RERA Snapshot
The most important statutory project disclosures, generated dynamically from available RERA fields.
- RERA Number UPRERAPRJ8267
- Project Name Supertech Upcountry (Plotted)
- Project Type Residential
- Project Status Ready to Move
- State Uttar Pradesh
- District Gautam Buddha Nagar
- Taluka Gautam Buddha Nagar
- Authority Yamuna Expressway Authority
- Original Completion 30 December 2017
- Revised Completion 30 December 2017
- Project Area (in Sq.mt.) 88,361
- Documents 15 Verified
Project Timeline & Completion Details
Key statutory dates from registration through proposed completion and permit validity.
Promoter, Organisation & Member Details
Declared promoter entity, address and corporate identifiers on file with the authority.
Primary Promoter
SUPERTECH LIMITED CompanyLand, Address & Location Details
Land parcel, zoning and geo-coordinates as recorded in the project filing.
RERA Coordinates |
|
| Latitude, Longitude 28.371560, 77.546493 | |
Plans & Approvals
Statutory approvals obtained or pending against the project site.
| Permit Number | BP-69/16784/2017 |
|---|---|
| Permit Date | 21 February 2017 |
| Valid Upto | 12 August 2017 |
| Extendable Upto | 20 February 2027 |
Approval Documents
Development Works & Common Area Disclosures
Project-level common infrastructure disclosures as reported by the developer to the RERA authority.
| Demarcation Of Plots % not reported | Boundary Wall % not reported | Road Work % not reported |
| Footpaths % not reported | Water Supply Including Drinking Water Facilities % not reported | Sewer System % not reported |
| Drain % not reported | Parks % not reported | Tree Planting % not reported |
| Design For Electric Supply Including Street Lighting % not reported | Community Buildings % not reported | Treatment And Disposal System Of Sewage And Sullage Water % not reported |
| Solid Waste Management And Disposal System % not reported | Water Conservation System % not reported | Energy Management System Including Use Of Renewable Energy % not reported |
| Fire Protection And Fire Safety System % not reported | Social Infrastructure And Other Public Amenities Including Public Health Services % not reported | Emergency Evacuation Services % not reported |
| Other Miscellaneous Work % not reported |
RERA Documents & Filings
All statutory documents uploaded by the promoter to the authority portal.
Bank & Cost Disclosure
Declared project cost and the designated escrow account on file.
| Project Cost (in Lacs) | ₹ 3,817 |
|---|---|
| Registration Fee | ₹ 4.47 L |
| Project Account Bank | HDFC BANK LIMITED |
| Account Number (RERA) | 05902320000031 |
| IFSC | HDFC0000590 |
| Branch | HDFC BANK LIMITED INDIRAPURAM GHAZIABAD |
| Branch Address | HDFC BANK LIMITED G-2& 3, WINDOR PARK 5 VAIBHAV KHAND INDIRAPURAM GHAZIABAD |