Squareyards Logo
Blogs
Sell or Rent Property
Login
Rera Banner
residential Ready to Move Source: rera.up

Nirala Greenshire RERA Details - UPRERAPRJ4975, Greater Noida

View the RERA registration, promoter, approval, building, inventory, document and construction-progress disclosures for Nirala Greenshire under registration UPRERAPRJ4975 in Greater Noida, Uttar Pradesh. Data is sourced from rera.up.

RERA

RERA Snapshot

The most important statutory project disclosures, generated dynamically from available RERA fields.

  • RERA Number UPRERAPRJ4975
  • Project Name NIRALA GREENSHIRE PH-1 (G6-G12,G14)
  • Project Type Residential
  • Project Status Ready to Move
  • State Uttar Pradesh
  • District Gautam Buddha Nagar
  • Taluka Gautam Buddha Nagar
  • Authority Greater Noida Authority
  • Original Completion 29 March 2022
  • Revised Completion 30 September 2020
  • Project Area (in Sq.mt.) 25,740
  • Documents 46 Verified
Timeline

Project Timeline & Completion Details

Key statutory dates from registration through proposed completion and permit validity.

Proposed Start 01 February 2014 Expected commencement of civil works and foundation on site.
Original Completion 29 March 2022 Mandated date for project handover to the allottees and final compliance filing.
Revised Completion 30 September 2020 No revision filed against the original committed handover date.
Project Duration
98 months
Promoter

Promoter, Organisation & Member Details

Declared promoter entity, address and corporate identifiers on file with the authority.

Primary Promoter

NIRALA PROJECTS PRIVATE LIMITED Company
Promoter Type Company
Contact 9810690076
Email npplrera@niralaindia.in
Registered Address 1113, 11TH FLOOR, KAILASH BUILDING, PLOT NO.26, KASTURBA GANDHI MARG, NEW DELHI – 110001
Location

Land, Address & Location Details

Land parcel, zoning and geo-coordinates as recorded in the project filing.

Land Type Plot Plot No. GH-03 Sector-02, Greater Noida West
Land Area (in Sq.mt.) 40,852.50

RERA Coordinates

Latitude, Longitude 28.5798582, 77.4456578
Plans

Plans & Approvals

Statutory approvals obtained or pending against the project site.

Permit Number PLG(BP)/BP-3205/44/OPA-5967
Permit Date 12 September 2013
Valid Upto 12 September 2018
Extendable Upto 12 September 2023

Approval Documents

Approved Layout PDF
Sanctioned Letter PDF
Approved Map PDF
Floor Plan PDF
Project Specifications PDF

Understand this Project's RERA details

Get clear answers and additional support from our RERA experts.

RERA Banner
Inventory

Unit Inventory & Configuration Details

Configuration mix and floor-level disclosures with both grouped and raw RERA views.

Total Units 1132
Configurations 3
Inventory Type RESIDENTIAL
Configuration Distribution
1 BHK 2 units · avg area 44.79 Sq.mt.
2 BHK 750 units · avg area 57.95 Sq.mt.
3 BHK 380 units · avg area 83.58 Sq.mt.
  • TOWER G-6
  • TOWER G-7
  • TOWER G-8
  • TOWER G-9
  • TOWER G-10
  • TOWER G-14
  • TOWER G-12
  • TOWER G-11
Floor-Wise Inventory Explorer
Floor Apartment Type Carpet Area No. of Apartment No. of Balcony No. of Verandah Balcony Area Verandah Area
GF 3 BHK 76.62 2 2 0 15.258 0
GF 3 BHK 93.85 1 4 0 19.649 0
GF 3 BHK 93.85 1 3 0 16.496 0
1 3 BHK 85.21 2 2 0 13.038 0
1 3 BHK 93.85 2 4 0 19.649 0
2 3 BHK 85.21 2 3 0 17.117 0
2 3 BHK 93.85 2 4 0 19.649 0
3 3 BHK 85.21 2 3 0 17.115 0
3 3 BHK 93.85 2 4 0 19.649 0
4 3 BHK 85.21 2 3 0 17.115 0
4 3 BHK 93.85 2 4 0 19.649 0
5 3 BHK 85.21 2 3 0 15.743 0
5 3 BHK 93.85 2 4 0 19.649 0
6 3 BHK 85.21 2 3 0 15.743 0
6 3 BHK 93.85 2 4 0 19.649 0
7 3 BHK 85.21 2 3 0 15.743 0
7 3 BHK 93.85 2 4 0 19.649 0
8 3 BHK 85.21 2 3 0 15.743 0
8 3 BHK 93.85 2 4 0 19.649 0
9 3 BHK 85.21 2 3 0 15.743 0
9 3 BHK 93.85 2 4 0 19.649 0
10 3 BHK 85.21 2 3 0 15.743 0
10 3 BHK 93.85 2 4 0 19.649 0
11 3 BHK 85.21 2 3 0 15.743 0
11 3 BHK 93.85 2 4 0 19.649 0
12 3 BHK 85.21 2 3 0 15.743 0
12 3 BHK 93.85 2 4 0 19.649 0
13 3 BHK 85.21 2 3 0 15.743 0
13 3 BHK 93.85 2 4 0 19.649 0
14 3 BHK 85.21 2 3 0 15.743 0
14 3 BHK 93.85 2 4 0 19.649 0
15 3 BHK 85.21 2 3 0 15.743 0
15 3 BHK 93.85 2 4 0 19.649 0
16 3 BHK 85.21 2 3 0 15.743 0
16 3 BHK 93.85 2 4 0 19.649 0
17 3 BHK 85.21 2 3 0 15.743 0
17 3 BHK 93.85 2 4 0 19.649 0
18 3 BHK 85.21 2 3 0 15.743 0
18 3 BHK 93.85 2 4 0 19.649 0
Development

