Squareyards Logo
Blogs
Sell or Rent Property
Login
Rera Banner
residential Ready to Move Source: rera.up

Gaur City 2 - 14th Avenue RERA Details - UPRERAPRJ6742, Greater Noida

View the RERA registration, promoter, approval, building, inventory, document and construction-progress disclosures for Gaur City 2 - 14th Avenue under registration UPRERAPRJ6742 in Greater Noida, Uttar Pradesh. Data is sourced from rera.up.

RERA

RERA Snapshot

The most important statutory project disclosures, generated dynamically from available RERA fields.

  • RERA Number UPRERAPRJ6742
  • Project Name 14th Avenue (Group Housing) - Gaur City
  • Project Type Residential
  • Project Status Ready to Move
  • State Uttar Pradesh
  • District Gautam Buddha Nagar
  • Taluka Dadri
  • Authority Greater Noida Authority
  • Original Completion 26 March 2023
  • Revised Completion 27 September 2022
  • Project Area (in Sq.mt.) 63,810
  • Documents 79 Verified
Timeline

Project Timeline & Completion Details

Key statutory dates from registration through proposed completion and permit validity.

Proposed Start 01 April 2014 Expected commencement of civil works and foundation on site.
Original Completion 26 March 2023 Mandated date for project handover to the allottees and final compliance filing.
Revised Completion 27 September 2022 No revision filed against the original committed handover date.
Project Duration
108 months
Promoter

Promoter, Organisation & Member Details

Declared promoter entity, address and corporate identifiers on file with the authority.

Primary Promoter

GAURSONS PROMOTERS PRIVATE LIMITED Company
Promoter Type Company
Contact 9582279254
Email gaurspromoters@gaursonsindia.com
Registered Address Office No-F-101 First Floor, Plot no 2/3 Ashish commercial complex ,LSC , New Rajdhani enclave East Delhi 110092
Location

Land, Address & Location Details

Land parcel, zoning and geo-coordinates as recorded in the project filing.

Land Type Plot Plot No. GH-03
Land Area (in Sq.mt.) 4,16,468.60

RERA Coordinates

Latitude, Longitude 28.618857212330255, 77.41922536466424
Plans

Plans & Approvals

Statutory approvals obtained or pending against the project site.

Permit Number Plg(BP)-2526/GH/FTS-1556
Permit Date 26 February 2014
Valid Upto 25 February 2019
Extendable Upto 26 September 2027

Approval Documents

Approved Layout PDF
Sanctioned Letter PDF
Approved Map PDF
Floor Plan PDF
Project Specifications PDF

Understand this Project's RERA details

Get clear answers and additional support from our RERA experts.

RERA Banner
Inventory

Unit Inventory & Configuration Details

Configuration mix and floor-level disclosures with both grouped and raw RERA views.

