{"id":73597,"date":"2022-12-12T12:23:10","date_gmt":"2022-12-12T06:53:10","guid":{"rendered":"https:\/\/www.squareyards.com\/blog\/?p=73597"},"modified":"2026-03-25T16:27:25","modified_gmt":"2026-03-25T10:57:25","slug":"kochi-smart-city-smcart","status":"publish","type":"post","link":"https:\/\/www.squareyards.com\/blog\/kochi-smart-city-smcart","title":{"rendered":"Smart City Kochi: Mission, Objective, Projects &#038; Current Status"},"content":{"rendered":"\r\n<p class=\"has-text-align-justify\"><span style=\"font-weight: 400;\">An integrated business hub called Smart City Kochi is being marketed by Dubai Holding which is an investment management firm worldwide. It has headquarters in the United Arab Emirates and the Keralan government. SmartCity Kochi would be home to knowledge-based firms that aspire to serve their worldwide clientele from the Indian Subcontinent, creating a network of opportunities.<\/span><\/p>\r\n\r\n\r\n\r\n<p class=\"has-text-align-justify\"><span style=\"font-weight: 400;\">Spread on 246 acres, or 1 million square metres of land, SmartCity Kochi will abide by global sustainability standards that safeguard the environment and give its residents relaxing, productive, and pleasant spaces for work and play. It also has a great spot for transporting goods in and out of the southern west coastal lines. Including this, the geographical attributes never fail to make it look like a futuristic city with the calibre to serve the development aspects.\u00a0<\/span><\/p>\r\n\r\n\r\n\r\n<div class=\"wp-block-yoast-seo-table-of-contents yoast-table-of-contents\">\r\n<h2>Table of contents<\/h2>\r\n<ul>\r\n<li><a href=\"#h-smart-city-kochi-objectives\" data-level=\"2\">Smart City Kochi Objectives<\/a><\/li>\r\n<li><a href=\"#h-kochi-smart-city-portal-projects\" data-level=\"2\">Kochi Smart City Portal Projects<\/a>\r\n<ul>\r\n<li><a href=\"#h-completed-project\" data-level=\"3\">Completed Project<\/a><\/li>\r\n<li><a href=\"#h-in-progress-projects-status\" data-level=\"3\">In-Progress Projects Status<\/a><\/li>\r\n<li><a href=\"#h-tender-projects-status\" data-level=\"3\">Tender Projects Status<\/a><\/li>\r\n<\/ul>\r\n<\/li>\r\n<li><a href=\"#h-kochi-smart-city-portal-map\" data-level=\"2\">Kochi Smart City Portal Map<\/a><\/li>\r\n<li><a href=\"#h-how-to-log-in-to-the-kochi-smart-city-portal\" data-level=\"2\">How to Log In to the Kochi Smart City Portal?<\/a><\/li>\r\n<li><a href=\"#h-kochi-smart-city-citizen-services\" data-level=\"2\">Kochi Smart City: Citizen Services<\/a>\r\n<ul>\r\n<li><a href=\"#h-e-payment-kochi-smart-city-citizen-services\" data-level=\"3\">e-Payment Kochi Smart City Citizen Services<\/a><\/li>\r\n<li><a href=\"#h-government-to-citizens-services-g2c\" data-level=\"3\">Government To Citizens Services (G2C)<\/a><\/li>\r\n<li><a href=\"#h-business-to-citizens-services-b2c\" data-level=\"3\">Business to Citizens Services (B2C)<\/a><\/li>\r\n<\/ul>\r\n<\/li>\r\n<li><a href=\"#h-faq-s-about-smart-city-kochi\" data-level=\"2\">FAQ&#8217;s about Smart City Kochi<\/a><\/li>\r\n<\/ul>\r\n<\/div>\r\n\r\n\r\n\r\n<h2 class=\"wp-block-heading\" id=\"h-smart-city-kochi-objectives\">Smart City Kochi Objectives<\/h2>\r\n\r\n\r\n\r\n<p class=\"has-text-align-justify\"><span style=\"font-weight: 400;\">Here are some major aims that are taken care of in <a href=\"https:\/\/www.squareyards.com\/blog\/smart-cities-india-smcart\" target=\"_blank\" rel=\"noopener\">Smart City<\/a> Kochi projects to promote global sustainability in every possible aspects.\u00a0<\/span><\/p>\r\n\r\n\r\n\r\n<ul>\r\n<li style=\"font-weight: 400; text-align: justify;\" aria-level=\"1\"><span style=\"font-weight: 400;\">Creating a comprehensive water transportation system that connects the city&#8217;s Fort Kochi and Central City neighbourhoods. This system will include a contemporary ferry service, improved road access to jetties, and repair of current jetties.<\/span><\/li>\r\n<li style=\"font-weight: 400; text-align: justify;\" aria-level=\"1\"><span style=\"font-weight: 400;\">Restoring the city&#8217;s existing parks and waterways and building new plazas, canal paths, and green spaces.<\/span><\/li>\r\n<li style=\"font-weight: 400; text-align: justify;\" aria-level=\"1\"><span style=\"font-weight: 400;\">Reclaiming Fort Kochi-reputation Mattancherry as a centre for culture and heritage, as well as the city&#8217;s commercial hub. This includes rehabilitation and brand building (such as the Kochi Biennale).<\/span><\/li>\r\n<li style=\"font-weight: 400; text-align: justify;\" aria-level=\"1\"><span style=\"font-weight: 400;\">Establishing a network of green, smart transportation that offers autos, pedestrians, and cyclists safe, seamless travel. This involves enhancing last-mile connectivity and multimodal transportation links through bike-sharing programmes. Additionally, developing pedestrian-friendly and pedestrianised roadways is a priority.<\/span><\/li>\r\n<li style=\"font-weight: 400; text-align: justify;\" aria-level=\"1\"><span style=\"font-weight: 400;\">Redevelopment of slum regions while ensuring access to first-rate necessities like infrastructure for education and healthcare.<\/span><\/li>\r\n<li style=\"font-weight: 400; text-align: justify;\" aria-level=\"1\"><span style=\"font-weight: 400;\">Enhancing infrastructure with smart solutions, including energy-efficient solar-powered streetlights, Wi-Fi hotspots, public kiosks, smart traffic signal control, and smart metres for water and electricity.<\/span><\/li>\r\n<\/ul>\r\n\r\n\r\n\r\n<h2 class=\"wp-block-heading\" id=\"h-kochi-smart-city-portal-projects\">Kochi Smart City Portal Projects<\/h2>\r\n\r\n\r\n\r\n<p class=\"has-text-align-justify\"><span style=\"font-weight: 400;\">Here are the mentioned Smart City Kochi projects that are planned effectively to fulfill all the key focuses flawlessly and safeguards the future with flourished productivity and livable space for the citizens.\u00a0<\/span><\/p>\r\n\r\n\r\n\r\n<h3 class=\"wp-block-heading\" id=\"h-completed-project\">Completed Project<\/h3>\r\n\r\n\r\n\r\n<p class=\"has-text-align-justify\"><span style=\"font-weight: 400;\">Here is the table shown for those Smart City Kochi project which has been completed by the authorities successfully with additional details:<\/span><\/p>\r\n\r\n\r\n\r\n<figure class=\"wp-block-table\">\r\n<table>\r\n<tbody>\r\n<tr>\r\n<td><b>State<\/b><\/td>\r\n<td><b>City<\/b><\/td>\r\n<td><b>Project Name<\/b><\/td>\r\n<td><b>Sector<\/b><\/td>\r\n<td><b>Impact<\/b><\/td>\r\n<td><b>Implementing Agency<\/b><\/td>\r\n<td><b>Project Being Taken Up By<\/b><\/td>\r\n<td><b>Mention The Project Milestones<\/b><\/td>\r\n<td><b>Dpr Cost Estimated Project Cost<\/b><\/td>\r\n<\/tr>\r\n<tr>\r\n<td><span style=\"font-weight: 400;\">Kerala<\/span><\/td>\r\n<td><span style=\"font-weight: 400;\">Kochi<\/span><\/td>\r\n<td><span style=\"font-weight: 400;\">Construction of Modern at Grade Walkways in Hospital Road<\/span><\/td>\r\n<td><span style=\"font-weight: 400;\">Non Motorised Transport and Walkability<\/span><\/td>\r\n<td><span style=\"font-weight: 400;\">Improved walkability<\/span><\/td>\r\n<td><span style=\"font-weight: 400;\">C A George (PWD Contractor)<\/span><\/td>\r\n<td><span style=\"font-weight: 400;\">SPV<\/span><\/td>\r\n<td><span style=\"font-weight: 400;\">Clearing of Site 2. Barricading 3. Detailed Design Drawings<\/span><\/td>\r\n<td><span style=\"font-weight: 400;\">9 Rs. Cr.<\/span><\/td>\r\n<\/tr>\r\n<tr>\r\n<td><span style=\"font-weight: 400;\">Kerala<\/span><\/td>\r\n<td><span style=\"font-weight: 400;\">Kochi<\/span><\/td>\r\n<td><span style=\"font-weight: 400;\">Houeshold segregated bins for Organic and inorganic wastes<\/span><\/td>\r\n<td><span style=\"font-weight: 400;\">Solid Waste Management<\/span><\/td>\r\n<td><span style=\"font-weight: 400;\">Improved sanitation condition<\/span><\/td>\r\n<td><span style=\"font-weight: 400;\">M\/s NilKamal Limited<\/span><\/td>\r\n<td><span style=\"font-weight: 400;\">SPV<\/span><\/td>\r\n<td><span style=\"font-weight: 400;\">20,000 House Holds have been supplied. Distribution of House holds bins at ward 2 in 1700 houses has been completed.<\/span><\/td>\r\n<td><span style=\"font-weight: 400;\">0.9 Rs. Cr.<\/span><\/td>\r\n<\/tr>\r\n<tr>\r\n<td><span style=\"font-weight: 400;\">Kerala<\/span><\/td>\r\n<td><span style=\"font-weight: 400;\">Kochi<\/span><\/td>\r\n<td><span style=\"font-weight: 400;\">Improving mobility for Kochi, Kochi Metro<\/span><\/td>\r\n<td><span style=\"font-weight: 400;\">Urban Transport<\/span><\/td>\r\n<td><span style=\"font-weight: 400;\">Transportation and mobility<\/span><\/td>\r\n<td><span style=\"font-weight: 400;\">KMRL through DMRC execution by Soma constructions<\/span><\/td>\r\n<td><span style=\"font-weight: 400;\">Others<\/span><\/td>\r\n<td><span style=\"font-weight: 400;\">Project completed and metro is inaugurated.<\/span><\/td>\r\n<td><span style=\"font-weight: 400;\">400 Rs. Cr.<\/span><\/td>\r\n<\/tr>\r\n<tr>\r\n<td><span style=\"font-weight: 400;\">Kerala<\/span><\/td>\r\n<td><span style=\"font-weight: 400;\">Kochi<\/span><\/td>\r\n<td><span style=\"font-weight: 400;\">Integrated Command, Control and Communication Centre IC4 in Kochi<\/span><\/td>\r\n<td><span style=\"font-weight: 400;\">IT Connectivity and Digitalization<\/span><\/td>\r\n<td><span style=\"font-weight: 400;\">Citizen friendly and cost-effective governance and public services<\/span><\/td>\r\n<td><span style=\"font-weight: 400;\">Fluentgrid Limited in Consortium with Bharat Electronics Limited<\/span><\/td>\r\n<td><span style=\"font-weight: 400;\">SPV<\/span><\/td>\r\n<td><span style=\"font-weight: 400;\">Revised project name: Integrated Command, Control and Communication Centre (IC4). Project under Implementation. Integration with 8 services under progress. Development of Mobile App and Citizen Portal ha been completed and ready for launch. Command and Control room has been setup at JLN Stadium Metro Station building. Launched on 8 June 2020. O&amp;M shall continue for 5 years after Go live<\/span><\/td>\r\n<td><span style=\"font-weight: 400;\">85.6 Rs. Cr.<\/span><\/td>\r\n<\/tr>\r\n<tr>\r\n<td><span style=\"font-weight: 400;\">Kerala<\/span><\/td>\r\n<td><span style=\"font-weight: 400;\">Kochi<\/span><\/td>\r\n<td><span style=\"font-weight: 400;\">Construction of walkway from High court to Goshree junction, Was proposed under 18 and 23 under sub heads under NMT and pedestrianozed areas and Main Roads<\/span><\/td>\r\n<td><span style=\"font-weight: 400;\">Non Motorised Transport and Walkability<\/span><\/td>\r\n<td><span style=\"font-weight: 400;\">Improved walkability<\/span><\/td>\r\n<td><span style=\"font-weight: 400;\">M\/s Deens Group<\/span><\/td>\r\n<td><span style=\"font-weight: 400;\">SPV<\/span><\/td>\r\n<td><span style=\"font-weight: 400;\">Part of Road tender. Cost has been provided in Ernakulam, Smart Road tender. Work has been awarded.with Ernakulam Smart Road (KER-KOC-25)<\/span><\/td>\r\n<td><span style=\"font-weight: 400;\">0 Rs. Cr.<\/span><\/td>\r\n<\/tr>\r\n<tr>\r\n<td><span style=\"font-weight: 400;\">Kerala<\/span><\/td>\r\n<td><span style=\"font-weight: 400;\">Kochi<\/span><\/td>\r\n<td><span style=\"font-weight: 400;\">1000 KWp Grid connected Roof Top Solar Photovoltaic Power plants at various sites in Kochi Municipal Corporation Area<\/span><\/td>\r\n<td><span style=\"font-weight: 400;\">Energy<\/span><\/td>\r\n<td><span style=\"font-weight: 400;\">Reduced dependence on and conservation of energy from conventional sources<\/span><\/td>\r\n<td><span style=\"font-weight: 400;\">BHEL<\/span><\/td>\r\n<td><span style=\"font-weight: 400;\">SPV<\/span><\/td>\r\n<td><span style=\"font-weight: 400;\">Installed -1000kWp Commissioned &#8211; 985kWp. 18 sites partial handover completed.10 sites handover pending due to non-compliance of punch points rectifications.