Squareyards Logo
Blogs
Sell or Rent Property
Login
Rera Banner
residential Ready to Move Source: rera.up

UP Basera 1 Awadh Vihar Yojna RERA Details - UPRERAPRJ451179, Lucknow

View the RERA registration, promoter, approval, building, inventory, document and construction-progress disclosures for UP Basera 1 Awadh Vihar Yojna under registration UPRERAPRJ451179 in Lucknow, Uttar Pradesh. Data is sourced from rera.up.

RERA

RERA Snapshot

The most important statutory project disclosures, generated dynamically from available RERA fields.

  • RERA Number UPRERAPRJ451179
  • Project Name 48 Nos. EWS Houses in Sec-7A at Awadh Vihar Yojna, Lucknow
  • Project Type Residential
  • Project Status Ready to Move
  • State Uttar Pradesh
  • District Lucknow
  • Taluka Sarojini Nagar
  • Authority U.P. Awas Evam Vikas Parishad
  • Original Completion 31 August 2021
  • Revised Completion 31 August 2021
  • Project Area (in Sq.mt.) 520
  • Documents 24 Verified
Timeline

Project Timeline & Completion Details

Key statutory dates from registration through proposed completion and permit validity.

Proposed Start 01 January 2021 Expected commencement of civil works and foundation on site.
Original Completion 31 August 2021 Mandated date for project handover to the allottees and final compliance filing.
Revised Completion 31 August 2021 No revision filed against the original committed handover date.
Project Duration
8 months
Promoter

Promoter, Organisation & Member Details

Declared promoter entity, address and corporate identifiers on file with the authority.

Primary Promoter

U.P. AWAS EVAM VIKAS PARISHAD Competent authority
Promoter Type Competent authority
Contact 8189081725
Email upavp-rera@upavp.com
Registered Address 104 Mahatma Gandhi Marg, Lucknow
Location

Land, Address & Location Details

Land parcel, zoning and geo-coordinates as recorded in the project filing.

Land Type Khasra Plot No. 129
Land Area (in Sq.mt.) 2,300

RERA Coordinates

Latitude, Longitude 26.770006, 26.76983 Latitude, Longitude 80.99174, 80.99179
Plans

Plans & Approvals

Statutory approvals obtained or pending against the project site.

Permit Number UPHDB/APD/UN-3/CD-15/CIR-SSO/001/SEC-7A/RLOP(EWS)48/HC/2406114/S-1/184
Permit Date 16 December 2020
Valid Upto 16 December 2022
Extendable Upto 31 December 2022

Approval Documents

Approved Layout PDF
Sanctioned Letter PDF
Approved Map PDF
Floor Plan PDF
Project Specifications PDF

Understand this Project's RERA details

Get clear answers and additional support from our RERA experts.

RERA Banner
Inventory

Unit Inventory & Configuration Details

Configuration mix and floor-level disclosures with both grouped and raw RERA views.

Total Units 48
Configurations 1
Inventory Type RESIDENTIAL
Configuration Distribution
1 BHK 48 units · avg area 28.22 Sq.mt.
  • B6
  • B7
Floor-Wise Inventory Explorer
Floor Apartment Type Carpet Area No. of Apartment No. of Balcony No. of Verandah Balcony Area Verandah Area
GF 1 BHK 28.22 4 0 1 0 4.45
1 1 BHK 28.22 4 0 1 0 4.45
2 1 BHK 28.22 4 0 1 0 4.45
GF 1 BHK 28.22 4 0 1 0 4.45
Development

Development Works & Common Area Disclosures

Project-level common infrastructure disclosures as reported by the developer to the RERA authority.

Demarcation Of Plots % not reported Boundary Wall % not reported Road Work % not reported
Footpaths % not reported Water Supply Including Drinking Water Facilities % not reported Sewer System % not reported
Drain % not reported Parks % not reported Tree Planting % not reported
Design For Electric Supply Including Street Lighting % not reported Community Buildings % not reported Treatment And Disposal System Of Sewage And Sullage Water % not reported
Solid Waste Management And Disposal System % not reported Water Conservation System % not reported Energy Management System Including Use Of Renewable Energy % not reported
Fire Protection And Fire Safety System % not reported Social Infrastructure And Other Public Amenities Including Public Health Services % not reported Emergency Evacuation Services % not reported
Other Miscellaneous Work % not reported
Documents

RERA Documents & Filings

All statutory documents uploaded by the promoter to the authority portal.

Ca Certificate PDF· 01-01-2021 To 31-03-2021
Architect Certificate PDF· 01-01-2021 To 31-03-2021
Engineer Certificate PDF· 01-01-2021 To 31-03-2021
Ca Certificate PDF· 01-04-2021 To 30-06-2021
Architect Certificate PDF· 01-04-2021 To 30-06-2021
Engineer Certificate PDF· 01-04-2021 To 30-06-2021
Ca Certificate PDF· 01-07-2021 To 30-09-2021
Architect Certificate PDF· 01-07-2021 To 30-09-2021
Engineer Certificate PDF· 01-07-2021 To 30-09-2021
Dd 1 Extract Of Khatauni
Du 1 Details Of Encumbrances
Du 2 Commencement Certificate
Du 3 Other Plan(If Any)
Du 4 Proforma Of Application Form
Du 5 Proforma Of Allotment Letter
Du 6 Proforma Of Conveyance Deed
Du 7 Waste Disposal Plan
Du 8 Water Supply Plan
Du 9 Electricity Supply Plan
Du 10 Development Work Plan
Du 11 Affidavit (Form-B)
Du 12 CA CERTIFICATE
Du 13 ARCHITECT CERTIFICATE
Du 14 ENGINEERS CERTIFICATE
Bank

Bank & Cost Disclosure

Declared project cost and the designated escrow account on file.

Project Cost (in Lacs) ₹ 265
Registration Fee ₹ 5,200
Project Account Bank HDFC BANK
Account Number (RERA) 50100157742071
IFSC HDFC0001112
Branch HDFC LTD
Branch Address 5/19, VISHAL KHAND, GOMTI NAGAR, LUCKNOW-226010
Country/City