residential Partially Ready To Move Source: rera.mh

Shambhavi Row Houses RERA Details - P99000025171, Palghar

View the RERA registration, promoter, approval, building, inventory, document and construction-progress disclosures for Shambhavi Row Houses under registration P99000025171 in Palghar, Maharashtra. Data is sourced from rera.mh.

RERA

RERA Snapshot

The most important statutory project disclosures, generated dynamically from available RERA fields.

  • RERA Number P99000025171
  • Project Name SHAMBHAVI ROW HOUSES
  • Project Type Residential / Group Housing
  • Project Status Partially Ready To Move
  • State Maharashtra
  • District Palghar
  • Taluka Dahanu
  • Village Ashagad
  • Original Completion 30 December 2025
  • Revised Completion 30 December 2025
  • Project Area (in Sq.mt.) 3,224.64
  • Total Buildings/Towers 28
  • Documents 9 Verified
Timeline

Project Timeline & Completion Details

Key statutory dates from registration through proposed completion and permit validity.

Proposed Start 20 March 2020 Expected commencement of civil works and foundation on site.
Original Completion 30 December 2025 Mandated date for project handover to the allottees and final compliance filing.
Revised Completion 30 December 2025 No revision filed against the original committed handover date.
Promoter

Promoter, Organisation & Member Details

Declared promoter entity, address and corporate identifiers on file with the authority.

Organisation Type Individual

Understand this Project's RERA details

Get clear answers and additional support from our RERA experts.

RERA Banner
Buildings

Buildings, Towers & Building-Level Details

Statutory building-level disclosures including tower height, sanctioned floors, structural counts and parking areas.

Building Detail
Project Name Name No. of Open Parking No. of Closed Parking No. of Floors No. of Habitable Floor No. of Sanctioned Apartment Wing Name
SHAMBHAVI ROW HOUSES SHAMBHAVI ROW HOUSES 1 0 2 0 0 NA
SHAMBHAVI ROW HOUSES SHAMBHAVI ROW HOUESE 1 0 2 0 0 NA

Scroll horizontally to view all building-level fields. Values marked "-" were not disclosed in the source RERA record.

Inventory

Unit Inventory & Configuration Details

Configuration mix and floor-level disclosures with both grouped and raw RERA views.