Development Works & Common Area Disclosures

Project-level common infrastructure disclosures as reported by the developer to the RERA authority.

Demarcation Of Plots % not reported Boundary Wall 100% Road Work 100%
Footpaths 100% Water Supply Including Drinking Water Facilities % not reported Sewer System % not reported
Drain 100% Parks 100% Tree Planting 100%
Design For Electric Supply Including Street Lighting % not reported Community Buildings 100% Treatment And Disposal System Of Sewage And Sullage Water 200%
Solid Waste Management And Disposal System % not reported Water Conservation System % not reported Energy Management System Including Use Of Renewable Energy % not reported
Fire Protection And Fire Safety System % not reported Social Infrastructure And Other Public Amenities Including Public Health Services % not reported Emergency Evacuation Services % not reported
Other Miscellaneous Work % not reported
Documents

RERA Documents & Filings

All statutory documents uploaded by the promoter to the authority portal.

Ca Certificate PDF· 01-04-2020 To 30-06-2020
Architect Certificate PDF· 01-04-2020 To 30-06-2020
Engineer Certificate PDF· 01-04-2020 To 30-06-2020
Ca Certificate PDF· 01-07-2020 To 30-09-2020
Architect Certificate PDF· 01-07-2020 To 30-09-2020
Engineer Certificate PDF· 01-07-2020 To 30-09-2020
Ca Certificate PDF· 01-10-2020 To 31-12-2020
Architect Certificate PDF· 01-10-2020 To 31-12-2020
Engineer Certificate PDF· 01-10-2020 To 31-12-2020
Ca Certificate PDF· 01-01-2021 To 31-03-2021
Architect Certificate PDF· 01-01-2021 To 31-03-2021
Engineer Certificate PDF· 01-01-2021 To 31-03-2021
Ca Certificate PDF· 01-04-2021 To 30-06-2021
Architect Certificate PDF· 01-04-2021 To 30-06-2021
Engineer Certificate PDF· 01-04-2021 To 30-06-2021
Ca Certificate PDF· 01-07-2021 To 30-09-2021
Architect Certificate PDF· 01-07-2021 To 30-09-2021
Engineer Certificate PDF· 01-07-2021 To 30-09-2021
Ca Certificate PDF· 01-10-2021 To 31-12-2021
Architect Certificate PDF· 01-10-2021 To 31-12-2021
Engineer Certificate PDF· 01-10-2021 To 31-12-2021
Ca Certificate PDF· 01-01-2022 To 31-03-2022
Architect Certificate PDF· 01-01-2022 To 31-03-2022
Engineer Certificate PDF· 01-01-2022 To 31-03-2022
Ca Certificate PDF· 01-04-2022 To 30-06-2022
Architect Certificate PDF· 01-04-2022 To 30-06-2022
Engineer Certificate PDF· 01-04-2022 To 30-06-2022
Ca Certificate PDF· 01-07-2022 To 30-09-2022
Architect Certificate PDF· 01-07-2022 To 30-09-2022
Engineer Certificate PDF· 01-07-2022 To 30-09-2022
Dd 1 Lease Deed
Dd 2 Allotment Letter Issued By Competent Authority
Du 1 Commencement Certificate
Du 2 Proforma Of Allotment Letter
Du 3 Proforma Of Conveyance Deed
Du 4 Proforma Of Completion Certificate(Occupancy)
Du 5 Waste Disposal Plan
Du 6 Water Supply Plan
Du 7 Electricity Supply Plan
Du 8 Affidavit (Form-B)
Du 9 Registry Document In Case Of Own Land
Du 10 Registry Document In Case Of Own Land
Du 11 Details Of Encumbrances
Du 12 Sanctioned Layout Plan (Of Entire Project)
Du 13 Water Supply Plan
Du 14 Electricity Supply Plan
Bank

Bank & Cost Disclosure

Declared project cost and the designated escrow account on file.

Project Cost (in Lacs) ₹ 410
Registration Fee ₹ 1.34 L
Project Account Bank AXIS BANK LTD
Account Number (RERA) 915020030601830
IFSC UTIB0000361
Branch AXIS BANK LTD
Branch Address SECTOR 18 NOIDA
Country/City