<\/span><\/td>\r\n<td><span style=\"font-weight: 400;\">5.7 Rs. Cr.<\/span><\/td>\r\n<\/tr>\r\n<tr>\r\n<td><span style=\"font-weight: 400;\">Kerala<\/span><\/td>\r\n<td><span style=\"font-weight: 400;\">Kochi<\/span><\/td>\r\n<td><span style=\"font-weight: 400;\">Upgradation of Dutch Palace Entry Area<\/span><\/td>\r\n<td><span style=\"font-weight: 400;\">Area Development<\/span><\/td>\r\n<td><span style=\"font-weight: 400;\">Access to open spaces<\/span><\/td>\r\n<td><span style=\"font-weight: 400;\">Mr. Babu Joseph<\/span><\/td>\r\n<td><span style=\"font-weight: 400;\">SPV<\/span><\/td>\r\n<td><span style=\"font-weight: 400;\">Work Completed<\/span><\/td>\r\n<td><span style=\"font-weight: 400;\">1.1 Rs. Cr.<\/span><\/td>\r\n<\/tr>\r\n<tr>\r\n<td><span style=\"font-weight: 400;\">Kerala<\/span><\/td>\r\n<td><span style=\"font-weight: 400;\">Kochi<\/span><\/td>\r\n<td><span style=\"font-weight: 400;\">Pan city Smart Card and Mobile App (Project No 83 under sub heading Integrated City APP in SCP)<\/span><\/td>\r\n<td><span style=\"font-weight: 400;\">Urban Transport<\/span><\/td>\r\n<td><span style=\"font-weight: 400;\">Citizen friendly and cost-effective governance and public services<\/span><\/td>\r\n<td><span style=\"font-weight: 400;\">Axis Bank<\/span><\/td>\r\n<td><span style=\"font-weight: 400;\">Others<\/span><\/td>\r\n<td><span style=\"font-weight: 400;\">Project launched on 17th June 2017. Phase II scope being developed.<\/span><\/td>\r\n<td><span style=\"font-weight: 400;\">25 Rs. Cr.<\/span><\/td>\r\n<\/tr>\r\n<tr>\r\n<td><span style=\"font-weight: 400;\">Kerala<\/span><\/td>\r\n<td><span style=\"font-weight: 400;\">Kochi<\/span><\/td>\r\n<td><span style=\"font-weight: 400;\">Upgradation of infrastructure in Housing through Credit linked schemes<\/span><\/td>\r\n<td><span style=\"font-weight: 400;\">Housing<\/span><\/td>\r\n<td><span style=\"font-weight: 400;\">Improved living conditions for the urban poor<\/span><\/td>\r\n<td><span style=\"font-weight: 400;\">Beneficiary Led Housing under Kochi Municipal Corproation<\/span><\/td>\r\n<td><span style=\"font-weight: 400;\">Others<\/span><\/td>\r\n<td><span style=\"font-weight: 400;\">30 families have completed the housing construction and 175 families have initiated the construction<\/span><\/td>\r\n<td><span style=\"font-weight: 400;\">26 Rs. Cr.<\/span><\/td>\r\n<\/tr>\r\n<tr>\r\n<td><span style=\"font-weight: 400;\">Kerala<\/span><\/td>\r\n<td><span style=\"font-weight: 400;\">Kochi<\/span><\/td>\r\n<td><span style=\"font-weight: 400;\">Open space corridor linking DH Ground to Mangalavanam depends on ecological sensitivity<\/span><\/td>\r\n<td><span style=\"font-weight: 400;\">Area Development<\/span><\/td>\r\n<td><span style=\"font-weight: 400;\">Access to open spaces<\/span><\/td>\r\n<td><span style=\"font-weight: 400;\">M\/s P J AVARACHAN<\/span><\/td>\r\n<td><span style=\"font-weight: 400;\">SPV<\/span><\/td>\r\n<td><span style=\"font-weight: 400;\">Re-tendered second time on 22- 08-2019. LoA issued on 17th March 2020. All work at Stretch 1,2, 3,4,6,7,&amp;8 completed, except minor works like buffing of bridge handrails and SS handrail for public parking areas. Due to additional scope of work project cost increased. MMU team to update project cost.<\/span><\/td>\r\n<td><span style=\"font-weight: 400;\">7.1 Rs. Cr.<\/span><\/td>\r\n<\/tr>\r\n<tr>\r\n<td><span style=\"font-weight: 400;\">Kerala<\/span><\/td>\r\n<td><span style=\"font-weight: 400;\">Kochi<\/span><\/td>\r\n<td><span style=\"font-weight: 400;\">Implementation of eHealth solution for General Hospital, Ernakulam<\/span><\/td>\r\n<td><span style=\"font-weight: 400;\">IT Connectivity and Digitalization<\/span><\/td>\r\n<td><span style=\"font-weight: 400;\">Improved health and education services<\/span><\/td>\r\n<td><span style=\"font-weight: 400;\">Kerala State Electronics Development Corporation Limited<\/span><\/td>\r\n<td><span style=\"font-weight: 400;\">SPV<\/span><\/td>\r\n<td><span style=\"font-weight: 400;\">Computer Hardware and GPON Network Procured and Installed at General Hospital. Project completed<\/span><\/td>\r\n<td><span style=\"font-weight: 400;\">3.82 Rs. Cr.<\/span><\/td>\r\n<\/tr>\r\n<tr>\r\n<td><span style=\"font-weight: 400;\">Kerala<\/span><\/td>\r\n<td><span style=\"font-weight: 400;\">Kochi<\/span><\/td>\r\n<td><span style=\"font-weight: 400;\">Fort Kochi Beach Front Upgradation &#8211; Part 1 &#8211; Vasco Sq<\/span><\/td>\r\n<td><span style=\"font-weight: 400;\">Area Development<\/span><\/td>\r\n<td><span style=\"font-weight: 400;\">Access to open spaces<\/span><\/td>\r\n<td><span style=\"font-weight: 400;\">Mr. Saji Jacob<\/span><\/td>\r\n<td><span style=\"font-weight: 400;\">SPV<\/span><\/td>\r\n<td><span style=\"font-weight: 400;\">LOA issued on 22 January, 2020. All the works completed<\/span><\/td>\r\n<td><span style=\"font-weight: 400;\">1.58 Rs. Cr.<\/span><\/td>\r\n<\/tr>\r\n<tr>\r\n<td><span style=\"font-weight: 400;\">Kerala<\/span><\/td>\r\n<td><span style=\"font-weight: 400;\">Kochi<\/span><\/td>\r\n<td><span style=\"font-weight: 400;\">Public Bicycle Sharing System in Kochi<\/span><\/td>\r\n<td><span style=\"font-weight: 400;\">Non Motorised Transport and Walkability<\/span><\/td>\r\n<td><span style=\"font-weight: 400;\">Transportation and mobility<\/span><\/td>\r\n<td><span style=\"font-weight: 400;\">Hero Youon Pvt. Ltd JV of Hero Cycles Limited and Youon Technology Company Pvt. Ltd. (HEXI) &amp; M\/s Greenpedia Bike Share Pvt Ltd.(MYBYK) with KMRL<\/span><\/td>\r\n<td><span style=\"font-weight: 400;\">SPV<\/span><\/td>\r\n<td><span style=\"font-weight: 400;\">PBS phase I has been launched on 29\/09\/2019. Phase II M\/s Greenpedia Bike Share Pvt Ltd.- MYBYK The citizens can now access 400 cycles from 46 docking stations including 21 metro stations around the city.<\/span><\/td>\r\n<td><span style=\"font-weight: 400;\">10 Rs. Cr.<\/span><\/td>\r\n<\/tr>\r\n<tr>\r\n<td><span style=\"font-weight: 400;\">Kerala<\/span><\/td>\r\n<td><span style=\"font-weight: 400;\">Kochi<\/span><\/td>\r\n<td><span style=\"font-weight: 400;\">Dedicated pumping main<\/span><\/td>\r\n<td><span style=\"font-weight: 400;\">Water Supply<\/span><\/td>\r\n<td><span style=\"font-weight: 400;\">Assured water supply<\/span><\/td>\r\n<td><span style=\"font-weight: 400;\">KWA<\/span><\/td>\r\n<td><span style=\"font-weight: 400;\">Others<\/span><\/td>\r\n<td><span style=\"font-weight: 400;\">Taken up under state plan and the works are completed<\/span><\/td>\r\n<td><span style=\"font-weight: 400;\">3.5 Rs. Cr.<\/span><\/td>\r\n<\/tr>\r\n<tr>\r\n<td><span style=\"font-weight: 400;\">Kerala<\/span><\/td>\r\n<td><span style=\"font-weight: 400;\">Kochi<\/span><\/td>\r\n<td><span style=\"font-weight: 400;\">Rider line for increased water supply<\/span><\/td>\r\n<td><span style=\"font-weight: 400;\">Water Supply<\/span><\/td>\r\n<td><span style=\"font-weight: 400;\">Assured water supply<\/span><\/td>\r\n<td><span style=\"font-weight: 400;\">Kerala Water Authority<\/span><\/td>\r\n<td><span style=\"font-weight: 400;\">Others<\/span><\/td>\r\n<td><span style=\"font-weight: 400;\">Work completed<\/span><\/td>\r\n<td><span style=\"font-weight: 400;\">10 Rs. Cr.<\/span><\/td>\r\n<\/tr>\r\n<tr>\r\n<td><span style=\"font-weight: 400;\">Kerala<\/span><\/td>\r\n<td><span style=\"font-weight: 400;\">Kochi<\/span><\/td>\r\n<td><span style=\"font-weight: 400;\">Upgradation of Nehru Park<\/span><\/td>\r\n<td><span style=\"font-weight: 400;\">Area Development<\/span><\/td>\r\n<td><span style=\"font-weight: 400;\">Access to open spaces<\/span><\/td>\r\n<td><span style=\"font-weight: 400;\">Forest Industies (Travancore) Ltd,<\/span><\/td>\r\n<td><span style=\"font-weight: 400;\">Others<\/span><\/td>\r\n<td><span style=\"font-weight: 400;\">Work completed<\/span><\/td>\r\n<td><span style=\"font-weight: 400;\">2 Rs. Cr.<\/span><\/td>\r\n<\/tr>\r\n<tr>\r\n<td><span style=\"font-weight: 400;\">Kerala<\/span><\/td>\r\n<td><span style=\"font-weight: 400;\">Kochi<\/span><\/td>\r\n<td><span style=\"font-weight: 400;\">Storage capacity augmentation in Karuvelipady sump by 5 million litres<\/span><\/td>\r\n<td><span style=\"font-weight: 400;\">Water Supply<\/span><\/td>\r\n<td><span style=\"font-weight: 400;\">Assured water supply<\/span><\/td>\r\n<td><span style=\"font-weight: 400;\">KWA<\/span><\/td>\r\n<td><span style=\"font-weight: 400;\">Others<\/span><\/td>\r\n<td><span style=\"font-weight: 400;\">Taken up under State Plan. Work completed<\/span><\/td>\r\n<td><span style=\"font-weight: 400;\">3.2 Rs. Cr.<\/span><\/td>\r\n<\/tr>\r\n<tr>\r\n<td><span style=\"font-weight: 400;\">Kerala<\/span><\/td>\r\n<td><span style=\"font-weight: 400;\">Kochi<\/span><\/td>\r\n<td><span style=\"font-weight: 400;\">Extension of pipelines from Maradu to Island to be extended to West Kochi to supply 12 MLD<\/span><\/td>\r\n<td><span style=\"font-weight: 400;\">Water Supply<\/span><\/td>\r\n<td><span style=\"font-weight: 400;\">Assured water supply<\/span><\/td>\r\n<td><span style=\"font-weight: 400;\">Kerala Water Authority (KWA)<\/span><\/td>\r\n<td><span style=\"font-weight: 400;\">Others<\/span><\/td>\r\n<td><span style=\"font-weight: 400;\">The Project was taken up under State Plan and the Works are Completed<\/span><\/td>\r\n<td><span style=\"font-weight: 400;\">0.3 Rs. Cr.<\/span><\/td>\r\n<\/tr>\r\n<tr>\r\n<td><span style=\"font-weight: 400;\">Kerala<\/span><\/td>\r\n<td><span style=\"font-weight: 400;\">Kochi<\/span><\/td>\r\n<td><span style=\"font-weight: 400;\">Replacement of pipe lines from Perumanoor to Thevara and Thoppumpady bridge to Karuvelipady<\/span><\/td>\r\n<td><span style=\"font-weight: 400;\">Water Supply<\/span><\/td>\r\n<td><span style=\"font-weight: 400;\">Assured water supply<\/span><\/td>\r\n<td><span style=\"font-weight: 400;\">.<\/span><\/td>\r\n<td><span style=\"font-weight: 400;\">Others<\/span><\/td>\r\n<td><span style=\"font-weight: 400;\">The reach from Thoppumpady bridge to karuvekipady is taken up under state plan and works are completed. Due to road cutting issues, the reach from Perumanoor to Thevara has not been taken up by KWA<\/span><\/td>\r\n<td><span style=\"font-weight: 400;\">3.12 Rs. Cr.<\/span><\/td>\r\n<\/tr>\r\n<tr>\r\n<td><span style=\"font-weight: 400;\">Kerala<\/span><\/td>\r\n<td><span style=\"font-weight: 400;\">Kochi<\/span><\/td>\r\n<td><span style=\"font-weight: 400;\">Implementation of Integrated Traffic Management System, ITMS in Kochi<\/span><\/td>\r\n<td><span style=\"font-weight: 400;\">Area Development<\/span><\/td>\r\n<td><span style=\"font-weight: 400;\">Transportation and mobility<\/span><\/td>\r\n<td><span style=\"font-weight: 400;\">Kerala State Electronics Development Corporation Limited (KELTRON)<\/span><\/td>\r\n<td><span style=\"font-weight: 400;\">SPV<\/span><\/td>\r\n<td><span style=\"font-weight: 400;\">The project name has been revised to &#8220;Integrated Traffic Management Systems (ITMS) &#8220;. 4 Arm Junction Signal- 9 out 11 location completed. 