Total Units 730
Configurations 1
Inventory Type RESIDENTIAL
Configuration Distribution
2 BHK 730 units · avg area 83.93 Sq.mt.
  • SHAMBHAVI ROW HOUSES
  • SHAMBHAVI ROW HOUESE
Floor-Wise Inventory Explorer
Apartment Type Carpet Area No. of Apartment No. of Booked Apartment
2BHK 85.53 1 1
2BHK 85.53 1 1
2BHK 85.53 1 1
2BHK 85.53 1 1
2BHK 86.04 1 1
2BHK 77.98 1 1
2BHK 77.98 1 1
2BHK 85.53 1 1
2BHK 85.53 1 1
2BHK 85.53 1 1
2BHK 85.53 1 1
2BHK 85.53 1 1
2BHK 69.7 1 1
2BHK 69.7 1 1
2BHK 86.04 1 1
2BHK 86.04 1 1
2BHK 86.04 1 1
2BHK 85.53 1 1
2BHK 85.53 1 1
2BHK 85.53 1 1
2BHK 86.04 1 1
2BHK 85.53 1 1
2BHK 85.53 1 1
2BHK 86.04 1 1
2BHK 86.04 1 1
2BHK 85.53 1 1
2BHK 85.53 1 1
2BHK 85.53 1 1
2BHK 85.53 1 1
2BHK 85.53 1 1
2BHK 85.53 1 1
2BHK 86.04 1 1
2BHK 77.98 1 1
2BHK 77.98 1 1
2BHK 85.53 1 1
2BHK 85.53 1 1
2BHK 85.53 1 1
2BHK 85.53 1 1
2BHK 85.53 1 1
2BHK 69.7 1 1
2BHK 69.7 1 1
2BHK 86.04 1 1
2BHK 86.04 1 1
2BHK 86.04 1 1
2BHK 85.53 1 1
2BHK 85.53 1 1
2BHK 85.53 1 1
2BHK 86.04 1 1
2BHK 85.53 1 1
2BHK 85.53 1 1
2BHK 86.04 1 1
2BHK 86.04 1 1
2BHK 85.53 1 1
2BHK 85.53 1 1
2BHK 85.53 1 1
2BHK 85.53 1 1
2BHK 85.53 1 1
2BHK 85.53 1 1
2BHK 86.04 1 1
2BHK 77.98 1 1
2BHK 77.98 1 1
2BHK 85.53 1 1
2BHK 85.53 1 1
2BHK 85.53 1 1
2BHK 85.53 1 1
2BHK 85.53 1 1
2BHK 69.7 1 1
2BHK 69.7 1 1
2BHK 86.04 1 1
2BHK 86.04 1 1
2BHK 86.04 1 1
2BHK 85.53 1 1
2BHK 85.53 1 1
2BHK 85.53 1 1
2BHK 86.04 1 1
2BHK 85.53 1 1
2BHK 85.53 1 1
2BHK 86.04 1 1
2BHK 86.04 1 1
2BHK 85.53 1 1
2BHK 85.53 1 1
2BHK 85.53 1 1
2BHK 85.53 1 1
2BHK 85.53 1 1
2BHK 85.53 1 1
2BHK 86.04 1 1
2BHK 77.98 1 1
2BHK 77.98 1 1
2BHK 85.53 1 1
2BHK 85.53 1 1
2BHK 85.53 1 1
2BHK 85.53 1 1
2BHK 85.53 1 1
2BHK 69.7 1 1
2BHK 69.7 1 1
2BHK 86.04 1 1
2BHK 86.04 1 1
2BHK 86.04 1 1
2BHK 85.53 1 1
2BHK 85.53 1 1
2BHK 85.53 1 1
2BHK 86.04 1 1
2BHK 85.53 1 1
2BHK 85.53 1 1
2BHK 86.04 1 1
2BHK 86.04 1 1
2BHK 85.53 1 1
2BHK 85.53 1 1
2BHK 85.53 1 1
2BHK 85.53 1 1
2BHK 85.53 1 1
2BHK 85.53 1 1
2BHK 86.04 1 1
2BHK 77.98 1 1
2BHK 77.98 1 1
2BHK 85.53 1 1
2BHK 85.53 1 1
2BHK 85.53 1 1
2BHK 85.53 1 1
2BHK 85.53 1 1
2BHK 69.7 1 1
2BHK 69.7 1 1
2BHK 86.04 1 1
2BHK 86.04 1 1
2BHK 86.04 1 1
2BHK 85.53 1 1
2BHK 85.53 1 1
2BHK 85.53 1 1
2BHK 86.04 1 1
2BHK 85.53 1 1
2BHK 85.53 1 1
