Squareyards Logo
Blogs
Sell or Rent Property
Login
Rera Banner
residential Ready to Move Source: rera.mh

Swastik Epitome RERA Details - P99000006718, Palghar

View the RERA registration, promoter, approval, building, inventory, document and construction-progress disclosures for Swastik Epitome under registration P99000006718 in Palghar, Maharashtra. Data is sourced from rera.mh.

RERA

RERA Snapshot

The most important statutory project disclosures, generated dynamically from available RERA fields.

  • RERA Number P99000006718
  • Project Name Swastik Epitome Building 2 Phase I Ground to 7 floors
  • Project Type Residential / Group Housing
  • Project Status Ready to Move
  • State Maharashtra
  • District Palghar
  • Taluka Vasai
  • Village Vasai-Virar City (M Corp)
  • Original Completion 31 December 2019
  • Revised Completion 30 April 2027
  • Project Area (in Sq.mt.) 3,421.0
  • Total Buildings/Towers 5
  • Documents 17 Verified
Timeline

Project Timeline & Completion Details

Key statutory dates from registration through proposed completion and permit validity.

Proposed Start 16 August 2017 Expected commencement of civil works and foundation on site.
Original Completion 31 December 2019 Mandated date for project handover to the allottees and final compliance filing.
Revised Completion 30 April 2027 No revision filed against the original committed handover date.
Promoter

Promoter, Organisation & Member Details

Declared promoter entity, address and corporate identifiers on file with the authority.

Organisation Type Individual

Promoters, Co-promoters & Members

NameRole
SWASTIK SPACES LIMITEDPartner
HEMANT RAMESH MHATREPartner
Location

Land, Address & Location Details

Land parcel, zoning and geo-coordinates as recorded in the project filing.

Survey Number 185/B/1, 185/B/2, 185/B/3, 185/B/4, 185/B/5 OLD S NO 240,241

Boundary Details

Boundaries East 20 M DP ROAD Boundaries West 12 M DP ROAD
Boundaries South 30 M DP ROAD Boundaries North BUILDING NO 1

RERA Coordinates

Latitude, Longitude 19.455490000000001, 72.804272999999995

Understand this Project's RERA details

Get clear answers and additional support from our RERA experts.

RERA Banner
Buildings

Buildings, Towers & Building-Level Details

Statutory building-level disclosures including tower height, sanctioned floors, structural counts and parking areas.

Building Detail
Project Name Name No. of Open Parking No. of Closed Parking No. of Floors CC Issued No. of Habitable Floor No. of Sanctioned Apartment Wing Name
Swastik Epitome Building 2 Phase I Ground to 7 floors C WING 7 13 10 21 7 28 NA
Swastik Epitome Building 2 Phase I Ground to 7 floors D WING 7 13 10 21 7 42 NA
Swastik Epitome Building 2 Phase I Ground to 7 floors E WING 7 14 10 21 7 28 NA
Swastik Epitome Building 2 Phase I Ground to 7 floors F WING 7 14 10 21 7 42 NA
Swastik Epitome Building 2 Phase I Ground to 7 floors G WING 8 14 10 21 7 42 NA

Scroll horizontally to view all building-level fields. Values marked "-" were not disclosed in the source RERA record.

Inventory

Unit Inventory & Configuration Details

Configuration mix and floor-level disclosures with both grouped and raw RERA views.

