residential Partially Ready To Move Source: rera.mh

Haware Nakshatra RERA Details - P51700003236, Palghar

View the RERA registration, promoter, approval, building, inventory, document and construction-progress disclosures for Haware Nakshatra under registration P51700003236 in Palghar, Maharashtra. Data is sourced from rera.mh.

RERA

RERA Snapshot

The most important statutory project disclosures, generated dynamically from available RERA fields.

  • RERA Number P51700003236
  • Project Name NAKSHTRA
  • Project Type Residential / Group Housing
  • Project Status Partially Ready To Move
  • State Maharashtra
  • District Thane
  • Taluka Thane
  • Village Thane (M Corp.)
  • Original Completion 30 October 2020
  • Revised Completion 30 October 2020
  • Project Area (in Sq.mt.) 40,000.0
  • Total Buildings/Towers 27
  • Documents 15 Verified
Timeline

Project Timeline & Completion Details

Key statutory dates from registration through proposed completion and permit validity.

Proposed Start 05 August 2017 Expected commencement of civil works and foundation on site.
Original Completion 30 October 2020 Mandated date for project handover to the allottees and final compliance filing.
Revised Completion 30 October 2020 No revision filed against the original committed handover date.
Promoter

Promoter, Organisation & Member Details

Declared promoter entity, address and corporate identifiers on file with the authority.

Organisation Type Company
Individule Name HAWARE ENGINEERS & BUILDERS PRIVATE LIMITED

Understand this Project's RERA details

Get clear answers and additional support from our RERA experts.

RERA Banner
Buildings

Buildings, Towers & Building-Level Details

Statutory building-level disclosures including tower height, sanctioned floors, structural counts and parking areas.

Building Detail
Project Name Name No. of Open Parking No. of Closed Parking No. of Floors No. of Habitable Floor No. of Sanctioned Apartment Wing Name
NAKSHTRA A1 5 9 5 0 0 NA
NAKSHTRA A2 6 5 5 0 0 NA
NAKSHTRA B3 7 0 5 0 0 NA
NAKSHTRA A4 5 5 5 0 0 NA
NAKSHTRA A5 5 9 5 0 0 NA
NAKSHTRA E6 5 10 5 0 0 NA
NAKSHTRA E7 6 6 5 0 0 NA
NAKSHTRA F8 9 0 5 0 0 NA
NAKSHTRA E9 5 6 5 0 0 NA
NAKSHTRA E10 5 10 5 0 0 NA
NAKSHTRA C11 5 0 4 0 0 NA
NAKSHTRA C12 5 0 4 0 0 NA
NAKSHTRA D13 5 11 5 0 0 NA
NAKSHTRA D14 5 11 5 0 0 NA
NAKSHTRA F15 7 0 5 0 0 NA
NAKSHTRA F16 7 0 5 0 0 NA
NAKSHTRA D17 5 11 5 0 0 NA
NAKSHTRA C18 5 0 4 0 0 NA
NAKSHTRA C19 5 0 4 0 0 NA
NAKSHTRA D20 5 11 5 0 0 NA
NAKSHTRA F22 8 0 5 0 0 NA
NAKSHTRA A24 5 9 5 0 0 NA
NAKSHTRA B25 5 6 4 0 0 NA
NAKSHTRA A26 6 9 5 0 0 NA
NAKSHTRA A27 6 9 5 0 0 NA
NAKSHTRA A28 6 9 5 0 0 NA
NAKSHTRA TYPE 1 3 0 2 0 0 NA

Scroll horizontally to view all building-level fields. Values marked "-" were not disclosed in the source RERA record.

Inventory

Unit Inventory & Configuration Details

Configuration mix and floor-level disclosures with both grouped and raw RERA views.

Total Units 691
Configurations 4
Inventory Type RESIDENTIAL
Configuration Distribution
1 BHK 287 units · avg area 608.25 Sq.mt.
1RK 128 units · avg area 682.24 Sq.mt.
2 BHK 252 units · avg area 808.36 Sq.mt.
SHOPS 24 units · avg area 467.44 Sq.mt.
  • A1
  • A2
  • B3
  • A4
  • A5
  • E6
  • E7
  • F8
  • E9
  • E10
  • C11
  • C12
  • D13
  • D14
  • F15
  • F16
  • D17
  • C18
  • C19
  • D20
  • F22
  • A24
  • B25
  • A26
  • A27
  • A28
  • TYPE 1
Floor-Wise Inventory Explorer
Apartment Type Carpet Area No. of Apartment No. of Booked Apartment
2BHK 188.52 4 3
1BHK 708.79 22 19
Development

Development Works & Common Area Disclosures

Project-level common infrastructure disclosures as reported by the developer to the RERA authority.

Internal Roads & Footpaths 100.0% Water Supply 100.0% Sewerage (Chamber, Lines, Septic Tank , Stp) 75.0%
Storm Water Drains 100.0% Landscaping & Tree Planting 100.0% Street Lighting 100.0%
Community Buildings % not reported Treatment And Disposal Of Sewage And Sullage Water 100.0% Solid Waste Management And Disposal 20.0%
Water Conservation /Rain Water Harvesting 100.0% Energy Managemcnt 100.0% Fire Protection And Fire Safety Requirements 100.0%
Electrical Meter Room, Sub-station, Receiving Station 100.0% Aggregate Area Of Recreational Open Space 100.0% Open Parking 100.0%
Swimming Pool 50.0%
Activity

Building Activity Progress

Statutory activity-wise construction progress as declared by the developer, per building/tower.

  • A1
  • A2
  • B3
  • A4
  • A5
  • E6
  • E7
  • F8
  • E9
  • E10
  • C11
  • C12
  • D13
  • D14
  • F15
  • F16
  • D17
  • C18
  • C19
  • D20
  • F22
  • A24
  • B25
  • A26
  • A27
  • A28
  • TYPE 1
A1 · Overall Progress 100%
Excavation
Complete
% Work100%
Basement (if any)
Complete
% Work100%
Podiums (if any)
Complete
% Work100%
Plinth
Complete
% Work100%
Stilt Floor
Complete
% Work100%
Slabs of Super Structure
Complete
% Work100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Complete
% Work100%
Sanitary Fittings within the flats / premises
Complete
% Work100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Complete
% Work100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Complete
% Work100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Complete
% Work100%
Documents

RERA Documents & Filings

All statutory documents uploaded by the promoter to the authority portal.

Mh Certificate Pdf
Mh Details Html
1 1 PAN Card.Pdf
2 1 Copy Of The Legal Title Report.Pdf
3 1 Details Of Encumbrances.Pdf
4 1 Copy Of Layout Approval (In Case Of Layout).Pdf
5 1 Building Plan Approval (IOD).Pdf
6 1 Commencement Certificates NA Order For Plotted Development.Pdf
7 1 Declaration In FORM B.Pdf
8 1 Certificates Of Architect (Form 1)(Mandatory For Only Ongoing Project).Pdf
9 1 Certificates Of Engineer (Form 2)(Mandatory For Only Ongoing Project).Pdf
10 1 Certificates Of CA (Form 3).Pdf
11 1 Certificates Of CA (Form 5).Pdf
12 1 Proforma Of Allotment Letter.Pdf
13 1 Certificates Of Architect (Form 4).Pdf
Bank

Bank & Cost Disclosure

Declared project cost and the designated escrow account on file.

Project Account Bank THE COSMOS CO OPERATIVE BANK LIMITED
IFSC COSB0000029
Branch Address PERSEPOLIS PREMISES CHS, PLOT 74, SECTOR 17, VASHI, NAVI MUMBAI