2BHK 86.04 1 1
2BHK 86.04 1 1
2BHK 85.53 1 1
2BHK 85.53 1 1
2BHK 85.53 1 1
2BHK 85.53 1 1
2BHK 85.53 1 1
2BHK 85.53 1 1
2BHK 86.04 1 1
2BHK 77.98 1 1
2BHK 77.98 1 1
2BHK 85.53 1 1
2BHK 85.53 1 1
2BHK 85.53 1 1
2BHK 85.53 1 1
2BHK 85.53 1 1
2BHK 69.7 1 1
2BHK 69.7 1 1
2BHK 86.04 1 1
2BHK 86.04 1 1
2BHK 86.04 1 1
2BHK 85.53 1 1
2BHK 85.53 1 1
2BHK 85.53 1 1
2BHK 86.04 1 1
2BHK 85.53 1 1
2BHK 85.53 1 1
2BHK 86.04 1 1
2BHK 86.04 1 1
2BHK 85.53 1 1
2BHK 85.53 1 1
2BHK 85.53 1 1
2BHK 85.53 1 1
2BHK 85.53 1 1
2BHK 85.53 1 1
2BHK 86.04 1 1
2BHK 77.98 1 1
2BHK 77.98 1 1
2BHK 85.53 1 1
2BHK 85.53 1 1
2BHK 85.53 1 1
2BHK 85.53 1 1
2BHK 85.53 1 1
2BHK 69.7 1 1
2BHK 69.7 1 1
2BHK 86.04 1 1
2BHK 86.04 1 1
2BHK 86.04 1 1
2BHK 85.53 1 1
2BHK 85.53 1 1
2BHK 85.53 1 1
2BHK 86.04 1 1
2BHK 85.53 1 1
2BHK 85.53 1 1
2BHK 86.04 1 1
2BHK 86.04 1 1
2BHK 85.53 1 1
2BHK 85.53 1 1
2BHK 85.53 1 1
2BHK 85.53 1 1
2BHK 85.53 1 1
2BHK 85.53 1 1
2BHK 86.04 1 1
2BHK 77.98 1 1
2BHK 77.98 1 1
2BHK 85.53 1 1
2BHK 85.53 1 1
2BHK 85.53 1 1
2BHK 85.53 1 1
2BHK 85.53 1 1
2BHK 69.7 1 1
2BHK 69.7 1 1
2BHK 86.04 1 1
2BHK 86.04 1 1
2BHK 86.04 1 1
2BHK 85.53 1 1
2BHK 85.53 1 1
2BHK 85.53 1 1
2BHK 86.04 1 1
2BHK 85.53 1 1
2BHK 85.53 1 1
2BHK 86.04 1 1
2BHK 86.04 1 1
2BHK 85.53 1 1
2BHK 85.53 1 1
2BHK 85.53 1 1
2BHK 85.53 1 1
2BHK 85.53 1 1
2BHK 85.53 1 1
2BHK 86.04 1 1
2BHK 77.98 1 1
2BHK 77.98 1 1
2BHK 85.53 1 1
2BHK 85.53 1 1
2BHK 85.53 1 1
2BHK 85.53 1 1
2BHK 85.53 1 1
2BHK 69.7 1 1
2BHK 69.7 1 1
2BHK 86.04 1 1
2BHK 86.04 1 1
2BHK 86.04 1 1
2BHK 85.53 1 1
2BHK 85.53 1 1
2BHK 85.53 1 1
2BHK 86.04 1 1
2BHK 85.53 1 1
2BHK 85.53 1 1
2BHK 86.04 1 1
2BHK 86.04 1 1
2BHK 85.53 1 1
2BHK 85.53 1 1
2BHK 85.53 1 1
2BHK 85.53 1 1
2BHK 85.53 1 1
2BHK 85.53 1 1
2BHK 86.04 1 1
2BHK 77.98 1 1
2BHK 77.98 1 1
2BHK 85.53 1 1
2BHK 85.53 1 1
2BHK 85.53 1 1
2BHK 85.53 1 1
2BHK 85.53 1 1
2BHK 69.7 1 1
2BHK 69.7 1 1
2BHK 86.04 1 1
2BHK 86.04 1 1
2BHK 86.04 1 1
2BHK 85.53 1 1
2BHK 85.53 1 1
2BHK 85.53 1 1
2BHK 86.04 1 1
2BHK 85.53 1 1
2BHK 85.53 1 1
2BHK 86.04 1 1
2BHK 86.04 1 1
2BHK 85.53 1 1
2BHK 85.53 1 1
2BHK 85.53 1 1
2BHK 85.53 1 1
2BHK 85.53 1 1
2BHK 85.53 1 1
2BHK 86.04 1 1
2BHK 77.98 1 1
2BHK 77.98 1 1
2BHK 85.53 1 1
2BHK 85.53 1 1
2BHK 85.53 1 1
2BHK 85.53 1 1
