Squareyards Logo
Blogs
Download App Sell or Rent Property
Login
Rera Banner
residential Under Construction Source: rera.up

Dreamz Aishwarya Height RERA Details - UPRERAPRJ15928, Lucknow

View the RERA registration, promoter, approval, building, inventory, document and construction-progress disclosures for Dreamz Aishwarya Height under registration UPRERAPRJ15928 in Lucknow, Uttar Pradesh. Data is sourced from rera.up.

RERA

RERA Snapshot

The most important statutory project disclosures, generated dynamically from available RERA fields.

  • RERA Number UPRERAPRJ15928
  • Project Name DREAMZ AISHWARYA HEIGHTS
  • Project Type Residential
  • Project Status Under Construction
  • State Uttar Pradesh
  • District Lucknow
  • Taluka Sarojini Nagar
  • Authority Lucknow Industrial Development Authority
  • Original Completion 20 September 2023
  • Revised Completion 01 May 2023
  • Project Area (in Sq.mt.) 5,768
  • Documents 83 Verified
Timeline

Project Timeline & Completion Details

Key statutory dates from registration through proposed completion and permit validity.

Proposed Start 01 July 2018 Expected commencement of civil works and foundation on site.
Original Completion 20 September 2023 Mandated date for project handover to the allottees and final compliance filing.
Revised Completion 01 May 2023 No revision filed against the original committed handover date.
Project Duration
63 months
Promoter

Promoter, Organisation & Member Details

Declared promoter entity, address and corporate identifiers on file with the authority.

Primary Promoter

DREAMZ INFRAREALTY PRIVATE LIMITED Company
Promoter Type Company
Contact 9565455559
Email srivastava.ashwani@gmail.com
Registered Address 3rd Floor, Sai Tower, C73, Vibhuti Khand, Gomti Nagar, Lucknow
Location

Land, Address & Location Details

Land parcel, zoning and geo-coordinates as recorded in the project filing.

Land Type Khasra Plot No. 26 s
Land Area (in Sq.mt.) 3,920
Land Type Khasra Plot No. 26
Land Area (in Sq.mt.) 7,750
Land Type Khasra Plot No. 1282
Land Area (in Sq.mt.) 5,800

RERA Coordinates

Latitude, Longitude 26.6829050, 80.9011219
Plans

Plans & Approvals

Statutory approvals obtained or pending against the project site.

Permit Number 764
Permit Date 23 March 2018
Valid Upto 22 March 2023
Extendable Upto 22 March 2028

Approval Documents

Approved Layout PDF
Sanctioned Letter PDF
Approved Map PDF
Floor Plan PDF
Project Specifications PDF

Understand this Project's RERA details

Get clear answers and additional support from our RERA experts.

RERA Banner
Inventory

Unit Inventory & Configuration Details

Configuration mix and floor-level disclosures with both grouped and raw RERA views.