Total Units -
Configurations 3
Inventory Type RESIDENTIAL
Configuration Distribution
1 BHK 0 units
2 BHK 0 units
3 BHK 0 units
  • C WING
  • D WING
  • E WING
  • F WING
  • G WING
Floor-Wise Inventory Explorer
Floor Apartment Type Carpet Area No. of Unit Balance Amount Consideration Floor Type Query Raised Residential Received Amount Reckoner Rate Registration Date Status Transaction Mode
Floor 1 2 BHK 49.24 101 ₹0 ₹0 Habitable Floor Clear Residential ₹0 36,00,000 - Unsold None
Floor 1 2 BHK 49.24 102 ₹0 ₹26,68,000 Habitable Floor Clear Residential ₹26,68,000 0 26 Nov 2019 Sold None
Floor 1 1 BHK 38.55 103 ₹0 ₹20,86,000 Habitable Floor Raised Residential ₹20,86,000 0 16 Nov 2019 Sold None
Floor 1 2 BHK 46.41 104 ₹25,40,000 ₹26,40,000 Habitable Floor Clear Residential ₹1,00,000 0 12 Nov 2020 Sold None
Floor 2 2 BHK 49.35 201 ₹31,20,000 ₹32,20,000 Habitable Floor Clear Residential ₹1,00,000 0 18 Oct 2024 Sold None
Floor 2 2 BHK 49.35 202 ₹0 ₹44,90,000 Habitable Floor Raised Residential ₹44,90,000 0 12 Jan 2026 Sold None
Floor 2 1 BHK 38.55 203 ₹0 ₹20,86,000 Habitable Floor Clear Residential ₹20,86,000 0 16 Nov 2019 Sold None
Floor 2 2 BHK 46.41 204 ₹25,40,000 ₹26,40,000 Habitable Floor Clear Residential ₹1,00,000 0 12 Nov 2020 Sold None
Floor 3 2 BHK 49.24 301 ₹29,09,000 ₹29,20,000 Habitable Floor Raised Residential ₹11,000 0 29 Dec 2025 Sold None
Floor 3 2 BHK 49.24 302 ₹0 ₹40,00,000 Habitable Floor Clear Residential ₹40,00,000 0 09 Dec 2021 Sold None
Floor 3 1 BHK 38.55 303 ₹1,13,000 ₹20,86,000 Habitable Floor Clear Residential ₹19,73,000 0 28 Nov 2019 Sold None
Floor 3 2 BHK 46.41 304 ₹24,00,000 ₹25,00,000 Habitable Floor Raised Residential ₹1,00,000 0 06 Jul 2019 Sold None
Floor 4 2 BHK 49.35 401 ₹29,19,000 ₹29,30,000 Habitable Floor Clear Residential ₹11,000 0 29 Dec 2025 Sold None
Floor 4 2 BHK 49.35 402 ₹0 ₹26,72,000 Habitable Floor Clear Residential ₹26,72,000 0 16 Nov 2019 Sold None
Floor 4 1 BHK 38.55 403 ₹4,000 ₹20,90,000 Habitable Floor Raised Residential ₹20,86,000 0 26 Nov 2019 Sold None
Floor 4 2 BHK 46.41 404 ₹0 ₹43,03,600 Habitable Floor Clear Residential ₹43,03,600 0 29 Aug 2016 Sold None
Floor 5 2 BHK 49.24 501 ₹15,55,256 ₹29,25,000 Habitable Floor Clear Residential ₹13,69,744 0 06 Jun 2016 Sold None
Floor 5 2 BHK 49.24 502 ₹0 ₹47,94,405 Habitable Floor Raised Residential ₹47,94,405 0 22 Jun 2018 Sold None
Floor 5 1 BHK 38.55 503 ₹0 ₹35,50,000 Habitable Floor Clear Residential ₹35,50,000 0 15 Feb 2019 Sold None
Floor 5 2 BHK 46.41 504 ₹0 ₹44,00,000 Habitable Floor Clear Residential ₹44,00,000 0 24 Dec 2019 Sold None
Floor 6 2 BHK 49.35 601 ₹0 ₹44,00,000 Habitable Floor Raised Residential ₹44,00,000 0 30 Sep 2022 Sold None
Floor 6 2 BHK 49.35 602 ₹32,40,000 ₹34,90,000 Habitable Floor Clear Residential ₹2,50,000 0 25 Apr 2019 Sold None
Floor 6 1 BHK 38.55 603 ₹0 ₹34,37,400 Habitable Floor Clear Residential ₹34,37,400 0 24 Jan 2018 Sold None
Floor 6 2 BHK 46.41 604 ₹0 ₹56,50,000 Habitable Floor Raised Residential ₹56,50,000 0 10 Oct 2024 Sold None
Floor 7 2 BHK 49.24 701 ₹15,11,506 ₹27,75,000 Habitable Floor Clear Residential ₹12,63,494 0 06 Jun 2016 Sold None
Floor 7 2 BHK 49.24 702 ₹15,11,506 ₹27,75,000 Habitable Floor Clear Residential ₹12,63,494 0 06 Jun 2016 Sold None
Floor 7 1 BHK 38.55 703 ₹0 ₹34,00,000 Habitable Floor Raised Residential ₹34,00,000 0 14 Dec 2018 Sold None
Floor 7 2 BHK 46.41 704 ₹0 ₹35,00,000 Habitable Floor Clear Residential ₹35,00,000 0 27 Jul 2020 Sold None
Development