3 Arm Junction Signal- 9 out 10 location completed. Camera (PTZ+ Violation )- 32 out of 35 locations completed. Pelican Signal- 2 out of 4 completed. RLVD- All 4 locations completed. VMS- 5 out of 10 locations completed.<\/span><\/td>\r\n<td><span style=\"font-weight: 400;\">30 Rs. Cr.<\/span><\/td>\r\n<\/tr>\r\n<tr>\r\n<td><span style=\"font-weight: 400;\">Kerala<\/span><\/td>\r\n<td><span style=\"font-weight: 400;\">Kochi<\/span><\/td>\r\n<td><span style=\"font-weight: 400;\">Electric Feeders, Bicycle Sharing, Elevated Walkways and Travelators<\/span><\/td>\r\n<td><span style=\"font-weight: 400;\">Non Motorised Transport and Walkability<\/span><\/td>\r\n<td><span style=\"font-weight: 400;\">Transportation and mobility<\/span><\/td>\r\n<td><span style=\"font-weight: 400;\">Kinetic Green Energy and Power Solution Limited<\/span><\/td>\r\n<td><span style=\"font-weight: 400;\">Others<\/span><\/td>\r\n<td><span style=\"font-weight: 400;\">Reclassified as three separate projects that is 1. Electric Feeders 2. Bicycle Sharing 16 E-Autos (swappable battery type) under a contract with Kinetic Green (Aluva-Maharajas) is available. At vyttila &amp; EKM-South, EV charging facilities for E-Autos (on-board battery type) have been provided. Inauguration of E-Autos induction to the Metro feeder services in Kochi was on Wednesday 6th February 2019. 20 e-autos were launched.<\/span><\/td>\r\n<td><span style=\"font-weight: 400;\">11.4 Rs. Cr.<\/span><\/td>\r\n<\/tr>\r\n<tr>\r\n<td><span style=\"font-weight: 400;\">Kerala<\/span><\/td>\r\n<td><span style=\"font-weight: 400;\">Kochi<\/span><\/td>\r\n<td><span style=\"font-weight: 400;\">Health ATM in General Hospital<\/span><\/td>\r\n<td><span style=\"font-weight: 400;\">IT Connectivity and Digitalization<\/span><\/td>\r\n<td><span style=\"font-weight: 400;\">Improved health and education services<\/span><\/td>\r\n<td><span style=\"font-weight: 400;\">Yolo Health<\/span><\/td>\r\n<td><span style=\"font-weight: 400;\">SPV<\/span><\/td>\r\n<td><span style=\"font-weight: 400;\">Health ATM has been installed in GH<\/span><\/td>\r\n<td><span style=\"font-weight: 400;\">0.1 Rs. Cr.<\/span><\/td>\r\n<\/tr>\r\n<\/tbody>\r\n<\/table>\r\n<\/figure>\r\n\r\n\r\n\r\n<p class=\"has-text-align-center\"><em>source: smartcities[dot]gov[dot]in<\/em><\/p>\r\n\r\n\r\n\r\n<p><strong>Don&#8217;t miss It!<\/strong><\/p>\r\n\r\n\r\n\r\n<figure class=\"wp-block-table\">\r\n<table width=\"485\">\r\n<tbody>\r\n<tr>\r\n<td>Smart City Chennai<\/td>\r\n<td><a href=\"https:\/\/www.squareyards.com\/blog\/chennai-smart-city-smcart\" target=\"_blank\" rel=\"noopener\">Chennai Smart Cities Projects &amp; Mission<\/a><\/td>\r\n<\/tr>\r\n<tr>\r\n<td>Smart City Delhi<\/td>\r\n<td><a href=\"https:\/\/www.squareyards.com\/blog\/delhi-smart-city-smcart\" target=\"_blank\" rel=\"noopener follow\" data-wpel-link=\"internal\">Delhi Smart Cities Projects &amp; Mission<\/a><\/td>\r\n<\/tr>\r\n<tr>\r\n<td>Smart City Bhopal<\/td>\r\n<td><a href=\"https:\/\/www.squareyards.com\/blog\/bhopal-smart-city-smcart\" target=\"_blank\" rel=\"noopener follow\" data-wpel-link=\"internal\">Bhopal Smart Cities Projects &amp; Mission<\/a><\/td>\r\n<\/tr>\r\n<tr>\r\n<td>Smart City Ranchi<\/td>\r\n<td><a href=\"https:\/\/www.squareyards.com\/blog\/ranchi-smart-city-smcart\" target=\"_blank\" rel=\"noopener follow\" data-wpel-link=\"internal\">Ranchi Smart Cities Projects &amp; Mission<\/a><\/td>\r\n<\/tr>\r\n<tr>\r\n<td>Smart City Dholera<\/td>\r\n<td><a href=\"https:\/\/www.squareyards.com\/blog\/dholera-smart-city-smcart\" target=\"_blank\" rel=\"noopener follow\" data-wpel-link=\"internal\">Dholera Smart Cities Projects &amp; Mission<\/a><\/td>\r\n<\/tr>\r\n<tr>\r\n<td>Smart City Dehradun<\/td>\r\n<td><a href=\"https:\/\/www.squareyards.com\/blog\/dehradun-smart-city-smcart\" target=\"_blank\" rel=\"noopener follow\" data-wpel-link=\"internal\">Dehradun Smart Cities Projects &amp; Mission<\/a><\/td>\r\n<\/tr>\r\n<tr>\r\n<td>Smart City Bangalore<\/td>\r\n<td><a href=\"https:\/\/www.squareyards.com\/blog\/bangalore-smart-city-smcart\" target=\"_blank\" rel=\"noopener follow\" data-wpel-link=\"internal\">Bangalore Smart Cities Projects &amp; Mission<\/a><\/td>\r\n<\/tr>\r\n<tr>\r\n<td>Smart City Karnataka<\/td>\r\n<td><a href=\"https:\/\/www.squareyards.com\/blog\/karnataka-smart-city-smcart\" target=\"_blank\" rel=\"noopener follow\" data-wpel-link=\"internal\">Karnataka Smart Cities Projects &amp; Mission<\/a><\/td>\r\n<\/tr>\r\n<tr>\r\n<td>Smart City Thane<\/td>\r\n<td><a href=\"https:\/\/www.squareyards.com\/blog\/thane-smart-city-smcart\" target=\"_blank\" rel=\"noopener follow\" data-wpel-link=\"internal\">Thane Smart Cities Projects &amp; Mission<\/a><\/td>\r\n<\/tr>\r\n<\/tbody>\r\n<\/table>\r\n<\/figure>\r\n\r\n\r\n\r\n<h3 class=\"wp-block-heading\" id=\"h-in-progress-projects-status\">In-Progress Projects Status<\/h3>\r\n\r\n\r\n\r\n<p><span style=\"font-weight: 400;\">Here is the table showing the work order stage with complete informations that may be important for our readers:\u00a0<\/span><\/p>\r\n\r\n\r\n\r\n<figure class=\"wp-block-table\">\r\n<table>\r\n<tbody>\r\n<tr>\r\n<td><b>State<\/b><\/td>\r\n<td><b>City<\/b><\/td>\r\n<td><b>Project Name<\/b><\/td>\r\n<td><b>Sector<\/b><\/td>\r\n<td><b>Impact<\/b><\/td>\r\n<td><b>Implementing Agency<\/b><\/td>\r\n<td><b>Project Being Taken Up By<\/b><\/td>\r\n<td><b>Mention The Project Milestones<\/b><\/td>\r\n<td><b>Dpr Cost Estimated Project Cost<\/b><\/td>\r\n<\/tr>\r\n<tr>\r\n<td><span style=\"font-weight: 400;\">Kerala<\/span><\/td>\r\n<td><span style=\"font-weight: 400;\">Kochi<\/span><\/td>\r\n<td><span style=\"font-weight: 400;\">Property development along jetties<\/span><\/td>\r\n<td><span style=\"font-weight: 400;\">Area Development<\/span><\/td>\r\n<td><span style=\"font-weight: 400;\">Transportation and mobility<\/span><\/td>\r\n<td><span style=\"font-weight: 400;\">KMRL &#8211; Water Metro<\/span><\/td>\r\n<td><span style=\"font-weight: 400;\">Others<\/span><\/td>\r\n<td><span style=\"font-weight: 400;\">Project taken up by KMRL &#8211; Water Metro funding through external loan.Cost of jetties in ABD area Fort Kochi, Mattancherry, High Court. Project no 66, 67 &amp; 68 are combined.. Project awarded<\/span><\/td>\r\n<td><span style=\"font-weight: 400;\">40 Rs. Cr.<\/span><\/td>\r\n<\/tr>\r\n<tr>\r\n<td><span style=\"font-weight: 400;\">Kerala<\/span><\/td>\r\n<td><span style=\"font-weight: 400;\">Kochi<\/span><\/td>\r\n<td><span style=\"font-weight: 400;\">Intelligent City Surveillance System in Kochi<\/span><\/td>\r\n<td><span style=\"font-weight: 400;\">Safety and Security<\/span><\/td>\r\n<td><span style=\"font-weight: 400;\">Improved safety and security of citizens, particularly vulnerable groups (women, children and elders)<\/span><\/td>\r\n<td><span style=\"font-weight: 400;\">M\/s Bharat Electronics Limited<\/span><\/td>\r\n<td><span style=\"font-weight: 400;\">SPV<\/span><\/td>\r\n<td><span style=\"font-weight: 400;\">Implementation of Intelligent Street Poles in Kochi was canceled after the decision of the State. The project scope was revised and project renamed as Intelligent City Surveillance System. This project was tendered in January 2020. LoA was issued on 3rd September 2020. Project Inception report submitted. pole Foundation and Laying of data and power cable started. Installation of Poles and Junctions box on going<\/span><\/td>\r\n<td><span style=\"font-weight: 400;\">39.14 Rs. Cr.<\/span><\/td>\r\n<\/tr>\r\n<tr>\r\n<td><span style=\"font-weight: 400;\">Kerala<\/span><\/td>\r\n<td><span style=\"font-weight: 400;\">Kochi<\/span><\/td>\r\n<td><span style=\"font-weight: 400;\">Signages<\/span><\/td>\r\n<td><span style=\"font-weight: 400;\">Non Motorised Transport and Walkability<\/span><\/td>\r\n<td><span style=\"font-weight: 400;\">Transportation and mobility<\/span><\/td>\r\n<td><span style=\"font-weight: 400;\">M\/s EKK Infrastructure Limited<\/span><\/td>\r\n<td><span style=\"font-weight: 400;\">SPV<\/span><\/td>\r\n<td><span style=\"font-weight: 400;\">Work order issued for Procurement and installation of Road Signages under Smart City Mission has been issued on 21st October. 188 nos of Signage boards, 40m2 of street boards installed in Ernakulam ABD area<\/span><\/td>\r\n<td><span style=\"font-weight: 400;\">2.56 Rs. Cr.<\/span><\/td>\r\n<\/tr>\r\n<tr>\r\n<td><span style=\"font-weight: 400;\">Kerala<\/span><\/td>\r\n<td><span style=\"font-weight: 400;\">Kochi<\/span><\/td>\r\n<td><span style=\"font-weight: 400;\">RMU with Remote terminal units<\/span><\/td>\r\n<td><span style=\"font-weight: 400;\">Energy<\/span><\/td>\r\n<td><span style=\"font-weight: 400;\">Reliability of power supply<\/span><\/td>\r\n<td><span style=\"font-weight: 400;\">M\/s Polycab India Pvt Ltd<\/span><\/td>\r\n<td><span style=\"font-weight: 400;\">SPV<\/span><\/td>\r\n<td><span style=\"font-weight: 400;\">Electrical Projects grouped together, as they are proposed be tendered together for same stretch of road. Electrical work project clubbed with KER-KOC-49. Revised Project name &#8220;Development of Smart Road Electrical work in Ernakulam and West Kochi&amp;q*<\/span><\/td>\r\n<td><span style=\"font-weight: 400;\">0.01 Rs. Cr.<\/span><\/td>\r\n<\/tr>\r\n<tr>\r\n<td><span style=\"font-weight: 400;\">Kerala<\/span><\/td>\r\n<td><span style=\"font-weight: 400;\">Kochi<\/span><\/td>\r\n<td><span style=\"font-weight: 400;\">Installation of Transformers (Compact Sub-stations)<\/span><\/td>\r\n<td><span style=\"font-weight: 400;\">Energy<\/span><\/td>\r\n<td><span style=\"font-weight: 400;\">Reliability of power supply<\/span><\/td>\r\n<td><span style=\"font-weight: 400;\">M\/s Polycab India Pvt Ltd<\/span><\/td>\r\n<td><span style=\"font-weight: 400;\">SPV<\/span><\/td>\r\n<td><span style=\"font-weight: 400;\">Electrical projects grouped together, as they are proposed be tendered together for same stretch of road. Electrical work project clubbed with KER-KOC-49. Revised Project Name &#8221; Development of Smart Road Electrical Work in Ernakulam and West Kochi&amp;*<\/span><\/td>\r\n<td><span style=\"font-weight: 400;\">0.01 Rs. Cr.<\/span><\/td>\r\n<\/tr>\r\n<tr>\r\n<td><span style=\"font-weight: 400;\">Kerala<\/span><\/td>\r\n<td><span style=\"font-weight: 400;\">Kochi<\/span><\/td>\r\n<td><span style=\"font-weight: 400;\">Dredging cost<\/span><\/td>\r\n<td><span style=\"font-weight: 400;\">Urban Transport<\/span><\/td>\r\n<td><span style=\"font-weight: 400;\">Transportation and mobility<\/span><\/td>\r\n<td><span style=\"font-weight: 400;\">KMRL &#8211; Water Metro<\/span><\/td>\r\n<td><span style=\"font-weight: 400;\">Others<\/span><\/td>\r\n<td><span style=\"font-weight: 400;\">Being undertaken by Water metro. LOA issued. Work under progress<\/span><\/td>\r\n<td><span style=\"font-weight: 400;\">10 Rs. Cr.<\/span><\/td>\r\n<\/tr>\r\n<tr>\r\n<td><span style=\"font-weight: 400;\">Kerala<\/span><\/td>\r\n<td><span style=\"font-weight: 400;\">Kochi<\/span><\/td>\r\n<td><span style=\"font-weight: 400;\">Decentralized Treatment and collection system for West Kochi under ADB (Mundamveli)<\/span><\/td>\r\n<td><span style=\"font-weight: 400;\">Sewerage and Septage<\/span><\/td>\r\n<td><span style=\"font-weight: 400;\">Improved sanitation condition<\/span><\/td>\r\n<td><span style=\"font-weight: 400;\">M\/s LC Infra QUAVAC and ENVIRO CONSORTIUM<\/span><\/td>\r\n<td><span style=\"font-weight: 400;\">SPV<\/span><\/td>\r\n<td><span style=\"font-weight: 400;\">Project Clubbed with KER-KOC-023. Renamed as &#8220;Construction of Vacuum Sewer Network with House connection and Sewer Treatment Plant under Cochin Smart City Mission&#8221;. Work has been awarded<\/span><\/td>\r\n<td><span style=\"font-weight: 400;\">0.1 Rs. Cr.