Total Units 4953
Configurations 6
Inventory Type RESIDENTIAL
Configuration Distribution
1 BHK 488 units · avg area 28.17 Sq.mt.
2 BHK 2327 units · avg area 49.73 Sq.mt.
3 BHK 1892 units · avg area 64.83 Sq.mt.
OTHER 33 units · avg area 798.89 Sq.mt.
SHOP 112 units · avg area 27.53 Sq.mt.
STUDIO 101 units · avg area 21.99 Sq.mt.
  • BLOCK-A
  • BLOCK-B
  • BLOCK-C
  • BLOCK-D
  • BLOCK-E
  • BLOCK-F
  • BLOCK-G
  • BLOCK-H
  • BLOCK-I
  • BLOCK-J
  • BLOCK-K
  • BLOCK-L
  • BLOCK-M
  • BLOCK-N
  • BLOCK-O
  • BLOCK-P
  • BLOCK-Q
  • BLOCK-R
  • FACILITIES BLOCK
Floor-Wise Inventory Explorer
Floor Apartment Type Carpet Area No. of Apartment No. of Balcony No. of Verandah Balcony Area Verandah Area
GF 2 BHK 48.41 8 0 2 0 15.29
1 2 BHK 48.41 8 2 0 15.29 0
2 2 BHK 48.41 8 2 0 15.29 0
3 2 BHK 48.41 8 2 0 15.29 0
4 2 BHK 48.41 8 2 0 15.29 0
5 2 BHK 48.41 8 2 0 15.29 0
6 2 BHK 48.41 8 2 0 15.29 0
7 2 BHK 48.41 8 2 0 15.29 0
8 2 BHK 48.41 8 2 0 15.29 0
9 2 BHK 48.41 8 2 0 15.29 0
10 2 BHK 48.41 8 2 0 15.29 0
11 2 BHK 48.41 8 2 0 15.29 0
12 2 BHK 48.41 8 2 0 15.29 0
13 2 BHK 48.41 8 2 0 15.29 0
14 2 BHK 48.41 8 2 0 15.29 0
15 2 BHK 48.41 8 2 0 15.29 0
16 2 BHK 48.41 8 2 0 15.29 0
17 2 BHK 48.41 8 2 0 15.29 0
18 2 BHK 48.41 8 2 0 15.29 0
19 2 BHK 48.41 8 2 0 15.29 0
20 2 BHK 48.41 8 2 0 15.29 0
21 2 BHK 48.41 8 2 0 15.29 0
22 2 BHK 48.41 8 2 0 15.29 0
23 2 BHK 48.41 8 2 0 15.29 0
24 2 BHK 48.41 8 2 0 15.29 0
25 2 BHK 48.41 8 2 0 15.29 0
26 2 BHK 48.41 8 2 0 15.29 0
27 2 BHK 48.41 8 2 0 15.29 0
Development

Development Works & Common Area Disclosures

Project-level common infrastructure disclosures as reported by the developer to the RERA authority.

Demarcation Of Plots % not reported Boundary Wall 100% Road Work 100%
Footpaths 100% Water Supply Including Drinking Water Facilities % not reported Sewer System % not reported
Drain 100% Parks 100% Tree Planting 100%
Design For Electric Supply Including Street Lighting % not reported Community Buildings 100% Treatment And Disposal System Of Sewage And Sullage Water 100%
Solid Waste Management And Disposal System % not reported Water Conservation System % not reported Energy Management System Including Use Of Renewable Energy % not reported
Fire Protection And Fire Safety System % not reported Social Infrastructure And Other Public Amenities Including Public Health Services % not reported Emergency Evacuation Services % not reported
Other Miscellaneous Work % not reported
Documents

RERA Documents & Filings

All statutory documents uploaded by the promoter to the authority portal.

