RERA Snapshot
The most important statutory project disclosures, generated dynamically from available RERA fields.
- RERA Number UPRERAPRJ941355
- Project Name GAUR AERO HEIGHTS (POCKET-2)
- Project Type Residential
- Project Status Under Construction
- State Uttar Pradesh
- District Ghaziabad
- Taluka Ghaziabad
- Authority U.P. Awas Evam Vikas Parishad
- Original Completion 27 April 2027
- Revised Completion 27 April 2027
- Project Area (in Sq.mt.) 7,652
- Documents 64 Verified
Project Timeline & Completion Details
Key statutory dates from registration through proposed completion and permit validity.
Promoter, Organisation & Member Details
Declared promoter entity, address and corporate identifiers on file with the authority.
Primary Promoter
UP TOWNSHIP INFRASTRUCTURE PRIVATE LIMITED CompanyLand, Address & Location Details
Land parcel, zoning and geo-coordinates as recorded in the project filing.
| Land Type Plot | Plot No. Pocket-2, Land and Development Grahthan Yojana (Ajantapuram) Loni Road Ghaziabad UP |
| Land Area (in Sq.mt.) 7,652.18 |
RERA Coordinates |
|
| Latitude, Longitude 28.701034, 77.342197 | |
Plans & Approvals
Statutory approvals obtained or pending against the project site.
| Permit Number | 961/VN-5/OFFLINE/134/PART-VI |
|---|---|
| Permit Date | 28 April 2022 |
| Valid Upto | 27 April 2027 |
| Extendable Upto | 26 April 2030 |
Approval Documents
Unit Inventory & Configuration Details
Configuration mix and floor-level disclosures with both grouped and raw RERA views.
Development Works & Common Area Disclosures
Project-level common infrastructure disclosures as reported by the developer to the RERA authority.
| Demarcation Of Plots % not reported | Boundary Wall 15% | Road Work 100% |
| Footpaths 100% | Water Supply Including Drinking Water Facilities % not reported | Sewer System % not reported |
| Drain 100% | Parks 40% | Tree Planting 50% |
| Design For Electric Supply Including Street Lighting % not reported | Community Buildings % not reported | Treatment And Disposal System Of Sewage And Sullage Water % not reported |
| Solid Waste Management And Disposal System % not reported | Water Conservation System % not reported | Energy Management System Including Use Of Renewable Energy % not reported |
| Fire Protection And Fire Safety System % not reported | Social Infrastructure And Other Public Amenities Including Public Health Services % not reported | Emergency Evacuation Services % not reported |
| Other Miscellaneous Work % not reported |
RERA Documents & Filings
All statutory documents uploaded by the promoter to the authority portal.
Bank & Cost Disclosure
Declared project cost and the designated escrow account on file.
| Project Cost (in Lacs) | ₹ 7,675 |
|---|---|
| Registration Fee | ₹ 43,500 |