<\/span><\/td>\r\n<\/tr>\r\n<tr>\r\n<td><span style=\"font-weight: 400;\">Kerala<\/span><\/td>\r\n<td><span style=\"font-weight: 400;\">Kochi<\/span><\/td>\r\n<td><span style=\"font-weight: 400;\">Open Air Theatre at Fort Kochi<\/span><\/td>\r\n<td><span style=\"font-weight: 400;\">Area Development<\/span><\/td>\r\n<td><span style=\"font-weight: 400;\">Boost to local identity and economy<\/span><\/td>\r\n<td><span style=\"font-weight: 400;\">Mr. K.A Yesudas<\/span><\/td>\r\n<td><span style=\"font-weight: 400;\">SPV<\/span><\/td>\r\n<td><span style=\"font-weight: 400;\">Not one but multiple projects under this project. Total 10 tourism projects were identified. This is first Open Air Theatre at Fort Kochi. LOA was issued on 22nd January, 2020. Civil work for toilet block and stage completed. Landscaping is pending due to non-availability of good quality red earth<\/span><\/td>\r\n<td><span style=\"font-weight: 400;\">1.1 Rs. Cr.<\/span><\/td>\r\n<\/tr>\r\n<tr>\r\n<td><span style=\"font-weight: 400;\">Kerala<\/span><\/td>\r\n<td><span style=\"font-weight: 400;\">Kochi<\/span><\/td>\r\n<td><span style=\"font-weight: 400;\">Small bore sewer Vacuum system for onsite sanitation &#8211; Includes storage facility for treated water use for landscaping<\/span><\/td>\r\n<td><span style=\"font-weight: 400;\">Sewerage and Septage<\/span><\/td>\r\n<td><span style=\"font-weight: 400;\">Improved sanitation condition<\/span><\/td>\r\n<td><span style=\"font-weight: 400;\">M\/s LC Infra QUAVAC and ENVIRO CONSORTIUM<\/span><\/td>\r\n<td><span style=\"font-weight: 400;\">SPV<\/span><\/td>\r\n<td><span style=\"font-weight: 400;\">Revised name of project: Construction of Vacuum Sewer Network with House connections and sewage treatment plant. Combined with KER-KOC-022. LoI issued. Topographical survey completed.<\/span><\/td>\r\n<td><span style=\"font-weight: 400;\">144 Rs. Cr.<\/span><\/td>\r\n<\/tr>\r\n<tr>\r\n<td><span style=\"font-weight: 400;\">Kerala<\/span><\/td>\r\n<td><span style=\"font-weight: 400;\">Kochi<\/span><\/td>\r\n<td><span style=\"font-weight: 400;\">Development of Roads for Divisions 1 2 West Kochi<\/span><\/td>\r\n<td><span style=\"font-weight: 400;\">Area Development<\/span><\/td>\r\n<td><span style=\"font-weight: 400;\">Improved walkability<\/span><\/td>\r\n<td><span style=\"font-weight: 400;\">KV Jacob &amp; Sons<\/span><\/td>\r\n<td><span style=\"font-weight: 400;\">SPV<\/span><\/td>\r\n<td><span style=\"font-weight: 400;\">30 Roads work completed.3 roads DBM Completed, 20 roads parttilaly completed, roads surface works are pending.<\/span><\/td>\r\n<td><span style=\"font-weight: 400;\">27.9 Rs. Cr.<\/span><\/td>\r\n<\/tr>\r\n<tr>\r\n<td><span style=\"font-weight: 400;\">Kerala<\/span><\/td>\r\n<td><span style=\"font-weight: 400;\">Kochi<\/span><\/td>\r\n<td><span style=\"font-weight: 400;\">Development of Smart Roads in Ernakulum<\/span><\/td>\r\n<td><span style=\"font-weight: 400;\">Area Development<\/span><\/td>\r\n<td><span style=\"font-weight: 400;\">Transportation and mobility<\/span><\/td>\r\n<td><span style=\"font-weight: 400;\">M\/s Deens Group<\/span><\/td>\r\n<td><span style=\"font-weight: 400;\">SPV<\/span><\/td>\r\n<td><span style=\"font-weight: 400;\">The Revised project name is &#8220;Development of Smart Roads in Ernakulam under Smart City Mission&#8221;. Work Order has been issued to M\/s Deens Group. AM, PA, SH, DH roads DBM\/BC Completed. All major works completed for an average length of 4Km. Road Marking, painting, landscaping etc pending.<\/span><\/td>\r\n<td><span style=\"font-weight: 400;\">52.4 Rs. Cr.<\/span><\/td>\r\n<\/tr>\r\n<tr>\r\n<td><span style=\"font-weight: 400;\">Kerala<\/span><\/td>\r\n<td><span style=\"font-weight: 400;\">Kochi<\/span><\/td>\r\n<td><span style=\"font-weight: 400;\">Compact Secondary Substation (990 KVA)<\/span><\/td>\r\n<td><span style=\"font-weight: 400;\">Energy<\/span><\/td>\r\n<td><span style=\"font-weight: 400;\">Reliability of power supply<\/span><\/td>\r\n<td><span style=\"font-weight: 400;\">M\/s Polycab India Pvt Ltd<\/span><\/td>\r\n<td><span style=\"font-weight: 400;\">SPV<\/span><\/td>\r\n<td><span style=\"font-weight: 400;\">Electrical projects clubbed together as they are proposed to be tendered together for the same stretch of road (Clubbed with KER-KOC-49). The revised name of the project is &#8221; Development of Smart Road Electrical Work in Ernakulam and West Kochi&amp;q*<\/span><\/td>\r\n<td><span style=\"font-weight: 400;\">0.01 Rs. Cr.<\/span><\/td>\r\n<\/tr>\r\n<tr>\r\n<td><span style=\"font-weight: 400;\">Kerala<\/span><\/td>\r\n<td><span style=\"font-weight: 400;\">Kochi<\/span><\/td>\r\n<td><span style=\"font-weight: 400;\">Underground Cabling &#8211; 11 KV<\/span><\/td>\r\n<td><span style=\"font-weight: 400;\">Energy<\/span><\/td>\r\n<td><span style=\"font-weight: 400;\">Reliability of power supply<\/span><\/td>\r\n<td><span style=\"font-weight: 400;\">M\/s Polycab India Pvt Ltd<\/span><\/td>\r\n<td><span style=\"font-weight: 400;\">SPV<\/span><\/td>\r\n<td><span style=\"font-weight: 400;\">Electrical projects grouped together, as they are proposed be tendered together for same stretch of road. Electrical work project clubbed with KER-KOC-49. Revised project name &#8220;Development of Smart Road Electrical work in Ernakulam and West Kochi&amp;*<\/span><\/td>\r\n<td><span style=\"font-weight: 400;\">0.01 Rs. Cr.<\/span><\/td>\r\n<\/tr>\r\n<tr>\r\n<td><span style=\"font-weight: 400;\">Kerala<\/span><\/td>\r\n<td><span style=\"font-weight: 400;\">Kochi<\/span><\/td>\r\n<td><span style=\"font-weight: 400;\">LT UG Cabling<\/span><\/td>\r\n<td><span style=\"font-weight: 400;\">Energy<\/span><\/td>\r\n<td><span style=\"font-weight: 400;\">Reliability of power supply<\/span><\/td>\r\n<td><span style=\"font-weight: 400;\">M\/s Polycab India Pvt Ltd<\/span><\/td>\r\n<td><span style=\"font-weight: 400;\">SPV<\/span><\/td>\r\n<td><span style=\"font-weight: 400;\">Electrical projects grouped together, as they are proposed be tendered together for same stretch of road. Electrical work project clubbed with KER-KOC-49<\/span><\/td>\r\n<td><span style=\"font-weight: 400;\">0.01 Rs. Cr.<\/span><\/td>\r\n<\/tr>\r\n<tr>\r\n<td><span style=\"font-weight: 400;\">Kerala<\/span><\/td>\r\n<td><span style=\"font-weight: 400;\">Kochi<\/span><\/td>\r\n<td><span style=\"font-weight: 400;\">Construction upgradation of 755 DUs in Thuruthy, Kalvathy Konchery colony of Kochi, Kerala under RAY<\/span><\/td>\r\n<td><span style=\"font-weight: 400;\">Housing<\/span><\/td>\r\n<td><span style=\"font-weight: 400;\">Improved living conditions for the urban poor<\/span><\/td>\r\n<td><span style=\"font-weight: 400;\">KMC<\/span><\/td>\r\n<td><span style=\"font-weight: 400;\">Others<\/span><\/td>\r\n<td><span style=\"font-weight: 400;\">Only part work envisaged under RAY DPR has been awarded. Remaining DU construction will be taken up by Corporation and the remaining projects identified in the approved slum redevelopment DPR will be taken up under SCM. They are Bridges, roads improvement. The current awarded project is for construction of 205 DUs. Of which 6 Dwelling units out of 205 DUs awarded completed. work on 199 Dus under progress.<\/span><\/td>\r\n<td><span style=\"font-weight: 400;\">74.2 Rs. Cr.<\/span><\/td>\r\n<\/tr>\r\n<tr>\r\n<td><span style=\"font-weight: 400;\">Kerala<\/span><\/td>\r\n<td><span style=\"font-weight: 400;\">Kochi<\/span><\/td>\r\n<td><span style=\"font-weight: 400;\">Scale up of GH into a Super-speciality care centres<\/span><\/td>\r\n<td><span style=\"font-weight: 400;\">Social Sectors Health and Education<\/span><\/td>\r\n<td><span style=\"font-weight: 400;\">Improved health and education services<\/span><\/td>\r\n<td><span style=\"font-weight: 400;\">INKEL<\/span><\/td>\r\n<td><span style=\"font-weight: 400;\">SPV<\/span><\/td>\r\n<td><span style=\"font-weight: 400;\">Pile works completed. Foundation work completed. 2nd Floor Concreting under progress<\/span><\/td>\r\n<td><span style=\"font-weight: 400;\">17 Rs. Cr.<\/span><\/td>\r\n<\/tr>\r\n<tr>\r\n<td><span style=\"font-weight: 400;\">Kerala<\/span><\/td>\r\n<td><span style=\"font-weight: 400;\">Kochi<\/span><\/td>\r\n<td><span style=\"font-weight: 400;\">Rainwater structures in households ~5000 households<\/span><\/td>\r\n<td><span style=\"font-weight: 400;\">Water Supply<\/span><\/td>\r\n<td><span style=\"font-weight: 400;\">Assured water supply<\/span><\/td>\r\n<td><span style=\"font-weight: 400;\">Kochi Municipal Corporation<\/span><\/td>\r\n<td><span style=\"font-weight: 400;\">Others<\/span><\/td>\r\n<td><span style=\"font-weight: 400;\">Project to be taken by KMC under AMRUT. Project awarded in 2016 however work has not yet started as on 29 Nov 19<\/span><\/td>\r\n<td><span style=\"font-weight: 400;\">0.75 Rs. Cr.<\/span><\/td>\r\n<\/tr>\r\n<tr>\r\n<td><span style=\"font-weight: 400;\">Kerala<\/span><\/td>\r\n<td><span style=\"font-weight: 400;\">Kochi<\/span><\/td>\r\n<td><span style=\"font-weight: 400;\">Utility ducting for SWD, Water supply, Sewerage, OFC etc<\/span><\/td>\r\n<td><span style=\"font-weight: 400;\">Area Development<\/span><\/td>\r\n<td><span style=\"font-weight: 400;\">Assured water supply<\/span><\/td>\r\n<td><span style=\"font-weight: 400;\">M\/s ABC Builders<\/span><\/td>\r\n<td><span style=\"font-weight: 400;\">SPV<\/span><\/td>\r\n<td><span style=\"font-weight: 400;\">Clubbed with Road Project. The revised project name is &#8221; Integrated Development of Smart Roads and Access Roads in ABD area of Kochi Corporation.&#8221;<\/span><\/td>\r\n<td><span style=\"font-weight: 400;\">0.01 Rs. Cr.<\/span><\/td>\r\n<\/tr>\r\n<tr>\r\n<td><span style=\"font-weight: 400;\">Kerala<\/span><\/td>\r\n<td><span style=\"font-weight: 400;\">Kochi<\/span><\/td>\r\n<td><span style=\"font-weight: 400;\">Distribution panel board<\/span><\/td>\r\n<td><span style=\"font-weight: 400;\">Energy<\/span><\/td>\r\n<td><span style=\"font-weight: 400;\">Reliability of power supply<\/span><\/td>\r\n<td><span style=\"font-weight: 400;\">M\/s Polycab India Pvt Ltd<\/span><\/td>\r\n<td><span style=\"font-weight: 400;\">SPV<\/span><\/td>\r\n<td><span style=\"font-weight: 400;\">Electrical projects grouped together, as they are proposed be tendered together for same stretch of road. Electrical work project clubbed with KER-KOC-49. Revised project name &#8220;Development of Smart Road Electrical Work in Ernakulam and West Kochi&amp;q*<\/span><\/td>\r\n<td><span style=\"font-weight: 400;\">0.01 Rs. Cr.<\/span><\/td>\r\n<\/tr>\r\n<tr>\r\n<td><span style=\"font-weight: 400;\">Kerala<\/span><\/td>\r\n<td><span style=\"font-weight: 400;\">Kochi<\/span><\/td>\r\n<td><span style=\"font-weight: 400;\">Installation of feeder pillars<\/span><\/td>\r\n<td><span style=\"font-weight: 400;\">Energy<\/span><\/td>\r\n<td><span style=\"font-weight: 400;\">Reliability of power supply<\/span><\/td>\r\n<td><span style=\"font-weight: 400;\">M\/s Polycab India Pvt Ltd<\/span><\/td>\r\n<td><span style=\"font-weight: 400;\">SPV<\/span><\/td>\r\n<td><span style=\"font-weight: 400;\">Electrical projects grouped together, as they are proposed be tendered together for same stretch of road. Electrical work project clubbed with KER-KOC-49. Revised Project name &#8220;Development of Smart Road electrical work in Ernakulam and West Kochi&amp;q*<\/span><\/td>\r\n<td><span style=\"font-weight: 400;\">0.01 Rs. Cr.