RERA

RERA Snapshot

The most important statutory project disclosures, generated dynamically from available RERA fields.

  • RERA Number P51700077484
  • Project Name DOSTI WEST COUNTY - PHASE 5 - DOSTI OLIVE - WING A
  • Project Type Residential / Group Housing
  • Project Status Under Construction
  • State Maharashtra
  • District Thane
  • Taluka Thane
  • Village Thane (M Corp.)
  • Original Completion 30 September 2028
  • Revised Completion 30 September 2028
  • Project Area (in Sq.mt.) 702.96
  • Total Buildings/Towers 1
  • Documents 58 Verified
Timeline

Project Timeline & Completion Details

Key statutory dates from registration through proposed completion and permit validity.

Proposed Start 20 August 2024 Expected commencement of civil works and foundation on site.
Original Completion 30 September 2028 Mandated date for project handover to the allottees and final compliance filing.
Revised Completion 30 September 2028 No revision filed against the original committed handover date.
Promoter

Promoter, Organisation & Member Details

Declared promoter entity, address and corporate identifiers on file with the authority.

Organisation Type Others
Individule Name DOSTI ENTERPRISES
Experience Details
Project NameAddressLand AreaProject StatusType of ProjectBuild Plot CountApartment countProposed Completion DateProject End DateLitigation PresentLitigation Details
DOSTI WEST COUNTY - DOSTI OAKBalkum Thane1854.02CompletedResidential / Group Housing16882022-06-302021-09-30NoNA
DOSTI WEST COUNTY - PHASE 2 - DOSTI CEDARBalkum Thane18413CompletedResidential / Group Housing13162023-12-302023-02-09NoNA

Promoters, Co-promoters & Members

NameAddress
DOSTI REALTY LIMITEDMumbai City, MAHARASHTRA
SURAKSHA REALTY LIMITEDMumbai Suburban, MAHARASHTRA
MACKINON ENTERPRISES PVT LTDMumbai Suburban, MAHARASHTRA

Understand this Project's RERA details

Get clear answers and additional support from our RERA experts.

RERA Banner
Buildings

Buildings, Towers & Building-Level Details

Statutory building-level disclosures including tower height, sanctioned floors, structural counts and parking areas.

Building Detail
Project Name Name No. of Open Parking No. of Closed Parking No. of Floors CC Issued No. of Habitable Floor No. of Sanctioned Apartment Wing Name
DOSTI WEST COUNTY - PHASE 5 - DOSTI OLIVE - WING A Dosti Olive - Wing A / Building No 9 0 258 35 33 33 198 NA

Scroll horizontally to view all building-level fields. Values marked "-" were not disclosed in the source RERA record.

Inventory

Unit Inventory & Configuration Details

Configuration mix and floor-level disclosures with both grouped and raw RERA views.

Total Units 198
Configurations 3
Inventory Type RESIDENTIAL
Configuration Distribution
2 BHK 126 units · avg area 61.55 Sq.mt.
3 BHK 66 units · avg area 88.10 Sq.mt.
Shop 6 units · avg area 69.32 Sq.mt.
  • Dosti Olive - Wing A / Building No 9
Floor-Wise Inventory Explorer
Apartment Type Carpet Area No. of Apartment No. of Booked Apartment
Shop 51.51 1 0
Shop 51.55 1 1
Shop 68.14 1 0
Shop 74.02 1 0
Shop 84.22 1 0
Shop 86.46 1 0
2BHK 52.94 27 4
2BHK 58.88 33 18
2BHK 65.35 33 13
2BHK 67.47 33 12
3BHK 84.69 33 8
3BHK 91.51 33 3
Development

Development Works & Common Area Disclosures

Project-level common infrastructure disclosures as reported by the developer to the RERA authority.

Internal Roads & Footpaths % not reported Water Supply 50.0% Sewerage (Chamber, Lines, Septic Tank , Stp) 60.0%
Storm Water Drains 50.0% Landscaping & Tree Planting 100.0% Street Lighting % not reported
Community Buildings % not reported Treatment And Disposal Of Sewage And Sullage Water % not reported Solid Waste Management And Disposal % not reported
Water Conservation /Rain Water Harvesting 50.0% Energy Managemcnt % not reported Fire Protection And Fire Safety Requirements % not reported
Electrical Meter Room, Sub-station, Receiving Station 50.0% Aggregate Area Of Recreational Open Space 100.0% Open Parking % not reported
Activity

Building Activity Progress

Statutory activity-wise construction progress as declared by the developer, per building/tower.

