeline; always verify RERA before buying<\/span><\/p>\n<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<h2><span style=\"font-weight: 400;\">Dholera Smart City Pros and Cons: An Honest Assessment<\/span><\/h2>\n<table>\n<tbody>\n<tr>\n<td>\n<p><span style=\"font-weight: 400;\">Pros<\/span><\/p>\n<\/td>\n<td>\n<p><span style=\"font-weight: 400;\">Cons<\/span><\/p>\n<\/td>\n<\/tr>\n<tr>\n<td>\n<p><span style=\"font-weight: 400;\">Government-backed, low developer risk<\/span><\/p>\n<\/td>\n<td>\n<p><span style=\"font-weight: 400;\">Still under development &#8211; full city is years away<\/span><\/p>\n<\/td>\n<\/tr>\n<tr>\n<td>\n<p><span style=\"font-weight: 400;\">First mover advantage in India&#8217;s largest greenfield smart city<\/span><\/p>\n<\/td>\n<td>\n<p><span style=\"font-weight: 400;\">Long-term investment horizon required<\/span><\/p>\n<\/td>\n<\/tr>\n<tr>\n<td>\n<p><span style=\"font-weight: 400;\">Airport, expressway, solar park all progressing well<\/span><\/p>\n<\/td>\n<td>\n<p><span style=\"font-weight: 400;\">Limited immediate social infrastructure (schools, hospitals)<\/span><\/p>\n<\/td>\n<\/tr>\n<tr>\n<td>\n<p><span style=\"font-weight: 400;\">Tata Semiconductor investment signals global credibility<\/span><\/p>\n<\/td>\n<td>\n<p><span style=\"font-weight: 400;\">Plot market requires careful due diligence<\/span><\/p>\n<\/td>\n<\/tr>\n<tr>\n<td>\n<p><span style=\"font-weight: 400;\">Clean, planned infrastructure from the ground up<\/span><\/p>\n<\/td>\n<td>\n<p><span style=\"font-weight: 400;\">Distance from Ahmedabad still a daily commute factor<\/span><\/p>\n<\/td>\n<\/tr>\n<tr>\n<td>\n<p><span style=\"font-weight: 400;\">Strong potential for capital appreciation<\/span><\/p>\n<\/td>\n<td>\n<p><span style=\"font-weight: 400;\">Returns depend on pace of government execution<\/span><\/p>\n<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<h2><span style=\"font-weight: 400;\">To Wrap Things Up<\/span><\/h2>\n<p><span style=\"font-weight: 400;\">Dholera Smart City is more than an infrastructure project &#8211; it is India&#8217;s most serious attempt at building a world-class city from the ground up. With backing from both the Central and Gujarat state governments, the city carries institutional stability that most private township projects simply cannot offer.<\/span><\/p>\n<p><span style=\"font-weight: 400;\">In 2026, the momentum here is structural, not speculative. The expressway was inaugurated in February 2026 and is carrying traffic today. The airport has completed its civil construction and is in final trials ahead of commercial operations. The solar park is generating power. The Tata Electronics semiconductor fab is half-built and targeting India&#8217;s first commercial chip by December 2026. The Activation Area is live and open for industry.<\/span><\/p>\n<p><span style=\"font-weight: 400;\">Whether you&#8217;re a potential resident thinking long-term about housing, a business scouting industrial locations or an investor evaluating Dholera smart city plots &#8211; the city&#8217;s fundamentals are getting measurably stronger every year. The key is making decisions on verified information: using official DICDL sources, checking RERA approvals and giving the project the time horizon it genuinely deserves.<\/span><\/p>\n<p><span style=\"font-weight: 400;\">Dholera Gujarat is not a story of what might happen. It&#8217;s a story of what&#8217;s already happening.<\/span><\/p>\n","protected":false},"excerpt":{"rendered":"<p>Dholera Smart City is India&#8217;s first fully planned greenfield smart city, located in Gujarat. Spread across 920 sq. km., the Dholera Special Investment Region (DSIR) is being developed as part of the Delhi\u2013Mumbai Industrial Corridor (DMIC) &#8211; with the ambition of becoming a world-class industrial, commercial and residential hub. It sits roughly 100 km south-west [&hellip;]<\/p>\n","protected":false},"author":88,"featured_media":71743,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[222],"acf":[],"_links":{"self":[{"href":"https:\/\/www.squareyards.com\/blog\/wp-json\/wp\/v2\/posts\/71737"}],"collection":[{"href":"https:\/\/www.squareyards.com\/blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.squareyards.com\/blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.squareyards.com\/blog\/wp-json\/wp\/v2\/users\/88"}],"replies":[{"embeddable":true,"href":"https:\/\/www.squareyards.com\/blog\/wp-json\/wp\/v2\/comments?post=71737"}],"version-history":[{"count":13,"href":"https:\/\/www.squareyards.com\/blog\/wp-json\/wp\/v2\/posts\/71737\/revisions"}],"predecessor-version":[{"id":1087974,"href":"https:\/\/www.squareyards.com\/blog\/wp-json\/wp\/v2\/posts\/71737\/revisions\/1087974"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.squareyards.com\/blog\/wp-json\/wp\/v2\/media\/71743"}],"wp:attachment":[{"href":"https:\/\/www.squareyards.com\/blog\/wp-json\/wp\/v2\/media?parent=71737"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.squareyards.com\/blog\/wp-json\/wp\/v2\/categories?post=71737"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}