<\/span><\/td>\r\n<\/tr>\r\n<tr>\r\n<td><span style=\"font-weight: 400;\">Kerala<\/span><\/td>\r\n<td><span style=\"font-weight: 400;\">Kochi<\/span><\/td>\r\n<td><span style=\"font-weight: 400;\">Upgradation of Women Children Hospital, Mattancherry<\/span><\/td>\r\n<td><span style=\"font-weight: 400;\">Social Sectors Health and Education<\/span><\/td>\r\n<td><span style=\"font-weight: 400;\">Improved health and education services<\/span><\/td>\r\n<td><span style=\"font-weight: 400;\">M\/s TDLCCS<\/span><\/td>\r\n<td><span style=\"font-weight: 400;\">SPV<\/span><\/td>\r\n<td><span style=\"font-weight: 400;\">Structure works completed till second floor slab. Portion of second Floor slab need to be demolished and reconstruct due to crack formation and non attainment of required strength in core test.<\/span><\/td>\r\n<td><span style=\"font-weight: 400;\">4.57 Rs. Cr.<\/span><\/td>\r\n<\/tr>\r\n<tr>\r\n<td><span style=\"font-weight: 400;\">Kerala<\/span><\/td>\r\n<td><span style=\"font-weight: 400;\">Kochi<\/span><\/td>\r\n<td><span style=\"font-weight: 400;\">Bulk Meters and Isolation valves with remote meter reading<\/span><\/td>\r\n<td><span style=\"font-weight: 400;\">Water Supply<\/span><\/td>\r\n<td><span style=\"font-weight: 400;\">Assured water supply<\/span><\/td>\r\n<td><span style=\"font-weight: 400;\">Kerala Water Authority<\/span><\/td>\r\n<td><span style=\"font-weight: 400;\">SPV<\/span><\/td>\r\n<td><span style=\"font-weight: 400;\">Work has been awarded and under progress . SPV transferred funds. Project being done on pilot basis.<\/span><\/td>\r\n<td><span style=\"font-weight: 400;\">1.5 Rs. Cr.<\/span><\/td>\r\n<\/tr>\r\n<tr>\r\n<td><span style=\"font-weight: 400;\">Kerala<\/span><\/td>\r\n<td><span style=\"font-weight: 400;\">Kochi<\/span><\/td>\r\n<td><span style=\"font-weight: 400;\">Improvements to Elamkulam STP and collection system Mainland JNNURM scheme<\/span><\/td>\r\n<td><span style=\"font-weight: 400;\">Sewerage and Septage<\/span><\/td>\r\n<td><span style=\"font-weight: 400;\">Improved sanitation condition<\/span><\/td>\r\n<td><span style=\"font-weight: 400;\">Kerala Water Authoirty<\/span><\/td>\r\n<td><span style=\"font-weight: 400;\">Others<\/span><\/td>\r\n<td><span style=\"font-weight: 400;\">Renamed &#8220;Improvements to sewer collection system for mainlands&#8221;. Convergence &#8211; Elamkulam STP has been taken by KWA. Selection Notice issued on 13\/01\/20. Project under AMRUT. Work under progress. 35% work completed<\/span><\/td>\r\n<td><span style=\"font-weight: 400;\">13.7 Rs. Cr.<\/span><\/td>\r\n<\/tr>\r\n<tr>\r\n<td><span style=\"font-weight: 400;\">Kerala<\/span><\/td>\r\n<td><span style=\"font-weight: 400;\">Kochi<\/span><\/td>\r\n<td><span style=\"font-weight: 400;\">Development of Other Roads in Ernakulum<\/span><\/td>\r\n<td><span style=\"font-weight: 400;\">Area Development<\/span><\/td>\r\n<td><span style=\"font-weight: 400;\">Transportation and mobility<\/span><\/td>\r\n<td><span style=\"font-weight: 400;\">M\/s Deens Group<\/span><\/td>\r\n<td><span style=\"font-weight: 400;\">SPV<\/span><\/td>\r\n<td><span style=\"font-weight: 400;\">DBM\/BC\/Interlock tile and all major works completed for 40 out of 40 roads (13.81 km) . Completed Minor rectification works, thermoplastic and enamel paintings, kerb painting, bollards etc are to be done for other roads that lies between Banerji road &amp; Hospital road.<\/span><\/td>\r\n<td><span style=\"font-weight: 400;\">36.3 Rs. Cr.<\/span><\/td>\r\n<\/tr>\r\n<tr>\r\n<td><span style=\"font-weight: 400;\">Kerala<\/span><\/td>\r\n<td><span style=\"font-weight: 400;\">Kochi<\/span><\/td>\r\n<td><span style=\"font-weight: 400;\">Development of Other Roads in West Kochi in Ward 3, 4 and 5<\/span><\/td>\r\n<td><span style=\"font-weight: 400;\">Non Motorised Transport and Walkability<\/span><\/td>\r\n<td><span style=\"font-weight: 400;\">Improved walkability<\/span><\/td>\r\n<td><span style=\"font-weight: 400;\">Riyas B in consortium with CH Abdulla<\/span><\/td>\r\n<td><span style=\"font-weight: 400;\">SPV<\/span><\/td>\r\n<td><span style=\"font-weight: 400;\">The project has been segregated. LoA has been issued for the Project &#8220;Development of Road for Division 3 under Smart City Mission Kochi&#8221;. Name to be changed. Drain cleaning work completed. Drain RHS and scarification for road completed for Muhyidheen Palli Road. Drain dismantled for Chakkara Idukku Road and darin work started at RHS. Interlock tile laying and drain completed for Bazer Road (Road No #06). Interlock repair works completed for Off Mohammend Abdul Rahman Road-1 &amp; 2<\/span><\/td>\r\n<td><span style=\"font-weight: 400;\">7.05 Rs. Cr.<\/span><\/td>\r\n<\/tr>\r\n<tr>\r\n<td><span style=\"font-weight: 400;\">Kerala<\/span><\/td>\r\n<td><span style=\"font-weight: 400;\">Kochi<\/span><\/td>\r\n<td><span style=\"font-weight: 400;\">MLCP at Kacheripady<\/span><\/td>\r\n<td><span style=\"font-weight: 400;\">Area Development<\/span><\/td>\r\n<td><span style=\"font-weight: 400;\">Transportation and mobility<\/span><\/td>\r\n<td><span style=\"font-weight: 400;\">NHIDCL<\/span><\/td>\r\n<td><span style=\"font-weight: 400;\">SPV<\/span><\/td>\r\n<td><span style=\"font-weight: 400;\">EOI published on 3 Mar 18 to take project on PPP. No bids received. Project Scope revised. Tender only for MLCP at Kacheripady published no bidders came forward. Tendered given on nomination to NHIDCL. Site assessment completed. NHIDCL has withdrawn from the Project. Project to be retendered.<\/span><\/td>\r\n<td><span style=\"font-weight: 400;\">7.86 Rs. Cr.<\/span><\/td>\r\n<\/tr>\r\n<tr>\r\n<td><span style=\"font-weight: 400;\">Kerala<\/span><\/td>\r\n<td><span style=\"font-weight: 400;\">Kochi<\/span><\/td>\r\n<td><span style=\"font-weight: 400;\">Construction of 3 Minor Bridges and 2 Foot over Bridges in West Kochi<\/span><\/td>\r\n<td><span style=\"font-weight: 400;\">Non Motorised Transport and Walkability<\/span><\/td>\r\n<td><span style=\"font-weight: 400;\">Improved walkability<\/span><\/td>\r\n<td><span style=\"font-weight: 400;\">M\/s. SKILLED CONSTRUCTION COMPANY LIMITED<\/span><\/td>\r\n<td><span style=\"font-weight: 400;\">SPV<\/span><\/td>\r\n<td><span style=\"font-weight: 400;\">Syed Mohammed Bridge- Pile cap and RCC girder casting completed. Placing of precast girder completed. Chungam Bridge -Utility shifting completed. Test pile completed. Demolition of old bridge completed FOB-1 &#8211; Bund formation &amp; demolition of Foot over Bridge at Adhikarivalappu West completed. Pile casting completed.<\/span><\/td>\r\n<td><span style=\"font-weight: 400;\">13.1 Rs. Cr.<\/span><\/td>\r\n<\/tr>\r\n<tr>\r\n<td><span style=\"font-weight: 400;\">Kerala<\/span><\/td>\r\n<td><span style=\"font-weight: 400;\">Kochi<\/span><\/td>\r\n<td><span style=\"font-weight: 400;\">Undergound HT Line<\/span><\/td>\r\n<td><span style=\"font-weight: 400;\">Energy<\/span><\/td>\r\n<td><span style=\"font-weight: 400;\">Reliability of power supply<\/span><\/td>\r\n<td><span style=\"font-weight: 400;\">M\/s Polycab India Pvt Ltd<\/span><\/td>\r\n<td><span style=\"font-weight: 400;\">SPV<\/span><\/td>\r\n<td><span style=\"font-weight: 400;\">Electrical Projects grouped together, as they are proposed be tendered together for same stretch of road(Clubbed with KER-KOC-49). The revised name of the project is &#8220;Development of Smart Road Electrical Work in Ernakulam and West Kochi&#8221;. Ten*<\/span><\/td>\r\n<td><span style=\"font-weight: 400;\">0.01 Rs. Cr.<\/span><\/td>\r\n<\/tr>\r\n<tr>\r\n<td><span style=\"font-weight: 400;\">Kerala<\/span><\/td>\r\n<td><span style=\"font-weight: 400;\">Kochi<\/span><\/td>\r\n<td><span style=\"font-weight: 400;\">AMR Metering &#8211; Three phase<\/span><\/td>\r\n<td><span style=\"font-weight: 400;\">Energy<\/span><\/td>\r\n<td><span style=\"font-weight: 400;\">Reliability of power supply<\/span><\/td>\r\n<td><span style=\"font-weight: 400;\">M\/s Polycab India Pvt Ltd<\/span><\/td>\r\n<td><span style=\"font-weight: 400;\">SPV<\/span><\/td>\r\n<td><span style=\"font-weight: 400;\">Electrical Projects grouped together, as they are proposed be tendered together for same stretch of road. Electrical work project clubbed with KER-KOC-49. Revised project name &#8220;Development Smart Road Electrical Work&#8221; Project tendered with KER-*<\/span><\/td>\r\n<td><span style=\"font-weight: 400;\">0.01 Rs. Cr.<\/span><\/td>\r\n<\/tr>\r\n<tr>\r\n<td><span style=\"font-weight: 400;\">Kerala<\/span><\/td>\r\n<td><span style=\"font-weight: 400;\">Kochi<\/span><\/td>\r\n<td><span style=\"font-weight: 400;\">AMR Metering &#8211; HT<\/span><\/td>\r\n<td><span style=\"font-weight: 400;\">Energy<\/span><\/td>\r\n<td><span style=\"font-weight: 400;\">Reliability of power supply<\/span><\/td>\r\n<td><span style=\"font-weight: 400;\">M\/s Polycab India Pvt Ltd<\/span><\/td>\r\n<td><span style=\"font-weight: 400;\">SPV<\/span><\/td>\r\n<td><span style=\"font-weight: 400;\">Electrical Projects grouped together, as they are proposed be tendered together for same stretch of road. Electrical work project clubbed with KER-KOC-49. Revised project name &#8220;Development of Smart road electrical work in Ernakulam and West Kochi<\/span><\/td>\r\n<td><span style=\"font-weight: 400;\">0.01 Rs. Cr.<\/span><\/td>\r\n<\/tr>\r\n<tr>\r\n<td><span style=\"font-weight: 400;\">Kerala<\/span><\/td>\r\n<td><span style=\"font-weight: 400;\">Kochi<\/span><\/td>\r\n<td><span style=\"font-weight: 400;\">Installation of Ring Main Units with Remote terminal units<\/span><\/td>\r\n<td><span style=\"font-weight: 400;\">Energy<\/span><\/td>\r\n<td><span style=\"font-weight: 400;\">Reliability of power supply<\/span><\/td>\r\n<td><span style=\"font-weight: 400;\">M\/s Polycab India Pvt Ltd<\/span><\/td>\r\n<td><span style=\"font-weight: 400;\">SPV<\/span><\/td>\r\n<td><span style=\"font-weight: 400;\">Electrical projects grouped together, as they are proposed be tendered together for same stretch of road. Electrical work project clubbed with KER-KOC-49. Revised Project name &#8220;Development of Smart road electrical work in Ernakulam and West Kochi&amp;q*<\/span><\/td>\r\n<td><span style=\"font-weight: 400;\">0.01 Rs. Cr.<\/span><\/td>\r\n<\/tr>\r\n<tr>\r\n<td><span style=\"font-weight: 400;\">Kerala<\/span><\/td>\r\n<td><span style=\"font-weight: 400;\">Kochi<\/span><\/td>\r\n<td><span style=\"font-weight: 400;\">Smart Meters (AMR)<\/span><\/td>\r\n<td><span style=\"font-weight: 400;\">Energy<\/span><\/td>\r\n<td><span style=\"font-weight: 400;\">Reliability of power supply<\/span><\/td>\r\n<td><span style=\"font-weight: 400;\">M\/s Polycab India Pvt Ltd<\/span><\/td>\r\n<td><span style=\"font-weight: 400;\">SPV<\/span><\/td>\r\n<td><span style=\"font-weight: 400;\">Electrical projects grouped together, as they are proposed be tendered together for same stretch of road. Electrical work project clubbed with KER-KOC-49. Revised Project name &#8220;Development of Smart Road Electrical work in Ernakulam and West Kochi *<\/span><\/td>\r\n<td><span style=\"font-weight: 400;\">0.01 Rs. Cr.