coming soon
Skylandvision Centre Point Complex Gomti Nagar, Lucknow
Skylandvision Centre Point Complex Floor Plans and Pricing
coming soon
coming soon
Retail Shop - 1029 sq. ft. (Carpet Area)
Skylandvision Centre Point Complex Price Trends and Market Insights
Price Trends
Gomti Nagar's average asking price is cooling quarter-on-quarter.
- Current asking price
- ₹ 7,600/sq.ft.
- Quarter over quarter price change
- -38.5% QoQ
Comparable Projects
Rentals
Monthly Rent in Gomti Nagar ranges from ₹ 13.6 K to ₹ 52.1 K with options available for STUDIO,1,2,3,4 BHK units
Recent Updates
Get the latest price and market updates for Skylandvision Centre Point Complex.
-
Lucknow Link Expressway Approved: Rs 4,776 Crore Project
The Uttar Pradesh government has approved the Lucknow Link Expressway, a six-lane greenfield road project costing Rs 4,776 crore. This 51 km expressway will connect the Agra-Lucknow Expressway with the Purvanchal Expressway, providing a faster route and bypassing city traffic.
-
153 Spots on Ayodhya Road Identified for Traffic and Safety Improvements
In compliance with a high court directive, Lucknow Traffic Police has identified 153 locations along the Ayodhya Road, specifically the Polytechnic-Chinhat corridor and adjoining roads, that require traffic, road-safety, and infrastructure interventions. A joint inspection by traffic police and civic departments is underway to assess the feasibility of proposed measures.
-
Lucknow Boosts Infrastructure with Rs 266 Crore Civic Development Plan
LDA has approved a comprehensive package of 120 projects totaling Rs 266 crore to enhance urban infrastructure, public amenities, tourism, and emergency response. Key initiatives include a Rs 25 crore water laser light and sound show at the Gomti riverfront, Rs 68 crore for advanced firefighting platforms, amongst many other smaleer projects.
-
Lucknow-Kanpur Expressway Nears Completion, Promising Faster Travel
The 63-km Lucknow-Kanpur Expressway is nearing completion and is expected to be operational by February 2026. This project, built at a cost of Rs 4,700 crore, will reduce travel time between Lucknow's Amausi area and Kanpur to just 40 minutes. The expressway is anticipated to strengthen daily commuting and industrial movement between the two cities.
-
Infrastructure Boom Reshaping Lucknow's Real Estate and Civic Landscape
Uttar Pradesh's extensive expressway network, involving an investment of Rs 50,000 crore for 2,650 km, is significantly impacting Lucknow's real estate market by reducing travel times and integrating the city into a wider regional grid. This development is driving sustained demand for organized, plotted developments and integrated townships.
-
Centre Point Complex, developed by SKYLANDVISION INFRA PRIVATE LIMITED, officially launched on 01-Jun-2022 and expected to complete by 31-Dec-2023. Registered under RERA No. UPRERAPRJ398937. The project comprises 1 towers with total area of 0.45 Acre.
Amenities & Specifications of Skylandvision Centre Point Complex
Convenience
- Power Backup
- High Speed Elevators
- 24*7 Water Supply
Safety
- 24 x 7 Security
- CCTV / Video Surveillance
- Fire Fighting Systems
Environment
- Normal Park / Central Green
Leisure
- Multi Brand Retail
Specifications
- Structure
- RCC Frame Structure
Location and Connectivity Around Skylandvision Infra Pvt Ltd Gomti Nagar

Connecting Roads
Trust & Verification
RERA Details of Skylandvision Centre Point Complex
UPRERAPRJ398937
Centre Point Complex
- Original commencement 1 Jun 2022
- Original completion 30 Dec 2024
- Revised completion 31 Dec 2023
Want to know more about the Project RERA details?
Square Yards RERA Reg. UPRERAAGT10119
How does Skylandvision Centre Point Complex compare with similar projects?
Share your genuine review and help other buyers make an informed decision.
Skylandvision Infra Pvt Ltd Track Record
Frequently Asked Questions About Skylandvision Centre Point Complex
Skylandvision Centre Point Complex enjoys excellent connectivity via Sultanpur Road, Shaheed Path and is well connected to the Lucknow East area.
Ready to Move projects like Skylandvision Centre Point Complex may be priced slightly higher, but they eliminate construction delays, GST, and rental overlap costs.
Yes, since Skylandvision Centre Point Complex is a Ready to Move project in Gomti Nagar, buyers can arrange site visits and inspect the actual apartment before finalizing the deal.
After taking possession at Skylandvision Centre Point Complex, buyers should inspect electrical fittings, plumbing and water supply (municipal/borewell), elevator operations across 1, parking allocation, common areas, and verify that the flat matches the approved RCC Frame Structure and inventory list before moving in.
Buyers need identity proof, address proof, agreement to sell, sale deed, and registration documents for purchasing in Skylandvision Centre Point Complex.
This website is only for the purpose of providing information regarding real estate projects in different geographies. Any information which is being provided on this website is not an advertisement or a solicitation. The company has not verified the information and the compliances of the projects. Further, the company has not checked the RERA* registration status of the real estate projects listed herein. The company does not make any representation in regards to the compliances done against these projects. Please note that you should make yourself aware about the RERA* registration status of the listed real estate projects.
*Real Estate (Regulation & Development) Act, 2016.