  • Dosti Olive - Wing A / Building No 9
Dosti Olive - Wing A / Building No 9 · Overall Progress 67%
Excavation
Complete
% Work100%
Basement (if any)
Complete
% Work100%
Podiums (if any)
Complete
% Work100%
Plinth
Complete
% Work100%
Stilt Floor
Complete
% Work100%
Slabs of Super Structure
Complete
% Work100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
In Progress
% Work30%
Sanitary Fittings within the flats / premises
In Progress
% Work36%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
In Progress
% Work70%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Not Started
% Work0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
In Progress
% Work1%
Documents

RERA Documents & Filings

All statutory documents uploaded by the promoter to the authority portal.

Mh Certificate Pdf
Mh Details Html
1 1 PAN Card.Pdf
2 1 Copy Of The Legal Title Report.Pdf
3 1 A Details Of Encumbrances Concerned To Finance.Pdf
4 1 B Details Of Encumbrances Concerned To Legal.Pdf
5 1 Copy Of Layout Approval (In Case Of Layout).Pdf
6 1 Building Plan Approval NA Order For Plotted Development.Pdf
7 1 Commencement Certificates NA Order For Plotted Development.Pdf
8 1 Declaration About Commencement Certificate.Pdf
9 1 Declaration In FORM B.Pdf
10 1 Architect’S Certificate Of Percentage Of Completion Of Work (Form 1).Pdf
11 1 Engineer’S Certificate On Cost Incurred On Project (Form 2).Pdf
12 1 Engineers Certificate On Quality Assurance (Form 2A FY 2023 24).Pdf
13 1 CERSAI Details.Pdf
14 1 Disclosure For Secured Unsecured Finance Availed For The Project.Pdf
15 1 CA Certificate On Project Cost & Fund Withdrawal (Form 3).Pdf
16 1 Disclosure Of Interest In Other Real Estate Organizations.Pdf
17 2 Disclosure Of Interest In Other Real Estate Organizations.Pdf
18 3 Disclosure Of Interest In Other Real Estate Organizations.Pdf
19 4 Disclosure Of Interest In Other Real Estate Organizations.Pdf
20 5 Disclosure Of Interest In Other Real Estate Organizations.Pdf
21 6 Disclosure Of Interest In Other Real Estate Organizations.Pdf
22 1 Proforma Of Allotment Letter.Pdf
23 1 Proforma Of Agreement For Sale.Pdf
24 1 Declaration About All RERA Designated Bank Accounts (Format A).Pdf
25 1 Letter From The Bank Regarding The Opening Of RERA Designated Bank Accounts (Format B).Pdf
26 1 Deviation Report With Respect To Allotment Letter.Pdf
27 1 Deviation Report With Respect To Model Copy Of Agreement.Pdf
28 1 Other – Legal.Pdf
29 2 Other – Legal.Pdf
30 3 Other – Legal.Pdf
31 4 Other – Legal.Pdf
32 5 Other – Legal.Pdf
33 6 Other – Legal.Pdf
34 7 Other – Legal.Pdf
35 8 Other – Legal.Pdf
36 9 Other – Legal.Pdf
37 10 Other – Legal.Pdf
38 11 Other – Legal.Pdf
39 12 Other – Legal.Pdf
40 13 Other – Legal.Pdf
41 14 Other – Legal.Pdf
42 1 Other – Technical.Pdf
43 2 Other – Technical.Pdf
45 2 Architect’S Certificate Of Percentage Of Completion Of Work (Form 1).Pdf
47 2 CA Certificate On Project Cost & Fund Withdrawal (Form 3).Pdf
49 2 Engineer’S Certificate On Cost Incurred On Project (Form 2).Pdf
50 1 Disclosure Of Sold Booked Inventory.Pdf
51 2 Disclosure Of Sold Booked Inventory.Pdf
57 Form 1.Pdf
58 Form 2.Pdf
59 Form 3.Pdf
60 Disclosure Of Sold And Booked Inventory.Pdf
61 Withdrawal Update Form 1.Pdf
64 Withdrawal Update Form 2.Pdf
67 Withdrawal Update Form 3.Pdf
70 Form 5 (FY 2024 2025).Pdf
Bank

Bank & Cost Disclosure

Declared project cost and the designated escrow account on file.

Project Account Bank KOTAK MAHINDRA BANK LIMITED
IFSC KKBK0000957
Branch Address GROUND AND MEZZANINE FLOOR BOTAWAL CHAMBERS, 2 SIR P.M. ROAD , FORT , MUMBAI 400 001
Country/City