<\/span><\/td>\r\n<\/tr>\r\n<tr>\r\n<td><span style=\"font-weight: 400;\">Kerala<\/span><\/td>\r\n<td><span style=\"font-weight: 400;\">Kochi<\/span><\/td>\r\n<td><span style=\"font-weight: 400;\">Container Toilets<\/span><\/td>\r\n<td><span style=\"font-weight: 400;\">Social Sectors Health and Education<\/span><\/td>\r\n<td><span style=\"font-weight: 400;\">Improved sanitation condition<\/span><\/td>\r\n<td><span style=\"font-weight: 400;\">CREEDAI &amp; BKRG<\/span><\/td>\r\n<td><span style=\"font-weight: 400;\">SPV<\/span><\/td>\r\n<td><span style=\"font-weight: 400;\">Revised Name of project: Construction of Public Toilet Facilities in Kochi. Two toilets given on nomination to CREEDAI &amp; BKRG. Awaiting MoU to be signed and other clearance<\/span><\/td>\r\n<td><span style=\"font-weight: 400;\">1.8 Rs. Cr.<\/span><\/td>\r\n<\/tr>\r\n<tr>\r\n<td><span style=\"font-weight: 400;\">Kerala<\/span><\/td>\r\n<td><span style=\"font-weight: 400;\">Kochi<\/span><\/td>\r\n<td><span style=\"font-weight: 400;\">Development of open spaces and playgrounds<\/span><\/td>\r\n<td><span style=\"font-weight: 400;\">Area Development<\/span><\/td>\r\n<td><span style=\"font-weight: 400;\">Access to open spaces<\/span><\/td>\r\n<td><span style=\"font-weight: 400;\">M\/s SAJI JACOB &amp; BABU JOSEPH Consortium<\/span><\/td>\r\n<td><span style=\"font-weight: 400;\">SPV<\/span><\/td>\r\n<td><span style=\"font-weight: 400;\">Two projects clubbed together one from open space module &amp; the second from the tourism module that is a museum of freedom struggle. Hence project name is to be updated. All works completed except for Testing &amp; Commissioning pending. Electrical connection received.<\/span><\/td>\r\n<td><span style=\"font-weight: 400;\">3.5 Rs. Cr.<\/span><\/td>\r\n<\/tr>\r\n<tr>\r\n<td><span style=\"font-weight: 400;\">Kerala<\/span><\/td>\r\n<td><span style=\"font-weight: 400;\">Kochi<\/span><\/td>\r\n<td><span style=\"font-weight: 400;\">Broadway Market and Ernakulam market Redevelopment Mattanchery Spice market<\/span><\/td>\r\n<td><span style=\"font-weight: 400;\">Economic Development<\/span><\/td>\r\n<td><span style=\"font-weight: 400;\">Boost to local identity and economy<\/span><\/td>\r\n<td><span style=\"font-weight: 400;\">M\/s Cresent Contractors Pvt. Ltd.<\/span><\/td>\r\n<td><span style=\"font-weight: 400;\">SPV<\/span><\/td>\r\n<td><span style=\"font-weight: 400;\">Reclassified as Broadway Market, Ernakulam market Redevelopment and Mattancherry Spice market would be different projects. Project name change requested to &#8220;Redevelopment of Ernakulam Market&#8221; Soil test to initiate.<\/span><\/td>\r\n<td><span style=\"font-weight: 400;\">68.8 Rs. Cr.<\/span><\/td>\r\n<\/tr>\r\n<tr>\r\n<td><span style=\"font-weight: 400;\">Kerala<\/span><\/td>\r\n<td><span style=\"font-weight: 400;\">Kochi<\/span><\/td>\r\n<td><span style=\"font-weight: 400;\">Upgradation of facilities &#8211; Basic Services, Digital classrooms, Libraries, Eco-toilets, Sports kits , Biogas plant, Urban farming spaceetc<\/span><\/td>\r\n<td><span style=\"font-weight: 400;\">Social Sectors Health and Education<\/span><\/td>\r\n<td><span style=\"font-weight: 400;\">Improved health and education services<\/span><\/td>\r\n<td><span style=\"font-weight: 400;\">M\/s M.D. ESTHAPPAN INFRASTRUCTURES (P) LTD<\/span><\/td>\r\n<td><span style=\"font-weight: 400;\">SPV<\/span><\/td>\r\n<td><span style=\"font-weight: 400;\">there were two components of this project IT component and Civil up gradation. 1. ICT project &#8211; Smart Classroom. The tender dates are for Smart classroom project. Later State govt cancelled the tender and then Civil part was tendered. Which is now awarded. Piling completed. Pile chipping &amp; excavation on going. Pile load test completed. Casting of pile cap &amp; plinth beam on progress<\/span><\/td>\r\n<td><span style=\"font-weight: 400;\">5.6 Rs. Cr.<\/span><\/td>\r\n<\/tr>\r\n<tr>\r\n<td><span style=\"font-weight: 400;\">Kerala<\/span><\/td>\r\n<td><span style=\"font-weight: 400;\">Kochi<\/span><\/td>\r\n<td><span style=\"font-weight: 400;\">5 Rapid response boats for water transport safety<\/span><\/td>\r\n<td><span style=\"font-weight: 400;\">Safety and Security<\/span><\/td>\r\n<td><span style=\"font-weight: 400;\">Improved safety and security of citizens, particularly vulnerable groups (women, children and elders)<\/span><\/td>\r\n<td><span style=\"font-weight: 400;\">Kochi Metro Rail Limited- Water Metro<\/span><\/td>\r\n<td><span style=\"font-weight: 400;\">Others<\/span><\/td>\r\n<td><span style=\"font-weight: 400;\">Work awarded to M\/s. Ultramarine Yachts Pvt. Ltd<\/span><\/td>\r\n<td><span style=\"font-weight: 400;\">5.67 Rs. Cr.<\/span><\/td>\r\n<\/tr>\r\n<tr>\r\n<td><span style=\"font-weight: 400;\">Kerala<\/span><\/td>\r\n<td><span style=\"font-weight: 400;\">Kochi<\/span><\/td>\r\n<td><span style=\"font-weight: 400;\">Replacement of 20 kms of Distribution line with D.I. pipes including Road cutting charges<\/span><\/td>\r\n<td><span style=\"font-weight: 400;\">Water Supply<\/span><\/td>\r\n<td><span style=\"font-weight: 400;\">Assured water supply<\/span><\/td>\r\n<td>\u00a0<\/td>\r\n<td><span style=\"font-weight: 400;\">Others<\/span><\/td>\r\n<td>\u00a0<\/td>\r\n<td><span style=\"font-weight: 400;\">35 Rs. Cr.<\/span><\/td>\r\n<\/tr>\r\n<tr>\r\n<td><span style=\"font-weight: 400;\">Kerala<\/span><\/td>\r\n<td><span style=\"font-weight: 400;\">Kochi<\/span><\/td>\r\n<td><span style=\"font-weight: 400;\">Boatyard and Command Control Centre<\/span><\/td>\r\n<td><span style=\"font-weight: 400;\">Urban Transport<\/span><\/td>\r\n<td><span style=\"font-weight: 400;\">Transportation and mobility<\/span><\/td>\r\n<td><span style=\"font-weight: 400;\">KMRL &#8211; Water Metro<\/span><\/td>\r\n<td><span style=\"font-weight: 400;\">Others<\/span><\/td>\r\n<td><span style=\"font-weight: 400;\">Project taken up by KMRL &#8211; water metro. LoA issued to M\/s Amnex. Work under Progress<\/span><\/td>\r\n<td><span style=\"font-weight: 400;\">20 Rs. Cr.<\/span><\/td>\r\n<\/tr>\r\n<tr>\r\n<td><span style=\"font-weight: 400;\">Kerala<\/span><\/td>\r\n<td><span style=\"font-weight: 400;\">Kochi<\/span><\/td>\r\n<td><span style=\"font-weight: 400;\">Development of Smart Roads in West Kochi<\/span><\/td>\r\n<td><span style=\"font-weight: 400;\">Area Development<\/span><\/td>\r\n<td><span style=\"font-weight: 400;\">Transportation and mobility<\/span><\/td>\r\n<td><span style=\"font-weight: 400;\">M\/s ABC Builders<\/span><\/td>\r\n<td><span style=\"font-weight: 400;\">SPV<\/span><\/td>\r\n<td><span style=\"font-weight: 400;\">The revised project name is &#8220;Development of Smart Roads in West Kochi under Smart City Mission&#8221; Work order issued to M\/s ABC Builders. Hon\u2019ble High Court of Kerala has directed to complete the works of K.B. Jacob Road, Bellar Road and River Road by October 30, 2021. However, the Contractor failed to complete the works as per Court Order. Termination Notice issued to the Contractor.<\/span><\/td>\r\n<td><span style=\"font-weight: 400;\">24.5 Rs. Cr.<\/span><\/td>\r\n<\/tr>\r\n<tr>\r\n<td><span style=\"font-weight: 400;\">Kerala<\/span><\/td>\r\n<td><span style=\"font-weight: 400;\">Kochi<\/span><\/td>\r\n<td><span style=\"font-weight: 400;\">Undergound LT Line<\/span><\/td>\r\n<td><span style=\"font-weight: 400;\">Energy<\/span><\/td>\r\n<td><span style=\"font-weight: 400;\">Reliability of power supply<\/span><\/td>\r\n<td><span style=\"font-weight: 400;\">M\/s Polycab India Pvt Ltd<\/span><\/td>\r\n<td><span style=\"font-weight: 400;\">SPV<\/span><\/td>\r\n<td><span style=\"font-weight: 400;\">Electrical Projects grouped together, as they are proposed be tendered together for same stretch of road. project clubbed with KER-KOC-49. The Revised name of the project is &#8220;Development of Smart Road Electrical Work in Ernakulam &amp; West Kochi. *<\/span><\/td>\r\n<td><span style=\"font-weight: 400;\">0.01 Rs. Cr.<\/span><\/td>\r\n<\/tr>\r\n<tr>\r\n<td><span style=\"font-weight: 400;\">Kerala<\/span><\/td>\r\n<td><span style=\"font-weight: 400;\">Kochi<\/span><\/td>\r\n<td><span style=\"font-weight: 400;\">LT UG for Streetlights<\/span><\/td>\r\n<td><span style=\"font-weight: 400;\">Energy<\/span><\/td>\r\n<td><span style=\"font-weight: 400;\">Reliability of power supply<\/span><\/td>\r\n<td><span style=\"font-weight: 400;\">M\/s Polycab India Pvt Ltd<\/span><\/td>\r\n<td><span style=\"font-weight: 400;\">SPV<\/span><\/td>\r\n<td><span style=\"font-weight: 400;\">Electrical Projects grouped together, as they are proposed be tendered together for same stretch of road. project clubbed KER-KOC-49. Revised project name is &#8220;Development of Smar Road Electrical Work in Ernakulam and West Kochi&#8221;<\/span><\/td>\r\n<td><span style=\"font-weight: 400;\">0.01 Rs. Cr.<\/span><\/td>\r\n<\/tr>\r\n<tr>\r\n<td><span style=\"font-weight: 400;\">Kerala<\/span><\/td>\r\n<td><span style=\"font-weight: 400;\">Kochi<\/span><\/td>\r\n<td><span style=\"font-weight: 400;\">AMR Metering &#8211; Single phase<\/span><\/td>\r\n<td><span style=\"font-weight: 400;\">Energy<\/span><\/td>\r\n<td><span style=\"font-weight: 400;\">Reliability of power supply<\/span><\/td>\r\n<td><span style=\"font-weight: 400;\">M\/s Polycab India Pvt Ltd<\/span><\/td>\r\n<td><span style=\"font-weight: 400;\">SPV<\/span><\/td>\r\n<td><span style=\"font-weight: 400;\">Electrical Projects grouped together, as they are proposed be tendered together for same stretch of road. Electrical work project clubbed with KER-KOC-49. Revised project name &#8220;Development of Smart Road electrical work in Ernakulam and West Kochi&amp;q*<\/span><\/td>\r\n<td><span style=\"font-weight: 400;\">0.01 Rs. Cr.<\/span><\/td>\r\n<\/tr>\r\n<tr>\r\n<td><span style=\"font-weight: 400;\">Kerala<\/span><\/td>\r\n<td><span style=\"font-weight: 400;\">Kochi<\/span><\/td>\r\n<td><span style=\"font-weight: 400;\">Development of Electrical Infrastructure in ABD<\/span><\/td>\r\n<td><span style=\"font-weight: 400;\">Energy<\/span><\/td>\r\n<td><span style=\"font-weight: 400;\">Reliability of power supply<\/span><\/td>\r\n<td><span style=\"font-weight: 400;\">M\/s Polycab India Pvt Ltd<\/span><\/td>\r\n<td><span style=\"font-weight: 400;\">SPV<\/span><\/td>\r\n<td><span style=\"font-weight: 400;\">Electrical Projects grouped together, as they are proposed be tendered together for same stretch of road. The revised name of the project is &#8220;Development of smart Roads electrical work in Ernakulam and West Kochi under Smart City Mission&#8221;. Work Progress- DH road &#8211; 100% AM road &#8211; 100% SH road- 98% PA road &#8211; 88% All works completed for an average length of 3.80 Km in Smart roads Ernakulam.<\/span><\/td>\r\n<td><span style=\"font-weight: 400;\">63.4 Rs. Cr.<\/span><\/td>\r\n<\/tr>\r\n<tr>\r\n<td><span style=\"font-weight: 400;\">Kerala<\/span><\/td>\r\n<td><span style=\"font-weight: 400;\">Kochi<\/span><\/td>\r\n<td><span style=\"font-weight: 400;\">IMPLEMENTATION OF SMART LED LIGHTS IN ABD<\/span><\/td>\r\n<td><span style=\"font-weight: 400;\">Energy<\/span><\/td>\r\n<td><span style=\"font-weight: 400;\">Reduced dependence on and conservation of energy from conventional sources<\/span><\/td>\r\n<td><span style=\"font-weight: 400;\">M\/s Schnell Energy Equipment Private Limited<\/span><\/td>\r\n<td><span style=\"font-weight: 400;\">SPV<\/span><\/td>\r\n<td><span style=\"font-weight: 400;\">Work Order Has been issued. 27 \/ 87 roads completed(6.33 km) at West Kochi and 28\/40(7.50 km) roads completed at Erankulam.<\/span><\/td>\r\n<td><span style=\"font-weight: 400;\">36 Rs. Cr.