residential Ready to Move Source: rera.mh

Bhalchandra Mangal Murti Complex RERA Details - P99000024149, Palghar

View the RERA registration, promoter, approval, building, inventory, document and construction-progress disclosures for Bhalchandra Mangal Murti Complex under registration P99000024149 in Palghar, Maharashtra. Data is sourced from rera.mh.

RERA

RERA Snapshot

The most important statutory project disclosures, generated dynamically from available RERA fields.

  • RERA Number P99000024149
  • Project Name MANGAL MURTI COMPLEX
  • Project Type Residential / Group Housing
  • Project Status Ready to Move
  • State Maharashtra
  • District Palghar
  • Taluka Vasai
  • Original Completion 23 December 2024
  • Revised Completion 31 December 2026
  • Project Area (in Sq.mt.) 2,768.36
  • Total Buildings/Towers 2
  • Documents 14 Verified
Timeline

Project Timeline & Completion Details

Key statutory dates from registration through proposed completion and permit validity.

Proposed Start 23 January 2020 Expected commencement of civil works and foundation on site.
Original Completion 23 December 2024 Mandated date for project handover to the allottees and final compliance filing.
Revised Completion 31 December 2026 No revision filed against the original committed handover date.
Promoter

Promoter, Organisation & Member Details

Declared promoter entity, address and corporate identifiers on file with the authority.

Organisation Type Individual
Location

Land, Address & Location Details

Land parcel, zoning and geo-coordinates as recorded in the project filing.

Address dhFrovmMqIQTqcOlaa/XcS0v0JLI/VkfwZLDgTCWq8cwvuol00aKCYybdm4VX9QV

Understand this Project's RERA details

Get clear answers and additional support from our RERA experts.

RERA Banner
Buildings

Buildings, Towers & Building-Level Details

Statutory building-level disclosures including tower height, sanctioned floors, structural counts and parking areas.

Building Detail
Project Name Name No. of Open Parking No. of Closed Parking No. of Floors No. of Habitable Floor No. of Sanctioned Apartment Wing Name
MANGAL MURTI COMPLEX RESIDENTIAL WITH SHOPLINE BUILDING NO 1 WING A B C D 9 1 9 0 0 NA

Scroll horizontally to view all building-level fields. Values marked "-" were not disclosed in the source RERA record.

Inventory

Unit Inventory & Configuration Details

Configuration mix and floor-level disclosures with both grouped and raw RERA views.

Total Units 392
Configurations 3
Inventory Type RESIDENTIAL
Configuration Distribution
1RK 150 units · avg area 20.08 Sq.mt.
1 BHK 212 units · avg area 29.61 Sq.mt.
2 BHK 30 units · avg area 45.78 Sq.mt.
  • RESIDENTIAL WITH SHOPLINE BUILDING NO 1 WING A B C D
Floor-Wise Inventory Explorer
Apartment Type Carpet Area No. of Apartment No. of Booked Apartment
1RK 16.45 1 0
1RK 16.33 1 0
1RK 18.62 1 0
1RK 18.39 1 1
1RK 18.37 1 1
1RK 18.3 1 1
1RK 17.82 1 1
1RK 17.27 1 0
1RK 17.13 1 0
1BHK 39.1 7 2
1RK 15.88 1 1
1RK 15.72 1 1
1RK 13.19 1 0
1RK 20.67 63 19
1BHK 28.26 14 2
1BHK 28.35 14 1
2BHK 44.88 14 2
1BHK 19.48 6 1
1BHK 33.87 1 1
1BHK 38.91 6 1
1BHK 36.61 7 2
1BHK 35.44 8 1
1BHK 28.24 7 0
1BHK 28.18 7 4
1BHK 27.79 15 2
2BHK 58.42 1 0
1BHK 26.95 7 1
1BHK 23.4 1 1
1BHK 22.72 1 1
1BHK 22.03 1 1
1BHK 20.41 1 1
1BHK 20.16 1 0
1BHK 20.07 1 0
1BHK 19.15 1 1
1RK 0.0 0 0
1RK 16.45 1 0
1RK 16.33 1 0
1RK 18.62 1 0
1RK 18.39 1 1
1RK 18.37 1 1
1RK 18.3 1 1
1RK 17.82 1 1
1RK 17.27 1 0
1RK 17.13 1 0
1BHK 39.1 7 2
1RK 15.88 1 1
1RK 15.72 1 1
1RK 13.19 1 0
1RK 20.67 63 19
1BHK 28.26 14 2
1BHK 28.35 14 1
2BHK 44.88 14 2
1BHK 19.48 6 1
1BHK 33.87 1 1
1BHK 38.91 6 1
1BHK 36.61 7 2
1BHK 35.44 8 1
1BHK 28.24 7 0
1BHK 28.18 7 4
1BHK 27.79 15 2
2BHK 58.42 1 0
1BHK 26.95 7 1
1BHK 23.4 1 1
1BHK 22.72 1 1
1BHK 22.03 1 1
1BHK 20.41 1 1
1BHK 20.16 1 0
1BHK 20.07 1 0
1BHK 19.15 1 1
1RK 0.0 0 0
Development