Total Units 114
Configurations 4
Inventory Type RESIDENTIAL
Configuration Distribution
1 BHK 9 units · avg area 31.04 Sq.mt.
2 BHK 90 units · avg area 61.81 Sq.mt.
SHOP 6 units · avg area 9.41 Sq.mt.
OTHER 9 units · avg area 22.34 Sq.mt.
  • samridhhi
  • EWS
  • LIG
Floor-Wise Inventory Explorer
Floor Apartment Type Carpet Area No. of Apartment No. of Balcony No. of Verandah Balcony Area Verandah Area
GF 2 BHK 60.66 2 3 0 6.93 0
GF 2 BHK 59.90 2 3 0 8.55 0
GF 2 BHK 63.53 2 4 0 11.67 0
GF 2 BHK 62.99 2 2 0 7.91 0
1 2 BHK 60.66 2 3 0 6.93 0
1 2 BHK 59.90 2 3 0 8.55 0
1 2 BHK 63.53 2 4 0 11.67 0
1 2 BHK 62.99 2 2 0 7.91 0
2 2 BHK 60.66 2 3 0 6.93 0
2 2 BHK 59.90 2 3 0 8.55 0
2 2 BHK 63.53 2 4 0 11.67 0
2 2 BHK 62.99 2 2 0 7.91 0
3 2 BHK 60.66 2 3 0 6.93 0
3 2 BHK 59.90 2 3 0 8.55 0
3 2 BHK 63.53 2 4 0 11.67 0
3 2 BHK 62.99 2 2 0 7.91 0
4 2 BHK 60.66 2 3 0 6.93 0
4 2 BHK 59.90 2 3 0 8.55 0
4 2 BHK 63.53 2 4 0 11.67 0
4 2 BHK 62.99 2 2 0 7.91 0
5 2 BHK 60.66 2 3 0 6.93 0
5 2 BHK 59.90 2 3 0 8.55 0
5 2 BHK 63.53 2 4 0 11.67 0
5 2 BHK 62.99 2 2 0 7.91 0
6 2 BHK 60.66 2 3 0 6.93 0
6 2 BHK 59.90 2 3 0 8.55 0
6 2 BHK 63.53 2 4 0 11.67 0
6 2 BHK 62.99 2 2 0 7.91 0
7 2 BHK 59.90 2 3 0 8.55 0
7 2 BHK 60.66 2 3 0 6.93 0
7 2 BHK 63.53 2 4 0 11.67 0
7 2 BHK 62.99 2 2 0 7.91 0
8 2 BHK 59.90 2 3 0 8.55 0
8 2 BHK 60.66 2 3 0 6.93 0
8 2 BHK 63.53 2 4 0 11.67 0
8 2 BHK 62.99 2 2 0 7.91 0
9 2 BHK 59.90 2 3 0 8.55 0
9 2 BHK 60.66 2 3 0 6.93 0
9 2 BHK 63.53 2 4 0 11.67 0
9 2 BHK 62.99 2 2 0 7.91 0
10 2 BHK 59.90 2 3 0 8.55 0
10 2 BHK 60.66 2 3 0 6.93 0
10 2 BHK 63.53 2 4 0 11.67 0
10 2 BHK 62.99 2 2 0 7.91 0
11 2 BHK 63.53 2 4 0 11.67 0
GF SHOP 19.54 2 0 0 0 0
GF SHOP 4.35 4 0 0 0 0
Development

Development Works & Common Area Disclosures

Project-level common infrastructure disclosures as reported by the developer to the RERA authority.

Demarcation Of Plots % not reported Boundary Wall % not reported Road Work % not reported
Footpaths % not reported Water Supply Including Drinking Water Facilities % not reported Sewer System % not reported
Drain % not reported Parks % not reported Tree Planting % not reported
Design For Electric Supply Including Street Lighting % not reported Community Buildings % not reported Treatment And Disposal System Of Sewage And Sullage Water % not reported
Solid Waste Management And Disposal System % not reported Water Conservation System % not reported Energy Management System Including Use Of Renewable Energy % not reported
Fire Protection And Fire Safety System % not reported Social Infrastructure And Other Public Amenities Including Public Health Services % not reported Emergency Evacuation Services % not reported
Other Miscellaneous Work % not reported
Documents

RERA Documents & Filings

All statutory documents uploaded by the promoter to the authority portal.

