RERA Snapshot
The most important statutory project disclosures, generated dynamically from available RERA fields.
- RERA Number PM1240002600801
- Project Name AVANINDRA
- Project Type Mixed
- Project Status New Launch
- State Maharashtra
- District Palghar
- Taluka Vasai
- Village MALONDE
- Original Completion 30 April 2029
- Revised Completion 30 April 2029
- Project Area (in Sq.mt.) 658.9
- Total Buildings/Towers 1
- Documents 16 Verified
Project Timeline & Completion Details
Key statutory dates from registration through proposed completion and permit validity.
Promoter, Organisation & Member Details
Declared promoter entity, address and corporate identifiers on file with the authority.
Promoters, Co-promoters & Members
Land, Address & Location Details
Land parcel, zoning and geo-coordinates as recorded in the project filing.
| Survey Number plot_no NIL city_survey_gut_no 3 final_plot_no NIL sector_no - mauje VASAI MALONDE road_street Parnaka society Avanindra | |
Boundary Details |
|
| Boundaries East ROAD TOWARDS GANAPATI MANDIR | Boundaries West R P WAGH HIGH SCHOOL |
| Boundaries South PRIVATE PROPERTY | Boundaries North M G ROAD |
RERA Coordinates |
|
| Latitude, Longitude 19.344504807341355, 72.80527181148673 | |
Buildings, Towers & Building-Level Details
Statutory building-level disclosures including tower height, sanctioned floors, structural counts and parking areas.
Scroll horizontally to view all building-level fields. Values marked "-" were not disclosed in the source RERA record.
Unit Inventory & Configuration Details
Configuration mix and floor-level disclosures with both grouped and raw RERA views.
Development Works & Common Area Disclosures
Project-level common infrastructure disclosures as reported by the developer to the RERA authority.
| Internal Roads & Footpaths % not reported | Water Supply % not reported | Sewerage (Chamber, Lines, Septic Tank , Stp) % not reported |
| Storm Water Drains % not reported | Landscaping & Tree Planting % not reported | Street Lighting % not reported |
| Community Buildings % not reported | Treatment And Disposal Of Sewage And Sullage Water % not reported | Solid Waste Management And Disposal % not reported |
| Water Conservation /Rain Water Harvesting % not reported | Energy Managemcnt % not reported | Fire Protection And Fire Safety Requirements % not reported |
| Electrical Meter Room, Sub-station, Receiving Station % not reported | Aggregate Area Of Recreational Open Space % not reported | Open Parking % not reported |
Building Activity Progress
Statutory activity-wise construction progress as declared by the developer, per building/tower.
RERA Documents & Filings
All statutory documents uploaded by the promoter to the authority portal.
Bank & Cost Disclosure
Declared project cost and the designated escrow account on file.
| Project Account Bank | BASSEIN CATHOLIC COOPERATIVE BANK LIMITED |
|---|---|
| IFSC | BACB0000005 |
| Branch Address | HOLI BAZAR, PAN-KELA MARKET, TAL & P.O. VASAI, DIST : THANE, 401 201 |