Squareyards Logo
Blogs
Sell or Rent Property
Login
Rera Banner
residential Ready to Move Source: rera.up

Indraprastha Anand RERA Details - UPRERAPRJ4360, Lucknow

View the RERA registration, promoter, approval, building, inventory, document and construction-progress disclosures for Indraprastha Anand under registration UPRERAPRJ4360 in Lucknow, Uttar Pradesh. Data is sourced from rera.up.

RERA

RERA Snapshot

The most important statutory project disclosures, generated dynamically from available RERA fields.

  • RERA Number UPRERAPRJ4360
  • Project Name INDRAPRASTHA ANAND
  • Project Type Residential
  • Project Status Ready to Move
  • State Uttar Pradesh
  • District Lucknow
  • Taluka Lucknow
  • Authority U.P. Awas Evam Vikas Parishad
  • Original Completion 30 June 2022
  • Revised Completion 31 December 2020
  • Project Area (in Sq.mt.) 7,600
  • Documents 52 Verified
Timeline

Project Timeline & Completion Details

Key statutory dates from registration through proposed completion and permit validity.

Proposed Start 01 April 2016 Expected commencement of civil works and foundation on site.
Original Completion 30 June 2022 Mandated date for project handover to the allottees and final compliance filing.
Revised Completion 31 December 2020 No revision filed against the original committed handover date.
Project Duration
75 months
Promoter

Promoter, Organisation & Member Details

Declared promoter entity, address and corporate identifiers on file with the authority.

Primary Promoter

VIJAY SHRI CONSTRUCTIONS Proprietorship Firm
Promoter Type Proprietorship Firm
Contact 9695649009
Email indraprasthaanand01@yahoo.in
Registered Address 24/GH-103 SECTOR 24 INDIRA NAGAR
Location

Land, Address & Location Details

Land parcel, zoning and geo-coordinates as recorded in the project filing.

Land Type Plot Plot No. 24/103
Land Area (in Sq.mt.) 7,600

RERA Coordinates

Latitude, Longitude 26.88, 80.98 Latitude, Longitude 26.88, 80.98
Plans

Plans & Approvals

Statutory approvals obtained or pending against the project site.

Permit Number 349/A.V.P./UN-3
Permit Date 24 April 2014
Valid Upto 23 April 2019
Extendable Upto 23 April 2022

Approval Documents

Approved Layout PDF
Sanctioned Letter PDF
Approved Map PDF
Floor Plan PDF
Project Specifications PDF

Understand this Project's RERA details

Get clear answers and additional support from our RERA experts.

RERA Banner
Inventory

Unit Inventory & Configuration Details

Configuration mix and floor-level disclosures with both grouped and raw RERA views.

Total Units 222
Configurations 4
Inventory Type RESIDENTIAL
Configuration Distribution
2 BHK 106 units · avg area 82.41 Sq.mt.
3 BHK 112 units · avg area 113.67 Sq.mt.
4 BHK 4 units · avg area 173.34 Sq.mt.
OTHER 0 units
  • A
  • B
  • C
  • D
Floor-Wise Inventory Explorer
Floor Apartment Type Carpet Area No. of Apartment No. of Balcony No. of Verandah Balcony Area Verandah Area
GF 2 BHK 82.50 1 3 0 10.22 0
GF 3 BHK 116.09 2 3 0 11.77 0
GF 3 BHK 114.70 1 3 0 13.04 0
1 2 BHK 82.50 1 3 0 10.22 0
1 3 BHK 116.09 2 3 0 11.77 0
1 3 BHK 114.70 1 3 0 13.04 0
2 2 BHK 82.50 1 3 0 10.22 0
2 3 BHK 116.09 2 3 0 11.77 0
2 3 BHK 114.70 1 3 0 13.04 0
3 2 BHK 82.50 1 3 0 10.22 0
3 3 BHK 116.09 2 3 0 11.77 0
3 3 BHK 114.70 1 3 0 13.04 0
4 2 BHK 82.50 1 3 0 10.22 0
4 3 BHK 116.09 2 3 0 11.77 0
4 3 BHK 114.70 1 3 0 13.04 0
5 2 BHK 82.50 1 3 0 10.22 0
5 3 BHK 116.09 2 3 0 11.77 0
5 3 BHK 114.70 1 3 0 13.04 0
6 2 BHK 82.50 1 3 0 10.22 0
6 3 BHK 116.09 2 3 0 11.77 0
6 3 BHK 114.70 1 3 0 13.04 0
7 2 BHK 82.50 1 3 0 10.22 0
7 3 BHK 116.09 2 3 0 11.77 0
7 3 BHK 114.70 1 3 0 13.04 0
8 2 BHK 82.50 1 3 0 10.22 0
8 3 BHK 116.09 2 3 0 11.77 0
8 3 BHK 114.70 1 3 0 13.04 0
9 2 BHK 82.50 1 3 0 10.22 0
9 3 BHK 116.09 2 3 0 11.77 0
9 3 BHK 114.70 1 3 0 13.04 0
10 2 BHK 82.50 1 3 0 10.22 0
10 3 BHK 116.09 2 3 0 11.77 0
10 3 BHK 114.70 1 3 0 13.04 0
11 2 BHK 82.50 1 3 0 10.22 0
11 3 BHK 116.09 2 3 0 11.77 0
11 3 BHK 114.70 1 3 0 13.04 0
12 2 BHK 82.50 1 3 0 10.22 0
12 3 BHK 116.09 2 3 0 11.77 0
12 3 BHK 114.70 1 3 0 13.04 0
13 2 BHK 82.50 1 3 0 10.22 0
13 3 BHK 116.09 2 3 0 11.77 0
13 3 BHK 114.70 1 3 0 13.04 0
BSMNT OTHER 0 0 0 0 0 0
GF OTHER 0 0 0 0 0 0
Development