2BHK 85.53 1 1
2BHK 69.7 1 1
2BHK 69.7 1 1
2BHK 86.04 1 1
2BHK 86.04 1 1
2BHK 86.04 1 1
2BHK 85.53 1 1
2BHK 85.53 1 1
2BHK 85.53 1 1
2BHK 86.04 1 1
2BHK 85.53 1 1
2BHK 85.53 1 1
2BHK 86.04 1 1
2BHK 86.04 1 1
2BHK 85.53 1 1
2BHK 85.53 1 1
2BHK 85.53 1 1
2BHK 85.53 1 1
2BHK 85.53 1 1
2BHK 85.53 1 1
2BHK 86.04 1 1
2BHK 77.98 1 1
2BHK 77.98 1 1
2BHK 85.53 1 1
2BHK 85.53 1 1
2BHK 85.53 1 1
2BHK 85.53 1 1
2BHK 85.53 1 1
2BHK 69.7 1 1
2BHK 69.7 1 1
2BHK 86.04 1 1
2BHK 86.04 1 1
2BHK 86.04 1 1
2BHK 85.53 1 1
2BHK 85.53 1 1
2BHK 85.53 1 1
2BHK 86.04 1 1
2BHK 85.53 1 1
2BHK 85.53 1 1
2BHK 86.04 1 1
2BHK 86.04 1 1
2BHK 85.53 1 1
2BHK 85.53 1 1
2BHK 85.53 1 1
2BHK 85.53 1 1
2BHK 85.53 1 1
2BHK 85.53 1 1
2BHK 86.04 1 1
2BHK 77.98 1 1
2BHK 77.98 1 1
2BHK 85.53 1 1
2BHK 85.53 1 1
2BHK 85.53 1 1
2BHK 85.53 1 1
2BHK 85.53 1 1
2BHK 69.7 1 1
2BHK 69.7 1 1
2BHK 86.04 1 1
2BHK 86.04 1 1
2BHK 86.04 1 1
2BHK 85.53 1 1
2BHK 85.53 1 1
2BHK 85.53 1 1
2BHK 86.04 1 1
2BHK 85.53 1 1
2BHK 85.53 1 1
2BHK 86.04 1 1
2BHK 86.04 1 1
2BHK 85.53 1 1
2BHK 85.53 1 1
2BHK 85.53 1 1
2BHK 85.53 1 1
2BHK 85.53 1 1
2BHK 85.53 1 1
2BHK 86.04 1 1
2BHK 77.98 1 1
2BHK 77.98 1 1
2BHK 85.53 1 1
2BHK 85.53 1 1
2BHK 85.53 1 1
2BHK 85.53 1 1
2BHK 85.53 1 1
2BHK 69.7 1 1
2BHK 69.7 1 1
2BHK 86.04 1 1
2BHK 86.04 1 1
2BHK 86.04 1 1
2BHK 85.53 1 1
2BHK 85.53 1 1
2BHK 85.53 1 1
2BHK 86.04 1 1
2BHK 85.53 1 1
2BHK 85.53 1 1
2BHK 86.04 1 1
2BHK 86.04 1 1
2BHK 85.53 1 1
2BHK 85.53 1 1
2BHK 85.53 1 1
2BHK 85.53 1 1
2BHK 85.53 1 1
2BHK 85.53 1 1
2BHK 86.04 1 1
2BHK 77.98 1 1
2BHK 77.98 1 1
2BHK 85.53 1 1
2BHK 85.53 1 1
2BHK 85.53 1 1
2BHK 85.53 1 1
2BHK 85.53 1 1
2BHK 69.7 1 1
2BHK 69.7 1 1
2BHK 86.04 1 1
2BHK 86.04 1 1
2BHK 86.04 1 1
2BHK 85.53 1 1
2BHK 85.53 1 1
2BHK 85.53 1 1
2BHK 86.04 1 1
2BHK 85.53 1 1
2BHK 85.53 1 1
2BHK 86.04 1 1
2BHK 86.04 1 1
2BHK 85.53 1 1
2BHK 85.53 1 1
2BHK 85.53 1 1
2BHK 85.53 1 1
2BHK 85.53 1 1
2BHK 85.53 1 1
2BHK 86.04 1 1
2BHK 77.98 1 1
2BHK 77.98 1 1
2BHK 85.53 1 1
2BHK 85.53 1 1
2BHK 85.53 1 1
2BHK 85.53 1 1
2BHK 85.53 1 1
2BHK 69.7 1 1
2BHK 69.7 1 1
2BHK 86.04 1 1
2BHK 86.04 1 1
2BHK 86.04 1 1
2BHK 85.53 1 1
2BHK 85.53 1 1
2BHK 85.53 1 1
2BHK 86.04 1 1
2BHK 85.53 1 1
2BHK 85.53 1 1
2BHK 86.04 1 1
2BHK 86.04 1 1
2BHK 85.53 1 1