Ca Certificate PDF· 01-04-2020 To 30-06-2020
Architect Certificate PDF· 01-04-2020 To 30-06-2020
Engineer Certificate PDF· 01-04-2020 To 30-06-2020
Ca Certificate PDF· 01-07-2020 To 30-09-2020
Architect Certificate PDF· 01-07-2020 To 30-09-2020
Engineer Certificate PDF· 01-07-2020 To 30-09-2020
Ca Certificate PDF· 01-10-2020 To 31-12-2020
Architect Certificate PDF· 01-10-2020 To 31-12-2020
Engineer Certificate PDF· 01-10-2020 To 31-12-2020
Ca Certificate PDF· 01-01-2021 To 31-03-2021
Architect Certificate PDF· 01-01-2021 To 31-03-2021
Engineer Certificate PDF· 01-01-2021 To 31-03-2021
Ca Certificate PDF· 01-04-2021 To 30-06-2021
Architect Certificate PDF· 01-04-2021 To 30-06-2021
Engineer Certificate PDF· 01-04-2021 To 30-06-2021
Ca Certificate PDF· 01-07-2021 To 30-09-2021
Architect Certificate PDF· 01-07-2021 To 30-09-2021
Engineer Certificate PDF· 01-07-2021 To 30-09-2021
Ca Certificate PDF· 01-10-2021 To 31-12-2021
Architect Certificate PDF· 01-10-2021 To 31-12-2021
Engineer Certificate PDF· 01-10-2021 To 31-12-2021
Ca Certificate PDF· 01-01-2022 To 31-03-2022
Architect Certificate PDF· 01-01-2022 To 31-03-2022
Engineer Certificate PDF· 01-01-2022 To 31-03-2022
Ca Certificate PDF· 01-04-2022 To 30-06-2022
Architect Certificate PDF· 01-04-2022 To 30-06-2022
Engineer Certificate PDF· 01-04-2022 To 30-06-2022
Ca Certificate PDF· 01-07-2022 To 30-09-2022
Architect Certificate PDF· 01-07-2022 To 30-09-2022
Engineer Certificate PDF· 01-07-2022 To 30-09-2022
Ca Certificate PDF· 01-10-2022 To 31-12-2022
Architect Certificate PDF· 01-10-2022 To 31-12-2022
Engineer Certificate PDF· 01-10-2022 To 31-12-2022
Ca Certificate PDF· 01-01-2023 To 31-03-2023
Architect Certificate PDF· 01-01-2023 To 31-03-2023
Engineer Certificate PDF· 01-01-2023 To 31-03-2023
Ca Certificate PDF· 01-04-2023 To 30-06-2023
Architect Certificate PDF· 01-04-2023 To 30-06-2023
Engineer Certificate PDF· 01-04-2023 To 30-06-2023
Ca Certificate PDF· 01-07-2023 To 30-09-2023
Architect Certificate PDF· 01-07-2023 To 30-09-2023
Engineer Certificate PDF· 01-07-2023 To 30-09-2023
Dd 1 Extract Of Khatauni
Dd 2 Extract Of Khatauni
Dd 3 Extract Of Khatauni
Du 1 Commencement Certificate
Du 2 Other Plan(If Any)
Du 3 Proforma Of Application Form
Du 4 Proforma Of Allotment Letter
Du 5 Proforma Of Conveyance Deed
Du 6 Proforma Of Completion Certificate(Occupancy)
Du 7 Waste Disposal Plan
Du 8 Water Supply Plan
Du 9 Electricity Supply Plan
Du 10 Development Work Plan
Du 11 Affidavit (Form-B)
Du 12 CA CERTIFICATE
Du 13 ARCHITECT CERTIFICATE
Du 14 ENGINEERS CERTIFICATE
Du 15 Legal Document Of Agreement In Case Of Other Land
Du 16 Legal Document Of Agreement In Case Of Other Land
Du 17 Legal Document Of Agreement In Case Of Other Land
Du 18 Authentic Copy Of Approval Of Project
Du 19 Commencement Certificate
Du 20 Floor Plans Of All Types
Du 21 Floor Plans Of All Types
Du 22 Floor Plans Of All Types
Du 23 Floor Plans Of All Types
Du 24 Floor Plans Of All Types
Du 25 Floor Plans Of All Types
Du 26 Floor Plans Of All Types
Du 27 Floor Plans Of All Types
Du 28 Floor Plans Of All Types
Du 29 Proforma Of Application Form
Du 30 Proforma Of Allotment Letter
Du 31 Waste Disposal Plan
Du 32 Water Supply Plan
Du 33 Development Work Plan
Du 34 Development Work Plan
Du 35 Affidavit (Form-B)
Du 36 Sanctioned Layout Plan (Of Entire Project)
Du 37 Sanctioned Building Block Plan (Add Plans For All Buildings Or Blocks)
Du 38 Sanctioned Building Block Plan (Add Plans For All Buildings Or Blocks)
Bank

Bank & Cost Disclosure

Declared project cost and the designated escrow account on file.

Project Cost (in Lacs) ₹ 1,454
Registration Fee ₹ 34,000
Project Account Bank ICICI
Account Number (RERA) 059105002314
IFSC ICIC0000591
Branch INDRANAGAR
Branch Address 19/753 RING ROAD INDIRA NAGAR LUCKNOW
Country/City