Development Works & Common Area Disclosures

Project-level common infrastructure disclosures as reported by the developer to the RERA authority.

Internal Roads & Footpaths % not reported Water Supply % not reported Sewerage (Chamber, Lines, Septic Tank , Stp) % not reported
Storm Water Drains % not reported Landscaping & Tree Planting % not reported Street Lighting % not reported
Community Buildings % not reported Treatment And Disposal Of Sewage And Sullage Water % not reported Solid Waste Management And Disposal % not reported
Water Conservation /Rain Water Harvesting % not reported Energy Managemcnt % not reported Fire Protection And Fire Safety Requirements % not reported
Electrical Meter Room, Sub-station, Receiving Station % not reported Aggregate Area Of Recreational Open Space % not reported Open Parking % not reported
Activity

Building Activity Progress

Statutory activity-wise construction progress as declared by the developer, per building/tower.

  • RESIDENTIAL WITH SHOPLINE BUILDING NO 1 WING A B C D
RESIDENTIAL WITH SHOPLINE BUILDING NO 1 WING A B C D · Overall Progress 10%
Stilt Floor
In Progress
% Work1%
Excavation
Complete
% Work100%
Basement (if any)
In Progress
% Work1%
Podiums (if any)
Not Started
% Work0%
Plinth
In Progress
% Work1%
Slabs of Super Structure
In Progress
% Work10%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Not Started
% Work0%
Sanitary Fittings within the flats / premises
Not Started
% Work0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Not Started
% Work0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Not Started
% Work0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Not Started
% Work0%
Excavation
Complete
% Work100%
Basement (if any)
In Progress
% Work1%
Podiums (if any)
Not Started
% Work0%
Plinth
In Progress
% Work1%
Stilt Floor
In Progress
% Work1%
Slabs of Super Structure
In Progress
% Work10%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Not Started
% Work0%
Sanitary Fittings within the flats / premises
Not Started
% Work0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Not Started
% Work0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Not Started
% Work0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Not Started
% Work0%
Documents

RERA Documents & Filings

All statutory documents uploaded by the promoter to the authority portal.

Mh Certificate Pdf
Mh Extension Certificate Pdf
Mh Details Html
1 Sam 0002.Pdf.Pdf
2 14 8 21.Pdf.Pdf
3 14 8 21 1.Pdf.Pdf
4 14 8 21 2.Pdf.Pdf
5 14 8 21 3.Pdf.Pdf
6 Pan.Pdf.Pdf
7 TITLE.Pdf.Pdf
8 Affidavit.Pdf.Pdf
9 6 FORM B.Pdf.Pdf
10 Mangal Murti Complex Sale Agreement Draft Compressed.Pdf.Pdf
11 AGREEEMENT FOR SALE RERA.Pdf.Pdf
Bank

Bank & Cost Disclosure

Declared project cost and the designated escrow account on file.

Project Account Bank BASSEIN CATHOLIC COOPERATIVE BANK LIMITED
IFSC BACB0000034
Branch Address BOLINJ, VIRAR WEST
Country/City