Development Works & Common Area Disclosures

Project-level common infrastructure disclosures as reported by the developer to the RERA authority.

Demarcation Of Plots % not reported Boundary Wall 100% Road Work 100%
Footpaths % not reported Water Supply Including Drinking Water Facilities % not reported Sewer System % not reported
Drain 100% Parks 100% Tree Planting 100%
Design For Electric Supply Including Street Lighting % not reported Community Buildings 100% Treatment And Disposal System Of Sewage And Sullage Water 100%
Solid Waste Management And Disposal System % not reported Water Conservation System % not reported Energy Management System Including Use Of Renewable Energy % not reported
Fire Protection And Fire Safety System % not reported Social Infrastructure And Other Public Amenities Including Public Health Services % not reported Emergency Evacuation Services % not reported
Other Miscellaneous Work % not reported
Documents

RERA Documents & Filings

All statutory documents uploaded by the promoter to the authority portal.

Ca Certificate PDF· 01-04-2020 To 30-06-2020
Architect Certificate PDF· 01-04-2020 To 30-06-2020
Engineer Certificate PDF· 01-04-2020 To 30-06-2020
Ca Certificate PDF· 01-07-2020 To 30-09-2020
Architect Certificate PDF· 01-07-2020 To 30-09-2020
Engineer Certificate PDF· 01-07-2020 To 30-09-2020
Ca Certificate PDF· 01-10-2020 To 31-12-2020
Architect Certificate PDF· 01-10-2020 To 31-12-2020
Engineer Certificate PDF· 01-10-2020 To 31-12-2020
Ca Certificate PDF· 01-01-2021 To 31-03-2021
Architect Certificate PDF· 01-01-2021 To 31-03-2021
Engineer Certificate PDF· 01-01-2021 To 31-03-2021
Ca Certificate PDF· 01-04-2021 To 30-06-2021
Architect Certificate PDF· 01-04-2021 To 30-06-2021
Engineer Certificate PDF· 01-04-2021 To 30-06-2021
Ca Certificate PDF· 01-07-2021 To 30-09-2021
Architect Certificate PDF· 01-07-2021 To 30-09-2021
Engineer Certificate PDF· 01-07-2021 To 30-09-2021
Ca Certificate PDF· 01-10-2021 To 31-12-2021
Architect Certificate PDF· 01-10-2021 To 31-12-2021
Engineer Certificate PDF· 01-10-2021 To 31-12-2021
Ca Certificate PDF· 01-01-2022 To 31-03-2022
Architect Certificate PDF· 01-01-2022 To 31-03-2022
Engineer Certificate PDF· 01-01-2022 To 31-03-2022
Ca Certificate PDF· 01-04-2022 To 30-06-2022
Architect Certificate PDF· 01-04-2022 To 30-06-2022
Engineer Certificate PDF· 01-04-2022 To 30-06-2022
Dd 1 Registry Document
Dd 2 Registry Document
Dd 3 Registry Document
Du 1 Commencement Certificate
Du 2 Proforma Of Application Form
Du 3 Proforma Of Allotment Letter
Du 4 Proforma Of Conveyance Deed
Du 5 Waste Disposal Plan
Du 6 Water Supply Plan
Du 7 Electricity Supply Plan
Du 8 Affidavit (Form-B)
Du 9 ARCHITECT CERTIFICATE
Du 10 ENGINEERS CERTIFICATE
Du 11 Affidavit (Form-B)
Du 12 Affidavit (Form-B)
Du 13 Registry Document In Case Of Own Land
Du 14 Registry Document In Case Of Own Land
Du 15 Registry Document In Case Of Own Land
Du 16 Authentic Copy Of Approval Of Project
Du 17 Sanctioned Layout Plan (Of Entire Project)
Du 18 Water Supply Plan
Du 19 Electricity Supply Plan
Du 20 Sanctioned Building Block Plan (Add Plans For All Buildings Or Blocks)
Du 21 Commencement Certificate
Du 22 Water Supply Plan
Bank

Bank & Cost Disclosure

Declared project cost and the designated escrow account on file.

Project Cost (in Lacs) ₹ 3,500
Registration Fee ₹ 43,000
Project Account Bank HDFC BANK
Account Number (RERA) 50200003694674
IFSC HDFC0000296
Branch 11 INDIRA NAGAR LEKHRAJ KHAZANA LUCKNOW
Branch Address 11 INDIRA NAGAR LEKHRAJ KHAZANA LUCKNOW
Country/City