2BHK 85.53 1 1
2BHK 85.53 1 1
2BHK 85.53 1 1
2BHK 85.53 1 1
2BHK 85.53 1 1
2BHK 86.04 1 1
2BHK 77.98 1 1
2BHK 77.98 1 1
2BHK 85.53 1 1
2BHK 85.53 1 1
2BHK 85.53 1 1
2BHK 85.53 1 1
2BHK 85.53 1 1
2BHK 69.7 1 1
2BHK 69.7 1 1
2BHK 86.04 1 1
2BHK 86.04 1 1
2BHK 86.04 1 1
2BHK 85.53 1 1
2BHK 85.53 1 1
2BHK 85.53 1 1
2BHK 86.04 1 1
2BHK 85.53 1 1
2BHK 85.53 1 1
2BHK 86.04 1 1
2BHK 86.04 1 1
2BHK 85.53 1 1
2BHK 85.53 1 1
2BHK 85.53 1 1
2BHK 85.53 1 1
2BHK 85.53 1 1
2BHK 85.53 1 1
2BHK 86.04 1 1
2BHK 77.98 1 1
2BHK 77.98 1 1
2BHK 85.53 1 1
2BHK 85.53 1 1
2BHK 85.53 1 1
2BHK 85.53 1 1
2BHK 85.53 1 1
2BHK 69.7 1 1
2BHK 69.7 1 1
2BHK 86.04 1 1
2BHK 86.04 1 1
2BHK 86.04 1 1
2BHK 85.53 1 1
2BHK 85.53 1 1
2BHK 85.53 1 1
2BHK 86.04 1 1
2BHK 85.53 1 1
2BHK 85.53 1 1
2BHK 86.04 1 1
2BHK 86.04 1 1
2BHK 85.53 1 1
2BHK 85.53 1 1
2BHK 85.53 1 1
2BHK 85.53 1 1
2BHK 85.53 1 1
2BHK 85.53 1 1
2BHK 86.04 1 1
2BHK 77.98 1 1
2BHK 77.98 1 1
2BHK 85.53 1 1
2BHK 85.53 1 1
2BHK 85.53 1 1
2BHK 85.53 1 1
2BHK 85.53 1 1
2BHK 69.7 1 1
2BHK 69.7 1 1
2BHK 86.04 1 1
2BHK 86.04 1 1
2BHK 86.04 1 1
2BHK 85.53 1 1
2BHK 85.53 1 1
2BHK 85.53 1 1
2BHK 86.04 1 1
2BHK 85.53 1 1
2BHK 85.53 1 1
2BHK 86.04 1 1
2BHK 86.04 1 1
2BHK 85.53 1 1
2BHK 85.53 1 1
2BHK 85.53 1 1
2BHK 85.53 1 1
2BHK 85.53 1 1
2BHK 85.53 1 1
2BHK 86.04 1 1
2BHK 77.98 1 1
2BHK 77.98 1 1
2BHK 85.53 1 1
2BHK 85.53 1 1
2BHK 85.53 1 1
2BHK 85.53 1 1
2BHK 85.53 1 1
2BHK 69.7 1 1
2BHK 69.7 1 1
2BHK 86.04 1 1
2BHK 86.04 1 1
2BHK 86.04 1 1
2BHK 85.53 1 1
2BHK 85.53 1 1
2BHK 85.53 1 1
2BHK 86.04 1 1
2BHK 85.53 1 1
2BHK 85.53 1 1
2BHK 86.04 1 1
2BHK 86.04 1 1
2BHK 85.53 1 1
2BHK 85.53 1 1
2BHK 85.53 1 1
2BHK 85.53 1 1
2BHK 85.53 1 1
2BHK 85.53 1 1
2BHK 86.04 1 1
2BHK 77.98 1 1
2BHK 77.98 1 1
2BHK 85.53 1 1
2BHK 85.53 1 1
2BHK 85.53 1 1
2BHK 85.53 1 1
2BHK 85.53 1 1
2BHK 69.7 1 1
2BHK 69.7 1 1
2BHK 86.04 1 1
2BHK 86.04 1 1
2BHK 86.04 1 1
2BHK 85.53 1 1
2BHK 85.53 1 1
2BHK 85.53 1 1
2BHK 86.04 1 1
2BHK 85.53 1 1
2BHK 85.53 1 1
2BHK 86.04 1 1
2BHK 86.04 1 1
2BHK 85.53 1 1
2BHK 85.53 1 1
2BHK 85.53 1 1
2BHK 85.53 1 1
2BHK 85.53 1 1
2BHK 85.53 1 1
2BHK 86.04 1 1
2BHK 77.98 1 1
2BHK 77.98 1 1
2BHK 85.53 1 1
2BHK 85.53 1 1
2BHK 85.53 1 1
2BHK 85.53 1 1
2BHK 85.53 1 1
2BHK 69.7 1 1