Development Works & Common Area Disclosures

Project-level common infrastructure disclosures as reported by the developer to the RERA authority.

Internal Roads & Footpaths 90.0% Water Supply 100.0% Sewerage (Chamber, Lines, Septic Tank , Stp) 100.0%
Storm Water Drains 90.0% Landscaping & Tree Planting 50.0% Street Lighting 90.0%
Community Buildings 80.0% Treatment And Disposal Of Sewage And Sullage Water 50.0% Solid Waste Management And Disposal 50.0%
Water Conservation /Rain Water Harvesting 50.0% Energy Managemcnt 50.0% Fire Protection And Fire Safety Requirements 80.0%
Electrical Meter Room, Sub-station, Receiving Station 80.0% Aggregate Area Of Recreational Open Space 80.0% Open Parking 90.0%
Activity

Building Activity Progress

Statutory activity-wise construction progress as declared by the developer, per building/tower.

  • C WING
  • D WING
  • E WING
  • F WING
  • G WING
C WING · Overall Progress 84%
Excavation
Complete
% Work100%
Basement (if any)
Not Started
% Work0%
Podiums (if any)
In Progress
% Work50%
Plinth
Complete
% Work100%
Stilt Floor
Complete
% Work100%
Slabs of Super Structure
Complete
% Work100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
In Progress
% Work95%
Sanitary Fittings within the flats / premises
In Progress
% Work90%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Complete
% Work100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
In Progress
% Work95%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
In Progress
% Work90%
Documents

RERA Documents & Filings

All statutory documents uploaded by the promoter to the authority portal.

Mh Certificate Pdf
Mh Extension Certificate Pdf
Mh Details Html
1 Form 2A (FY 2025 2026).Pdf
2 Form 2A (FY 2024 2025).Pdf
3 Form 2A (FY 2023 2024).Pdf
4 Form 2A (FY 2019 2020).Pdf
5 Form 2A (FY 2021 2022).Pdf
6 Form 2A (FY 2020 2021).Pdf
7 Form 2A (FY 2022 2023).Pdf
8 Form 5 (FY 2023 2024).Pdf
9 Form 5 (FY 2025 2026).Pdf
10 Form 5 (FY 2021 2022).Pdf
11 Form 5 (FY 2022 2023).Pdf
12 Form 5 (FY 2024 2025).Pdf
13 Form 5 (FY 2020 2021).Pdf
14 Form 5 (FY 2019 2020).Pdf
Bank

Bank & Cost Disclosure

Declared project cost and the designated escrow account on file.

Project Account Bank BASSEIN CATHOLIC COOPERATIVE BANK LIMITED
IFSC BACB0000054
Branch Address Shop 1 by 15 Ground Floor Makwana Complex Veer Savarkar Road Chandansar Road Virar East 401 305
Country/City