<\/span><\/td>\r\n<\/tr>\r\n<tr>\r\n<td><span style=\"font-weight: 400;\">Kerala<\/span><\/td>\r\n<td><span style=\"font-weight: 400;\">Kochi<\/span><\/td>\r\n<td><span style=\"font-weight: 400;\">Water transport infrastructure around 12-100 pax boats<\/span><\/td>\r\n<td><span style=\"font-weight: 400;\">Urban Transport<\/span><\/td>\r\n<td><span style=\"font-weight: 400;\">Transportation and mobility<\/span><\/td>\r\n<td><span style=\"font-weight: 400;\">KMRL &#8211; Water Metro<\/span><\/td>\r\n<td><span style=\"font-weight: 400;\">Others<\/span><\/td>\r\n<td><span style=\"font-weight: 400;\">Awarded by Kochi Metro Rail Ltd. Water metro division M\/s Cochin Shipyard for 23 boats (100pax) INR 178 Cr for two routes. First boat delivery on 27th Oct 2020 (11 months from start date 14 Sept 2019) Next 4 boats in 90 days after above. Next 4 boats after 60 days Next 4 boats after 60 days. Next 5 boats in 60 days. Next 5 boats in 60 days.<\/span><\/td>\r\n<td><span style=\"font-weight: 400;\">56 Rs. Cr.<\/span><\/td>\r\n<\/tr>\r\n<tr>\r\n<td><span style=\"font-weight: 400;\">Kerala<\/span><\/td>\r\n<td><span style=\"font-weight: 400;\">Kochi<\/span><\/td>\r\n<td><span style=\"font-weight: 400;\">Integrated development of 4 Hospitals in West Kochi &#8211; Excellence in Secondary care<\/span><\/td>\r\n<td><span style=\"font-weight: 400;\">Social Sectors Health and Education<\/span><\/td>\r\n<td><span style=\"font-weight: 400;\">Improved health and education services<\/span><\/td>\r\n<td><span style=\"font-weight: 400;\">M\/s TTDLCCS<\/span><\/td>\r\n<td><span style=\"font-weight: 400;\">SPV<\/span><\/td>\r\n<td><span style=\"font-weight: 400;\">Project rename &#8220;Integrated Development of Fort Kochi Taluk Hospital&#8221; To be segregated as these projects would be 2 separate projects. The estimated cost is 10 Cr. Both projects are tendered as limited tender. The second project is KER-KOC-089. Work order Issued. Pile work completed. Substructure works completed. First floor Slab shuttering works in progress.<\/span><\/td>\r\n<td><span style=\"font-weight: 400;\">4.65 Rs. Cr.<\/span><\/td>\r\n<\/tr>\r\n<tr>\r\n<td><span style=\"font-weight: 400;\">Kerala<\/span><\/td>\r\n<td><span style=\"font-weight: 400;\">Kochi<\/span><\/td>\r\n<td><span style=\"font-weight: 400;\">Rehabilitation of Ernakulam Market<\/span><\/td>\r\n<td><span style=\"font-weight: 400;\">Economic Development<\/span><\/td>\r\n<td><span style=\"font-weight: 400;\">Boost to local identity and economy<\/span><\/td>\r\n<td><span style=\"font-weight: 400;\">M\/s Marymatha Infrastructure Pvt Ltd.<\/span><\/td>\r\n<td><span style=\"font-weight: 400;\">SPV<\/span><\/td>\r\n<td><span style=\"font-weight: 400;\">This project is rehabilitation of vendors in existing Ernakulam market redevelopment site. All Structural, Electrical, Fire fighting, Paver and finishing work as per the scope completed.<\/span><\/td>\r\n<td><span style=\"font-weight: 400;\">4 Rs. Cr.<\/span><\/td>\r\n<\/tr>\r\n<tr>\r\n<td><span style=\"font-weight: 400;\">Kerala<\/span><\/td>\r\n<td><span style=\"font-weight: 400;\">Kochi<\/span><\/td>\r\n<td><span style=\"font-weight: 400;\">Development of Roads for Division 4, West Kochi<\/span><\/td>\r\n<td><span style=\"font-weight: 400;\">Non Motorised Transport and Walkability<\/span><\/td>\r\n<td><span style=\"font-weight: 400;\">Improved walkability<\/span><\/td>\r\n<td><span style=\"font-weight: 400;\">Riyas B in consortium with CH Abdulla<\/span><\/td>\r\n<td><span style=\"font-weight: 400;\">SPV<\/span><\/td>\r\n<td><span style=\"font-weight: 400;\">Work order issued for the project &#8220;Development of Roads for Division 4, West Kochi&#8221;. Drain cleaning work completed. Precast slab casting. Drain works completed for Dr. JA Bhatt Road, Ranganath Road and Off road 33 (Road No 81). Drain work completed for Road No 31,32,33,34,35-B,36-B and 77. Interlock tile laying Completed for Off-road 33,24, 83 (Road No 81) and Ranganathe Road,<\/span><\/td>\r\n<td><span style=\"font-weight: 400;\">7.07 Rs. Cr.<\/span><\/td>\r\n<\/tr>\r\n<tr>\r\n<td><span style=\"font-weight: 400;\">Kerala<\/span><\/td>\r\n<td><span style=\"font-weight: 400;\">Kochi<\/span><\/td>\r\n<td><span style=\"font-weight: 400;\">Construction of Multi-storeyed Housing Complex at Thuruthy, Fort Kochi on EPC<\/span><\/td>\r\n<td><span style=\"font-weight: 400;\">Housing<\/span><\/td>\r\n<td><span style=\"font-weight: 400;\">Improved living conditions for the urban poor<\/span><\/td>\r\n<td><span style=\"font-weight: 400;\">Kool Home Builders<\/span><\/td>\r\n<td><span style=\"font-weight: 400;\">SPV<\/span><\/td>\r\n<td><span style=\"font-weight: 400;\">LoA issued to Kool Home Builders. Site team mobilized and a soil test report was submitted. Drawing submitted by the contractor. Site Clearing started. Tree cutting, dismantling of the existing structure and site clearance completed. Fencing completed. Cost of the work order is INR 44.01 to be updated on GMIS. Value to be updated by the MMU team.<\/span><\/td>\r\n<td><span style=\"font-weight: 400;\">46 Rs. Cr.<\/span><\/td>\r\n<\/tr>\r\n<tr>\r\n<td><span style=\"font-weight: 400;\">Kerala<\/span><\/td>\r\n<td><span style=\"font-weight: 400;\">Kochi<\/span><\/td>\r\n<td><span style=\"font-weight: 400;\">Development of Roads for Division 5A, West Kochi<\/span><\/td>\r\n<td><span style=\"font-weight: 400;\">Non Motorised Transport and Walkability<\/span><\/td>\r\n<td><span style=\"font-weight: 400;\">Improved walkability<\/span><\/td>\r\n<td><span style=\"font-weight: 400;\">Riyas B in consortium with CH Abdulla<\/span><\/td>\r\n<td><span style=\"font-weight: 400;\">SPV<\/span><\/td>\r\n<td><span style=\"font-weight: 400;\">LoA has been issued for the Project &#8220;Development of Roads for Division 5A, West Kochi&#8221;. Drain cleaning work completed. Drain work completed for Jain Temple Road. Interlock tile repair works completed for Gopalakrishnan Avenue Road. DBM works completed<\/span><\/td>\r\n<td><span style=\"font-weight: 400;\">6.3 Rs. Cr.<\/span><\/td>\r\n<\/tr>\r\n<tr>\r\n<td><span style=\"font-weight: 400;\">Kerala<\/span><\/td>\r\n<td><span style=\"font-weight: 400;\">Kochi<\/span><\/td>\r\n<td><span style=\"font-weight: 400;\">Development of Roads for Division 5-B, West Kochi<\/span><\/td>\r\n<td><span style=\"font-weight: 400;\">Non Motorised Transport and Walkability<\/span><\/td>\r\n<td><span style=\"font-weight: 400;\">Improved walkability<\/span><\/td>\r\n<td><span style=\"font-weight: 400;\">Riyas B in consortium with CH Abdulla<\/span><\/td>\r\n<td><span style=\"font-weight: 400;\">SPV<\/span><\/td>\r\n<td><span style=\"font-weight: 400;\">Work Order has been issued. Drain cleaning work completed. Drain works are in progress in Jew Town Road, Synagogue Lane, Moulana Azad Road and TA Kunjali Srank road. Granite stone laying at Synagogue Lane nearly to completion. Bombay Tailoring Road Interlock repair works completed. DBM done for Road No 97, 08, 10, 11, 12, 13, 20<\/span><\/td>\r\n<td><span style=\"font-weight: 400;\">5.63 Rs.\u00a0<\/span><\/td>\r\n<\/tr>\r\n<\/tbody>\r\n<\/table>\r\n<\/figure>\r\n\r\n\r\n\r\n<p class=\"has-text-align-center\"><em>source: smartcities[dot]gov[dot]in<\/em><\/p>\r\n\r\n\r\n\r\n<h3 class=\"wp-block-heading\" id=\"h-tender-projects-status\">Tender Projects Status<\/h3>\r\n\r\n\r\n\r\n<p class=\"has-text-align-justify\"><span style=\"font-weight: 400;\">Here is the table showing the projects of Kochi Smart City which is yet in the tender stage with other details with significance:\u00a0<\/span><\/p>\r\n\r\n\r\n\r\n<figure class=\"wp-block-table\">\r\n<table>\r\n<tbody>\r\n<tr>\r\n<td><b>State<\/b><\/td>\r\n<td><b>City<\/b><\/td>\r\n<td><b>Project Name<\/b><\/td>\r\n<td><b>Sector<\/b><\/td>\r\n<td><b>Impact<\/b><\/td>\r\n<td><b>Implementing Agency<\/b><\/td>\r\n<td><b>Project Being Taken Up By<\/b><\/td>\r\n<td><b>Mention The Project Milestones<\/b><\/td>\r\n<td><b>Dpr Cost Estimated Project Cost<\/b><\/td>\r\n<\/tr>\r\n<tr>\r\n<td><span style=\"font-weight: 400;\">Kerala<\/span><\/td>\r\n<td><span style=\"font-weight: 400;\">Kochi<\/span><\/td>\r\n<td><span style=\"font-weight: 400;\">Anganwadis Public Schools<\/span><\/td>\r\n<td><span style=\"font-weight: 400;\">Social Sectors Health and Education<\/span><\/td>\r\n<td><span style=\"font-weight: 400;\">Improved health and education services<\/span><\/td>\r\n<td>\u00a0<\/td>\r\n<td><span style=\"font-weight: 400;\">SPV<\/span><\/td>\r\n<td><span style=\"font-weight: 400;\">Project Tendered as &#8220;Construction and Renovation Of Anganwadis And Public Toilet Facilities Under Smart Cities Mission, Kochi&#8221;<\/span><\/td>\r\n<td><span style=\"font-weight: 400;\">4.5 Rs. Cr.<\/span><\/td>\r\n<\/tr>\r\n<tr>\r\n<td><span style=\"font-weight: 400;\">Kerala<\/span><\/td>\r\n<td><span style=\"font-weight: 400;\">Kochi<\/span><\/td>\r\n<td><span style=\"font-weight: 400;\">Equipments including Smart Street sweepers GPS enabled Vehicles Compactors<\/span><\/td>\r\n<td><span style=\"font-weight: 400;\">Solid Waste Management<\/span><\/td>\r\n<td><span style=\"font-weight: 400;\">Improved sanitation condition<\/span><\/td>\r\n<td>\u00a0<\/td>\r\n<td><span style=\"font-weight: 400;\">SPV<\/span><\/td>\r\n<td><span style=\"font-weight: 400;\">This project has been subdivided in three projects. 1. Smart &amp; Improved Secondary Storage &amp; Transportation of Solid Waste using Portable Compactor Technology Tendered. 2.Smart &amp; Improved Mechanised Street Sweeping at West Kochi &amp; Ernakulum in ABD area Tendered (new ID created ). Project to be re-tender.<\/span><\/td>\r\n<td><span style=\"font-weight: 400;\">4.4 Rs. Cr.<\/span><\/td>\r\n<\/tr>\r\n<tr>\r\n<td><span style=\"font-weight: 400;\">Kerala<\/span><\/td>\r\n<td><span style=\"font-weight: 400;\">Kochi<\/span><\/td>\r\n<td><span style=\"font-weight: 400;\">Standard Hawker zones in FortKochi<\/span><\/td>\r\n<td><span style=\"font-weight: 400;\">Economic Development<\/span><\/td>\r\n<td><span style=\"font-weight: 400;\">Improved walkability<\/span><\/td>\r\n<td>\u00a0<\/td>\r\n<td><span style=\"font-weight: 400;\">SPV<\/span><\/td>\r\n<td><span style=\"font-weight: 400;\">Project Tender as &#8220;Vending Kiosks in Dutch Palace Entry area under Smart City Mission, Kochi&#8221;.<\/span><\/td>\r\n<td><span style=\"font-weight: 400;\">5 Rs. Cr.<\/span><\/td>\r\n<\/tr>\r\n<tr>\r\n<td><span style=\"font-weight: 400;\">Kerala<\/span><\/td>\r\n<td><span style=\"font-weight: 400;\">Kochi<\/span><\/td>\r\n<td><span style=\"font-weight: 400;\">Supply, Operation and Maintenance of Mechanised Street Sweeping Machines<\/span><\/td>\r\n<td><span style=\"font-weight: 400;\">Solid Waste Management<\/span><\/td>\r\n<td><span style=\"font-weight: 400;\">Improved sanitation condition<\/span><\/td>\r\n<td>\u00a0<\/td>\r\n<td><span style=\"font-weight: 400;\">SPV<\/span><\/td>\r\n<td><span style=\"font-weight: 400;\">Tender Cancelled<\/span><\/td>\r\n<td><span style=\"font-weight: 400;\">3.2 Rs. Cr.<\/span><\/td>\r\n<\/tr>\r\n<tr>\r\n<td><span style=\"font-weight: 400;\">Kerala<\/span><\/td>\r\n<td><span style=\"font-weight: 400;\">Kochi<\/span><\/td>\r\n<td><span style=\"font-weight: 400;\">Digital Outdoor LED Display at Durbar Hall Ground<\/span><\/td>\r\n<td><span style=\"font-weight: 400;\">Area Development<\/span><\/td>\r\n<td><span style=\"font-weight: 400;\">Access to open spaces<\/span><\/td>\r\n<td>\u00a0<\/td>\r\n<td><span style=\"font-weight: 400;\">SPV<\/span><\/td>\r\n<td><span style=\"font-weight: 400;\">Project Tender cancelled. To be removed from GMIS<\/span><\/td>\r\n<td><span style=\"font-weight: 400;\">1.45 Rs. Cr.