2BHK 69.7 1 1
2BHK 86.04 1 1
2BHK 86.04 1 1
2BHK 86.04 1 1
2BHK 85.53 1 1
2BHK 85.53 1 1
2BHK 85.53 1 1
2BHK 86.04 1 1
2BHK 85.53 1 1
2BHK 85.53 1 1
2BHK 86.04 1 1
2BHK 86.04 1 1
2BHK 85.53 1 1
2BHK 85.53 1 1
2BHK 85.53 1 1
2BHK 85.53 1 1
2BHK 85.53 1 1
2BHK 85.53 1 1
2BHK 86.04 1 1
2BHK 77.98 1 1
2BHK 77.98 1 1
2BHK 85.53 1 1
2BHK 85.53 1 1
2BHK 85.53 1 1
2BHK 85.53 1 1
2BHK 85.53 1 1
2BHK 69.7 1 1
2BHK 69.7 1 1
2BHK 86.04 1 1
2BHK 86.04 1 1
2BHK 86.04 1 1
2BHK 85.53 1 1
2BHK 85.53 1 1
2BHK 85.53 1 1
2BHK 86.04 1 1
2BHK 85.53 1 1
2BHK 85.53 1 1
2BHK 86.04 1 1
2BHK 86.04 1 1
2BHK 85.53 1 1
2BHK 85.53 1 1
2BHK 85.53 1 1
2BHK 85.53 1 1
2BHK 85.53 1 1
2BHK 85.53 1 1
2BHK 86.04 1 1
2BHK 77.98 1 1
2BHK 77.98 1 1
2BHK 85.53 1 1
2BHK 85.53 1 1
2BHK 85.53 1 1
2BHK 85.53 1 1
2BHK 85.53 1 1
2BHK 69.7 1 1
2BHK 69.7 1 1
2BHK 86.04 1 1
2BHK 86.04 1 1
2BHK 86.04 1 1
2BHK 86.04 1 1
2BHK 85.53 1 1
2BHK 85.53 1 1
2BHK 86.04 1 1
2BHK 85.53 1 1
2BHK 85.53 1 1
2BHK 85.53 1 1
2BHK 86.04 1 1
2BHK 85.53 1 1
2BHK 85.53 1 1
2BHK 86.04 1 1
2BHK 86.04 1 1
2BHK 85.53 1 1
2BHK 85.53 1 1
2BHK 85.53 1 1
2BHK 85.53 1 1
2BHK 85.53 1 1
2BHK 85.53 1 1
2BHK 86.04 1 1
2BHK 77.98 1 1
2BHK 77.98 1 1
2BHK 85.53 1 1
2BHK 85.53 1 1
2BHK 85.53 1 1
2BHK 85.53 1 1
2BHK 85.53 1 1
2BHK 69.7 1 1
2BHK 69.7 1 1
2BHK 86.04 1 1
2BHK 86.04 1 1
2BHK 86.04 1 1
2BHK 85.53 1 1
2BHK 85.53 1 1
2BHK 85.53 1 1
2BHK 86.04 1 1
2BHK 85.53 1 1
2BHK 85.53 1 1
2BHK 86.04 1 1
2BHK 86.04 1 1
2BHK 85.53 1 1
2BHK 85.53 1 1
2BHK 85.53 1 1
2BHK 85.53 1 1
2BHK 85.53 1 1
2BHK 85.53 1 1
2BHK 86.04 1 1
2BHK 77.98 1 1
2BHK 77.98 1 1
2BHK 85.53 1 1
2BHK 85.53 1 1
2BHK 85.53 1 1
2BHK 85.53 1 1
2BHK 85.53 1 1
2BHK 69.7 1 1
2BHK 69.7 1 1
2BHK 86.04 1 1
2BHK 86.04 1 1
2BHK 86.04 1 1
2BHK 85.53 1 1
2BHK 85.53 1 1
2BHK 85.53 1 1
2BHK 86.04 1 1
2BHK 85.53 1 1
2BHK 85.53 1 1
2BHK 86.04 1 1
2BHK 86.04 1 1
2BHK 85.53 1 1
2BHK 85.53 1 1
2BHK 85.53 1 1
2BHK 85.53 1 1
2BHK 85.53 1 1
2BHK 85.53 1 1
2BHK 86.04 1 1
2BHK 77.98 1 1
2BHK 77.98 1 1
2BHK 85.53 1 1
2BHK 85.53 1 1
2BHK 85.53 1 1
2BHK 85.53 1 1
2BHK 85.53 1 1
2BHK 69.7 1 1
2BHK 69.7 1 1
2BHK 86.04 1 1
2BHK 86.04 1 1
2BHK 86.04 1 1
2BHK 85.53 1 1
2BHK 85.53 1 1
2BHK 85.53 1 1
2BHK 86.04 1 1
2BHK 85.53 1 1
2BHK 85.53 1 1
Development