Ca Certificate PDF· 01-04-2020 To 30-06-2020
Architect Certificate PDF· 01-04-2020 To 30-06-2020
Engineer Certificate PDF· 01-04-2020 To 30-06-2020
Ca Certificate PDF· 01-07-2020 To 30-09-2020
Architect Certificate PDF· 01-07-2020 To 30-09-2020
Engineer Certificate PDF· 01-07-2020 To 30-09-2020
Ca Certificate PDF· 01-10-2020 To 31-12-2020
Architect Certificate PDF· 01-10-2020 To 31-12-2020
Engineer Certificate PDF· 01-10-2020 To 31-12-2020
Ca Certificate PDF· 01-01-2021 To 31-03-2021
Architect Certificate PDF· 01-01-2021 To 31-03-2021
Engineer Certificate PDF· 01-01-2021 To 31-03-2021
Ca Certificate PDF· 01-04-2021 To 30-06-2021
Architect Certificate PDF· 01-04-2021 To 30-06-2021
Engineer Certificate PDF· 01-04-2021 To 30-06-2021
Ca Certificate PDF· 01-07-2021 To 30-09-2021
Architect Certificate PDF· 01-07-2021 To 30-09-2021
Engineer Certificate PDF· 01-07-2021 To 30-09-2021
Ca Certificate PDF· 01-10-2021 To 31-12-2021
Architect Certificate PDF· 01-10-2021 To 31-12-2021
Engineer Certificate PDF· 01-10-2021 To 31-12-2021
Ca Certificate PDF· 01-01-2022 To 31-03-2022
Architect Certificate PDF· 01-01-2022 To 31-03-2022
Engineer Certificate PDF· 01-01-2022 To 31-03-2022
Ca Certificate PDF· 01-04-2022 To 30-06-2022
Architect Certificate PDF· 01-04-2022 To 30-06-2022
Engineer Certificate PDF· 01-04-2022 To 30-06-2022
Ca Certificate PDF· 01-07-2022 To 30-09-2022
Architect Certificate PDF· 01-07-2022 To 30-09-2022
Engineer Certificate PDF· 01-07-2022 To 30-09-2022
Ca Certificate PDF· 01-10-2022 To 31-12-2022
Architect Certificate PDF· 01-10-2022 To 31-12-2022
Engineer Certificate PDF· 01-10-2022 To 31-12-2022
Ca Certificate PDF· 01-01-2023 To 31-03-2023
Architect Certificate PDF· 01-01-2023 To 31-03-2023
Engineer Certificate PDF· 01-01-2023 To 31-03-2023
Dd 1 Lease Deed
Du 1 Details Of Encumbrances
Du 2 Commencement Certificate
Du 3 Other Plan(If Any)
Du 4 Proforma Of Application Form
Du 5 Proforma Of Allotment Letter
Du 6 Proforma Of Conveyance Deed
Du 7 Waste Disposal Plan
Du 8 Water Supply Plan
Du 9 Electricity Supply Plan
Du 10 Development Work Plan
Du 11 Affidavit (Form-B)
Du 12 CA CERTIFICATE
Du 13 ARCHITECT CERTIFICATE
Du 14 ENGINEERS CERTIFICATE
Du 15 Registry Document In Case Of Own Land
Du 16 Authentic Copy Of Approval Of Project
Du 17 Commencement Certificate
Du 18 Sanctioned Layout Plan (Of Entire Project)
Du 19 Sanctioned Building Block Plan (Add Plans For All Buildings Or Blocks)
Du 20 Floor Plans Of All Types
Du 21 Floor Plans Of All Types
Du 22 Proforma Of Application Form
Du 23 Proforma Of Allotment Letter
Du 24 Proforma Of Conveyance Deed
Du 25 Waste Disposal Plan
Du 26 Water Supply Plan
Du 27 Development Work Plan
Du 28 Affidavit (Form-B)
Du 29 Authentic Copy Of Approval Of Project
Du 30 Sanctioned Building Block Plan (Add Plans For All Buildings Or Blocks)
Du 31 Sanctioned Building Block Plan (Add Plans For All Buildings Or Blocks)
Du 32 Sanctioned Building Block Plan (Add Plans For All Buildings Or Blocks)
Du 33 Sanctioned Building Block Plan (Add Plans For All Buildings Or Blocks)
Du 34 Sanctioned Building Block Plan (Add Plans For All Buildings Or Blocks)
Du 35 Sanctioned Building Block Plan (Add Plans For All Buildings Or Blocks)
Du 36 Sanctioned Building Block Plan (Add Plans For All Buildings Or Blocks)
Du 37 Sanctioned Building Block Plan (Add Plans For All Buildings Or Blocks)
Du 38 Sanctioned Building Block Plan (Add Plans For All Buildings Or Blocks)
Du 39 Sanctioned Building Block Plan (Add Plans For All Buildings Or Blocks)
Du 40 Sanctioned Building Block Plan (Add Plans For All Buildings Or Blocks)
Du 41 Commencement Certificate
Du 42 Sanctioned Layout Plan (Of Entire Project)
Bank

Bank & Cost Disclosure

Declared project cost and the designated escrow account on file.

Project Cost (in Lacs) ₹ 1.26 L
Registration Fee ₹ 3.24 L
Project Account Bank Kotak Mahindra Bank
Account Number (RERA) 2012185874
IFSC KKBK0000958
Branch MUMBAI-NARIMAN POINT
Branch Address 5 C/ II, MITTAL COURT,224, NARIMAN POINT,MUMBAI - 400 021
Country/City