<\/span><\/td>\r\n<\/tr>\r\n<tr>\r\n<td><span style=\"font-weight: 400;\">Kerala<\/span><\/td>\r\n<td><span style=\"font-weight: 400;\">Kochi<\/span><\/td>\r\n<td><span style=\"font-weight: 400;\">Procurement of Suction &#8211; cum &#8211; Jetting Machine<\/span><\/td>\r\n<td><span style=\"font-weight: 400;\">Solid Waste Management<\/span><\/td>\r\n<td><span style=\"font-weight: 400;\">Improved sanitation condition<\/span><\/td>\r\n<td>\u00a0<\/td>\r\n<td><span style=\"font-weight: 400;\">SPV<\/span><\/td>\r\n<td><span style=\"font-weight: 400;\">Tender cancelled<\/span><\/td>\r\n<td><span style=\"font-weight: 400;\">1.6 Rs. Cr.<\/span><\/td>\r\n<\/tr>\r\n<\/tbody>\r\n<\/table>\r\n<\/figure>\r\n\r\n\r\n\r\n<p class=\"has-text-align-center\"><em>source: smartcities[dot]gov[dot]in<\/em><\/p>\r\n\r\n\r\n\r\n<h2 class=\"wp-block-heading\" id=\"h-kochi-smart-city-portal-map\">Kochi Smart City Portal Map<\/h2>\r\n\r\n\r\n\r\n<p class=\"has-text-align-justify\"><span style=\"font-weight: 400;\">A number of factors influence the concept of a smart city. It comprises emphasizing bettering health care, the environment, and transportation, and doing a comprehensive analysis of the city. As a result, there are numerous ways to conceptualise the Smart City Kochi approach. Providing modern infrastructure, sustainable amenities, technology and development, inventive methods to maintain a clean environment, and other social services for the community are the five areas that need to be handled. Creating a Smart City Kochi map highlighting the city&#8217;s priority areas is the first step.<\/span><\/p>\r\n\r\n\r\n\r\n<div class=\"wp-block-image\">\r\n<figure class=\"aligncenter\"><img decoding=\"async\" loading=\"lazy\" width=\"788\" height=\"741\" class=\"wp-image-73609\" src=\"https:\/\/www.squareyards.com\/blog\/wp-content\/uploads\/2022\/12\/smart-city-kochi-map.jpg\" alt=\"smart city kochi map\" srcset=\"https:\/\/www.squareyards.com\/blog\/wp-content\/uploads\/2022\/12\/smart-city-kochi-map.jpg 788w, https:\/\/www.squareyards.com\/blog\/wp-content\/uploads\/2022\/12\/smart-city-kochi-map-300x282.jpg 300w, https:\/\/www.squareyards.com\/blog\/wp-content\/uploads\/2022\/12\/smart-city-kochi-map-768x722.jpg 768w, https:\/\/www.squareyards.com\/blog\/wp-content\/uploads\/2022\/12\/smart-city-kochi-map-24x24.jpg 24w\" sizes=\"(max-width: 788px) 100vw, 788px\" \/><\/figure>\r\n<\/div>\r\n\r\n\r\n\r\n<p class=\"has-text-align-center\"><em><span style=\"font-weight: 400;\">source: http:\/\/www[dot]spiderkerala[dot]net<\/span><\/em><\/p>\r\n\r\n\r\n\r\n<h2 class=\"wp-block-heading\" id=\"h-how-to-log-in-to-the-kochi-smart-city-portal\">How to Log In to the Kochi Smart City Portal?<\/h2>\r\n\r\n\r\n\r\n<p class=\"has-text-align-justify\"><span style=\"font-weight: 400;\">The following are steps to login for Kochi Smart City via the official portal that let the citizens learn and avail of the services without any potential hustle:<\/span><\/p>\r\n\r\n\r\n\r\n<ul>\r\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">Go to the official site: Kochi\/Cochin Smart Mission Limited.<\/span><\/li>\r\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">Find the option \u201clogin\/register\u201d in the right-hand side top corner of the home page.<\/span><\/li>\r\n<\/ul>\r\n\r\n\r\n\r\n<figure class=\"wp-block-image\"><img decoding=\"async\" loading=\"lazy\" width=\"540\" height=\"536\" class=\"wp-image-73607\" src=\"https:\/\/www.squareyards.com\/blog\/wp-content\/uploads\/2022\/12\/smart-city-kochi-login.jpg\" alt=\"smart city kochi login\" srcset=\"https:\/\/www.squareyards.com\/blog\/wp-content\/uploads\/2022\/12\/smart-city-kochi-login.jpg 540w, https:\/\/www.squareyards.com\/blog\/wp-content\/uploads\/2022\/12\/smart-city-kochi-login-300x298.jpg 300w, https:\/\/www.squareyards.com\/blog\/wp-content\/uploads\/2022\/12\/smart-city-kochi-login-150x150.jpg 150w, https:\/\/www.squareyards.com\/blog\/wp-content\/uploads\/2022\/12\/smart-city-kochi-login-24x24.jpg 24w, https:\/\/www.squareyards.com\/blog\/wp-content\/uploads\/2022\/12\/smart-city-kochi-login-48x48.jpg 48w, https:\/\/www.squareyards.com\/blog\/wp-content\/uploads\/2022\/12\/smart-city-kochi-login-96x96.jpg 96w\" sizes=\"(max-width: 540px) 100vw, 540px\" \/><\/figure>\r\n\r\n\r\n\r\n<ul>\r\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">Tap on the mentioned option.<\/span><\/li>\r\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">A dialogue box will be displayed asking for username and password along with entering the captcha in case of login.\u00a0<\/span><\/li>\r\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">In another case, to register, columns like username, password, email, mobile and full name will be displayed.\u00a0<\/span><\/li>\r\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">Hereby, the concern page will be opened, and the citizen may look out for any types of services or project status or apply a request for their chosen concern easily.\u00a0<\/span><\/li>\r\n<\/ul>\r\n\r\n\r\n\r\n<h2 class=\"wp-block-heading\" id=\"h-kochi-smart-city-citizen-services\">Kochi Smart City: Citizen Services<\/h2>\r\n\r\n\r\n\r\n<p class=\"has-text-align-justify\"><span style=\"font-weight: 400;\">Let us serve the services of Kochi Smart City in which different categories such as e-Payment, G2C and B2C deal with different concerns to upgrade the processing and planning with effectiveness:<\/span><\/p>\r\n\r\n\r\n\r\n<h3 class=\"wp-block-heading\" id=\"h-e-payment-kochi-smart-city-citizen-services\">e-Payment Kochi Smart City Citizen Services<\/h3>\r\n\r\n\r\n\r\n<ul>\r\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">KSEB Electricity Bills<\/span><\/li>\r\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">KWA Water Charges<\/span><\/li>\r\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">Profession Tax<\/span><\/li>\r\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">Property Tax<\/span><\/li>\r\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">Traffic Violation Fees<\/span><\/li>\r\n<\/ul>\r\n\r\n\r\n\r\n<h3 class=\"wp-block-heading\" id=\"h-government-to-citizens-services-g2c\">Government To Citizens Services (G2C)<\/h3>\r\n\r\n\r\n\r\n<ul>\r\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">Birth Certificate<\/span><\/li>\r\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">Death Certificate<\/span><\/li>\r\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">Marriage Certificate<\/span><\/li>\r\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">Trade License<\/span><\/li>\r\n<\/ul>\r\n\r\n\r\n\r\n<h3 class=\"wp-block-heading\" id=\"h-business-to-citizens-services-b2c\">Business to Citizens Services (B2C)<\/h3>\r\n\r\n\r\n\r\n<ul>\r\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">Townhall\u00a0<\/span><\/li>\r\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">Public Bike Sharing<\/span><\/li>\r\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">Septage Cleaning<\/span><\/li>\r\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">108 Ambulance\u00a0<\/span><\/li>\r\n<\/ul>\r\n\r\n\r\n\r\n<h2 class=\"wp-block-heading\" id=\"h-faq-s-about-smart-city-kochi\">FAQ&#8217;s about Smart City Kochi<\/h2>\r\n\r\n\r\n\t\t<section\t\tclass=\"sc_fs_faq sc_card    \"\n\t\t\t\t>\n\t\t\t\t<h3>Q1. Is Kochi on the smart city list?<\/h3>\t\t\t\t<div>\n\t\t\t\t\t\t<div class=\"sc_fs_faq__content\">\n\t\t\t\t\r\n\r\n\r\n<p>Kochi Smart City is listed in the IT or Information Technology that falls as an economic zone of Kerala and is handled by the infrastructural joint venture private firm- Smart City Kochi.<\/p>\r\n\t\t\t<\/div>\n\t\t<\/div>\n\t\t<\/section>\n\t\t\t\t<section\t\tclass=\"sc_fs_faq sc_card    \"\n\t\t\t\t>\n\t\t\t\t<h3>Q2. Why is Kochi called a smart city?<\/h3>\t\t\t\t<div>\n\t\t\t\t\t\t<div class=\"sc_fs_faq__content\">\n\t\t\t\t\r\n\r\n\r\n<p>Smart City Kochi is so called because of its infrastructural qualities, such as the area of 246 acres and coastal line in the south-west that promotes the transportation of goods.<\/p>\r\n\t\t\t<\/div>\n\t\t<\/div>\n\t\t<\/section>\n\t\t\t\t<section\t\tclass=\"sc_fs_faq sc_card    \"\n\t\t\t\t>\n\t\t\t\t<h3>Q3. Is Kochi a metro city?<\/h3>\t\t\t\t<div>\n\t\t\t\t\t\t<div class=\"sc_fs_faq__content\">\n\t\t\t\t\r\n\r\n\r\n<p>Kochi Smart City is a metro city with a 2.1 million population and 440 km sq area coverage.<\/p>\r\n\t\t\t<\/div>\n\t\t<\/div>\n\t\t<\/section>\n\t\t\n<script type=\"application\/ld+json\">\n\t{\n\t\t\"@context\": \"https:\/\/schema.org\",\n\t\t\"@type\": \"FAQPage\",\n\t\t\"mainEntity\": [\n\t\t\t\t\t{\n\t\t\t\t\"@type\": \"Question\",\n\t\t\t\t\"name\": \"Q1. Is Kochi on the smart city list?\",\n\t\t\t\t\"acceptedAnswer\": {\n\t\t\t\t\t\"@type\": \"Answer\",\n\t\t\t\t\t\"text\": \"\r\n\r\n\r\n<p>Kochi Smart City is listed in the IT or Information Technology that falls as an economic zone of Kerala and is handled by the infrastructural joint venture private firm- Smart City Kochi.<\/p>\r\n\"\n\t\t\t\t\t\t\t\t\t}\n\t\t\t}\n\t\t\t,\t\t\t\t{\n\t\t\t\t\"@type\": \"Question\",\n\t\t\t\t\"name\": \"Q2. Why is Kochi called a smart city?\",\n\t\t\t\t\"acceptedAnswer\": {\n\t\t\t\t\t\"@type\": \"Answer\",\n\t\t\t\t\t\"text\": \"\r\n\r\n\r\n<p>Smart City Kochi is so called because of its infrastructural qualities, such as the area of 246 acres and coastal line in the south-west that promotes the transportation of goods.<\/p>\r\n\"\n\t\t\t\t\t\t\t\t\t}\n\t\t\t}\n\t\t\t,\t\t\t\t{\n\t\t\t\t\"@type\": \"Question\",\n\t\t\t\t\"name\": \"Q3. Is Kochi a metro city?\",\n\t\t\t\t\"acceptedAnswer\": {\n\t\t\t\t\t\"@type\": \"Answer\",\n\t\t\t\t\t\"text\": \"\r\n\r\n\r\n<p>Kochi Smart City is a metro city with a 2.1 million population and 440 km sq area coverage.<\/p>\r\n\"\n\t\t\t\t\t\t\t\t\t}\n\t\t\t}\n\t\t\t\t\t\t]\n\t}\n<\/script>\n","protected":false},"excerpt":{"rendered":"<p>An integrated business hub called Smart City Kochi is being marketed by Dubai Holding which is an investment management firm worldwide. It has headquarters in the United Arab Emirates and the Keralan government. SmartCity Kochi would be home to knowledge-based firms that aspire to serve their worldwide clientele from the Indian Subcontinent, creating a network [&hellip;]<\/p>\n","protected":false},"author":66,"featured_media":73599,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[222],"acf":[],"_links":{"self":[{"href":"https:\/\/www.squareyards.com\/blog\/wp-json\/wp\/v2\/posts\/73597"}],"collection":[{"href":"https:\/\/www.squareyards.com\/blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.squareyards.com\/blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.squareyards.com\/blog\/wp-json\/wp\/v2\/users\/66"}],"replies":[{"embeddable":true,"href":"https:\/\/www.squareyards.com\/blog\/wp-json\/wp\/v2\/comments?post=73597"}],"version-history":[{"count":8,"href":"https:\/\/www.squareyards.com\/blog\/wp-json\/wp\/v2\/posts\/73597\/revisions"}],"predecessor-version":[{"id":1031738,"href":"https:\/\/www.squareyards.com\/blog\/wp-json\/wp\/v2\/posts\/73597\/revisions\/1031738"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.squareyards.com\/blog\/wp-json\/wp\/v2\/media\/73599"}],"wp:attachment":[{"href":"https:\/\/www.squareyards.com\/blog\/wp-json\/wp\/v2\/media?parent=73597"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.squareyards.com\/blog\/wp-json\/wp\/v2\/categories?post=73597"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}