Development Works & Common Area Disclosures

Project-level common infrastructure disclosures as reported by the developer to the RERA authority.

Internal Roads & Footpaths 100.0% Water Supply 100.0% Sewerage (Chamber, Lines, Septic Tank , Stp) 100.0%
Storm Water Drains 100.0% Landscaping & Tree Planting 100.0% Street Lighting 100.0%
Community Buildings % not reported Treatment And Disposal Of Sewage And Sullage Water 100.0% Solid Waste Management And Disposal 100.0%
Water Conservation /Rain Water Harvesting 100.0% Energy Managemcnt % not reported Fire Protection And Fire Safety Requirements % not reported
Electrical Meter Room, Sub-station, Receiving Station 100.0% Aggregate Area Of Recreational Open Space 100.0% Open Parking 100.0%
Activity

Building Activity Progress

Statutory activity-wise construction progress as declared by the developer, per building/tower.

  • SHAMBHAVI ROW HOUSES
  • SHAMBHAVI ROW HOUESE
SHAMBHAVI ROW HOUSES · Overall Progress 82%
Plinth
Complete
% Work100%
Stilt Floor
Not Started
% Work0%
Plinth
Complete
% Work100%
Stilt Floor
Not Started
% Work0%
Plinth
Complete
% Work100%
Stilt Floor
Not Started
% Work0%
Plinth
Complete
% Work100%
Stilt Floor
Not Started
% Work0%
Excavation
Complete
% Work100%
Basement (if any)
Complete
% Work100%
Podiums (if any)
Not Started
% Work0%
Plinth
Complete
% Work100%
Stilt Floor
Not Started
% Work0%
Slabs of Super Structure
Complete
% Work100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Complete
% Work100%
Sanitary Fittings within the flats / premises
Complete
% Work100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Complete
% Work100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Complete
% Work100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Complete
% Work100%
Excavation
Complete
% Work100%
Basement (if any)
Complete
% Work100%
Podiums (if any)
Not Started
% Work0%
Plinth
Complete
% Work100%
Stilt Floor
Not Started
% Work0%
Slabs of Super Structure
Complete
% Work100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Complete
% Work100%
Sanitary Fittings within the flats / premises
Complete
% Work100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Complete
% Work100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Complete
% Work100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Complete
% Work100%
Excavation
Complete
% Work100%
Basement (if any)
Complete
% Work100%
Podiums (if any)
Not Started
% Work0%
Plinth
Complete
% Work100%
Stilt Floor
Not Started
% Work0%
Slabs of Super Structure
Complete
% Work100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Complete
% Work100%
Sanitary Fittings within the flats / premises
Complete
% Work100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Complete
% Work100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Complete
% Work100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Complete
% Work100%
Excavation
Complete
% Work100%
Basement (if any)
Complete
% Work100%
Podiums (if any)
Not Started
% Work0%
Plinth
Complete
% Work100%
Stilt Floor
Not Started
% Work0%
Slabs of Super Structure
Complete
% Work100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Complete
% Work100%
Sanitary Fittings within the flats / premises
Complete
% Work100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Complete
% Work100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Complete
% Work100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Complete
% Work100%
Excavation
Complete
% Work100%
Basement (if any)
Complete
% Work100%
Podiums (if any)
Not Started
% Work0%
Plinth
Complete
% Work100%
Stilt Floor
Not Started
% Work0%
Slabs of Super Structure
Complete
% Work100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Complete
% Work100%
Sanitary Fittings within the flats / premises
Complete
% Work100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Complete
% Work100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Complete
% Work100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Complete
% Work100%
Excavation
Complete
% Work100%
Basement (if any)
Complete
% Work100%
Podiums (if any)
Not Started
% Work0%
Slabs of Super Structure
Complete
% Work100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Complete
% Work100%
Sanitary Fittings within the flats / premises
Complete
% Work100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Complete
% Work100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Complete
% Work100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Complete
% Work100%
Excavation
Complete
% Work100%
Basement (if any)
Complete
% Work100%
Podiums (if any)
Not Started
% Work0%
Plinth
Complete
% Work100%
Stilt Floor
Not Started
% Work0%
Slabs of Super Structure
Complete
% Work100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Complete
% Work100%
Sanitary Fittings within the flats / premises
Complete
% Work100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Complete
% Work100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Complete
% Work100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Complete
% Work100%
Excavation
Complete
% Work100%
Basement (if any)
Complete
% Work100%
Podiums (if any)
Not Started
% Work0%
Plinth
Complete
% Work100%
Stilt Floor
Not Started
% Work0%
Slabs of Super Structure
Complete
% Work100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Complete
% Work100%
Sanitary Fittings within the flats / premises
Complete
% Work100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Complete
% Work100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Complete
% Work100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Complete
% Work100%
Excavation
Complete
% Work100%
Basement (if any)
Complete
% Work100%
Podiums (if any)
Not Started
% Work0%
Plinth
Complete
% Work100%
Stilt Floor
Not Started
% Work0%
Slabs of Super Structure
Complete
% Work100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Complete
% Work100%
Sanitary Fittings within the flats / premises
Complete
% Work100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Complete
% Work100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Complete
% Work100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Complete
% Work100%
Excavation
Complete
% Work100%
Basement (if any)
Complete
% Work100%
Podiums (if any)
Not Started
% Work0%
Plinth
Complete
% Work100%
Stilt Floor
Not Started
% Work0%
Slabs of Super Structure
Complete
% Work100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Complete
% Work100%
Sanitary Fittings within the flats / premises
Complete
% Work100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Complete
% Work100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Complete
% Work100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Complete
% Work100%
Excavation
Complete
% Work100%
Basement (if any)
Complete
% Work100%
Podiums (if any)
Not Started
% Work0%
Plinth
Complete
% Work100%
Stilt Floor
Not Started
% Work0%
Slabs of Super Structure
Complete
% Work100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Complete
% Work100%
Sanitary Fittings within the flats / premises
Complete
% Work100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Complete
% Work100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Complete
% Work100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Complete
% Work100%
Excavation
Complete
% Work100%
Basement (if any)
Complete
% Work100%
Podiums (if any)
Not Started
% Work0%
Slabs of Super Structure
Complete
% Work100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Complete
% Work100%
Sanitary Fittings within the flats / premises
Complete
% Work100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Complete
% Work100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Complete
% Work100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Complete
% Work100%
Excavation
Complete
% Work100%
Basement (if any)
Complete
% Work100%
Podiums (if any)
Not Started
% Work0%
Plinth
Complete
% Work100%
Stilt Floor
Not Started
% Work0%
Slabs of Super Structure
Complete
% Work100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Complete
% Work100%
Sanitary Fittings within the flats / premises
Complete
% Work100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Complete
% Work100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Complete
% Work100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Complete
% Work100%
Excavation
Complete
% Work100%
Basement (if any)
Complete
% Work100%
Podiums (if any)
Not Started
% Work0%
Plinth
Complete
% Work100%
Stilt Floor
Not Started
% Work0%
Slabs of Super Structure
Complete
% Work100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Complete
% Work100%
Sanitary Fittings within the flats / premises
Complete
% Work100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Complete
% Work100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Complete
% Work100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Complete
% Work100%
Excavation
Complete
% Work100%
Basement (if any)
Complete
% Work100%
Podiums (if any)
Not Started
% Work0%
Plinth
Complete
% Work100%
Stilt Floor
Not Started
% Work0%
Slabs of Super Structure
Complete
% Work100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Complete
% Work100%
Sanitary Fittings within the flats / premises
Complete
% Work100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Complete
% Work100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Complete
% Work100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Complete
% Work100%
Excavation
Complete
% Work100%
Basement (if any)
Complete
% Work100%
Podiums (if any)
Not Started
% Work0%
Plinth
Complete
% Work100%
Stilt Floor
Not Started
% Work0%
Slabs of Super Structure
Complete
% Work100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Complete
% Work100%
Sanitary Fittings within the flats / premises
Complete
% Work100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Complete
% Work100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Complete
% Work100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Complete
% Work100%
Excavation
Complete
% Work100%
Basement (if any)
Complete
% Work100%
Podiums (if any)
Not Started
% Work0%
Plinth
Complete
% Work100%
Stilt Floor
Not Started
% Work0%
Slabs of Super Structure
Complete
% Work100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Complete
% Work100%
Sanitary Fittings within the flats / premises
Complete
% Work100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Complete
% Work100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Complete
% Work100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Complete
% Work100%
Excavation
Complete
% Work100%
Basement (if any)
Complete
% Work100%
Podiums (if any)
Not Started
% Work0%
Slabs of Super Structure
Complete
% Work100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Complete
% Work100%
Sanitary Fittings within the flats / premises
Complete
% Work100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Complete
% Work100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Complete
% Work100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Complete
% Work100%
Excavation
Complete
% Work100%
Basement (if any)
Complete
% Work100%
Podiums (if any)
Not Started
% Work0%
Plinth
Complete
% Work100%
Stilt Floor
Not Started
% Work0%
Slabs of Super Structure
Complete
% Work100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Complete
% Work100%
Sanitary Fittings within the flats / premises
Complete
% Work100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Complete
% Work100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Complete
% Work100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Complete
% Work100%
Excavation
Complete
% Work100%
Basement (if any)
Complete
% Work100%
Podiums (if any)
Not Started
% Work0%
Plinth
Complete
% Work100%
Stilt Floor
Not Started
% Work0%
Slabs of Super Structure
Complete
% Work100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Complete
% Work100%
Sanitary Fittings within the flats / premises
Complete
% Work100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Complete
% Work100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Complete
% Work100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Complete
% Work100%
Excavation
Complete
% Work100%
Basement (if any)
Complete
% Work100%
Podiums (if any)
Not Started
% Work0%
Plinth
Complete
% Work100%
Stilt Floor
Not Started
% Work0%
Slabs of Super Structure
Complete
% Work100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Complete
% Work100%
Sanitary Fittings within the flats / premises
Complete
% Work100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Complete
% Work100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Complete
% Work100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Complete
% Work100%
Excavation
Complete
% Work100%
Basement (if any)
Complete
% Work100%
Podiums (if any)
Not Started
% Work0%
Plinth
Complete
% Work100%
Stilt Floor
Not Started
% Work0%
Slabs of Super Structure
Complete
% Work100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Complete
% Work100%
Sanitary Fittings within the flats / premises
Complete
% Work100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Complete
% Work100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Complete
% Work100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Complete
% Work100%
Excavation
Complete
% Work100%
Basement (if any)
Complete
% Work100%
Podiums (if any)
Not Started
% Work0%
Plinth
Complete
% Work100%
Stilt Floor
Not Started
% Work0%
Slabs of Super Structure
Complete
% Work100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Complete
% Work100%
Sanitary Fittings within the flats / premises
Complete
% Work100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Complete
% Work100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Complete
% Work100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Complete
% Work100%
Excavation
Complete
% Work100%
Basement (if any)
Complete
% Work100%
Podiums (if any)
Not Started
% Work0%
Slabs of Super Structure
Complete
% Work100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Complete
% Work100%
Sanitary Fittings within the flats / premises
Complete
% Work100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Complete
% Work100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Complete
% Work100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Complete
% Work100%
Excavation
Complete
% Work100%
Basement (if any)
Complete
% Work100%
Podiums (if any)
Not Started
% Work0%
Plinth
Complete
% Work100%
Stilt Floor
Not Started
% Work0%
Slabs of Super Structure
Complete
% Work100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Complete
% Work100%
Sanitary Fittings within the flats / premises
Complete
% Work100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Complete
% Work100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Complete
% Work100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Complete
% Work100%
Excavation
Complete
% Work100%
Basement (if any)
Complete
% Work100%
Podiums (if any)
Not Started
% Work0%
Plinth
Complete
% Work100%
Stilt Floor
Not Started
% Work0%
Slabs of Super Structure
Complete
% Work100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Complete
% Work100%
Sanitary Fittings within the flats / premises
Complete
% Work100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Complete
% Work100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Complete
% Work100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Complete
% Work100%
Excavation
Complete
% Work100%
Basement (if any)
Complete
% Work100%
Podiums (if any)
Not Started
% Work0%
Plinth
Complete
% Work100%
Stilt Floor
Not Started
% Work0%
Slabs of Super Structure
Complete
% Work100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Complete
% Work100%
Sanitary Fittings within the flats / premises
Complete
% Work100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Complete
% Work100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Complete
% Work100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Complete
% Work100%
Documents

RERA Documents & Filings

All statutory documents uploaded by the promoter to the authority portal.

Mh Certificate Pdf
Mh Details Html
1 Plan.Pdf.Pdf
2 NA Order.Pdf.Pdf
3 JBJ PAN.Pdf.Pdf
4 Area Statment.Pdf.Pdf
5 Search Report Cum Title Certificate Compressed.Pdf.Pdf
6 Form B Row House.Pdf.Pdf
7 Shambhavi Row Houses Draft Agreement 140302020.Pdf.Pdf
Bank

Bank & Cost Disclosure

Declared project cost and the designated escrow account on file.

Project Account Bank ICICI BANK LIMITED
IFSC ICIC0000049
Branch Address VAIBHAV COMPLEX FIRST FLOOR O WING IRANI ROAD DAHANU WEST
Country/City