residential Partially Ready To Move Source: rera.mh

Veer Apartments RERA Details - P99000034206, Palghar

View the RERA registration, promoter, approval, building, inventory, document and construction-progress disclosures for Veer Apartments under registration P99000034206 in Palghar, Maharashtra. Data is sourced from rera.mh.

RERA

RERA Snapshot

The most important statutory project disclosures, generated dynamically from available RERA fields.

  • RERA Number P99000034206
  • Project Name VEER 11
  • Project Type Residential / Group Housing
  • Project Status Partially Ready To Move
  • State Maharashtra
  • District Palghar
  • Taluka Palghar
  • Village Umroli
  • Original Completion 31 December 2025
  • Revised Completion 31 March 2027
  • Project Area (in Sq.mt.) 2,722.41
  • Total Buildings/Towers 3
  • Documents 11 Verified
Timeline

Project Timeline & Completion Details

Key statutory dates from registration through proposed completion and permit validity.

Proposed Start 25 March 2022 Expected commencement of civil works and foundation on site.
Original Completion 31 December 2025 Mandated date for project handover to the allottees and final compliance filing.
Revised Completion 31 March 2027 No revision filed against the original committed handover date.
Promoter

Promoter, Organisation & Member Details

Declared promoter entity, address and corporate identifiers on file with the authority.

Organisation Type Company
Individule Name Veer Global Infraconstruction Limited
Experience Details
Project NameAddressLand AreaProject StatusType of ProjectBuild Plot CountApartment countProposed Completion DateProject End DateLitigation PresentLitigation Details
VEER 2S NO 154 185 187 VILLAGE UMROLI DIST PALGHAR3453.99CompletedResidential / Group Housing332021-12-302021-12-30NoNA

Promoters, Co-promoters & Members

NameRoleAddress
VIJAYBHAI BHANSHALIManaging DirectorPalghar, MAHARASHTRA

Understand this Project's RERA details

Get clear answers and additional support from our RERA experts.

RERA Banner
Buildings

Buildings, Towers & Building-Level Details

Statutory building-level disclosures including tower height, sanctioned floors, structural counts and parking areas.

Building Detail
Project Name Name No. of Open Parking No. of Closed Parking No. of Floors CC Issued No. of Habitable Floor No. of Sanctioned Apartment Wing Name
VEER 11 WING A, TYPE E 1 5 6 11 G+4 5 33 NA
VEER 11 WING B, TYPE D1 6 6 11 G+4 5 18 NA
VEER 11 WING C,TYPE C1 6 6 11 G+4 5 38 NA

Scroll horizontally to view all building-level fields. Values marked "-" were not disclosed in the source RERA record.

Inventory

Unit Inventory & Configuration Details

Configuration mix and floor-level disclosures with both grouped and raw RERA views.

Total Units 89
Configurations 4
Inventory Type RESIDENTIAL
Configuration Distribution
1 BHK 62 units · avg area 32.57 Sq.mt.
1RK 16 units · avg area 21.79 Sq.mt.
2 BHK 4 units · avg area 40.91 Sq.mt.
Shop 7 units · avg area 13.17 Sq.mt.
  • WING A, TYPE E 1
  • WING B, TYPE D1
  • WING C,TYPE C1
Floor-Wise Inventory Explorer
Apartment Type Carpet Area No. of Apartment No. of Booked Apartment
1BHK 32.61 17 0
Shop 11.62 1 0
1RK 20.86 1 0
Shop 14.08 1 0
Shop 9.46 1 0
Shop 14.35 1 0
1BHK 33.07 4 0
Shop 11.89 1 0
Shop 15.4 2 0
1BHK 33.26 4 0
Development

Development Works & Common Area Disclosures

Project-level common infrastructure disclosures as reported by the developer to the RERA authority.

Internal Roads & Footpaths 80.0% Water Supply 70.0% Sewerage (Chamber, Lines, Septic Tank , Stp) 75.0%
Storm Water Drains % not reported Landscaping & Tree Planting % not reported Street Lighting 70.0%
Community Buildings % not reported Treatment And Disposal Of Sewage And Sullage Water % not reported Solid Waste Management And Disposal % not reported
Water Conservation /Rain Water Harvesting 50.0% Energy Managemcnt % not reported Fire Protection And Fire Safety Requirements % not reported
Electrical Meter Room, Sub-station, Receiving Station 65.0% Aggregate Area Of Recreational Open Space 60.0% Open Parking 65.0%
Activity

Building Activity Progress

Statutory activity-wise construction progress as declared by the developer, per building/tower.

  • WING A, TYPE E 1
  • WING B, TYPE D1
  • WING C,TYPE C1
WING A, TYPE E 1 · Overall Progress 76%
Excavation
Complete
% Work100%
Basement (if any)
Not Started
% Work0%
Podiums (if any)
Not Started
% Work0%
Plinth
Complete
% Work100%
Stilt Floor
Complete
% Work100%
Slabs of Super Structure
Complete
% Work100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Complete
% Work100%
Sanitary Fittings within the flats / premises
In Progress
% Work87%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
In Progress
% Work83%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
In Progress
% Work78%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
In Progress
% Work84%
Documents

RERA Documents & Filings

All statutory documents uploaded by the promoter to the authority portal.

Mh Certificate Pdf
Mh Extension Certificate Pdf
Mh Details Html
50 Form 2A (FY 2024 2025).Pdf
51 Form 2A (FY 2023 2024).Pdf
52 Form 2A (FY 2021 2022).Pdf
53 Form 2A (FY 2022 2023).Pdf
54 Form 5 (FY 2024 2025).Pdf
55 Form 5 (FY 2021 2022).Pdf
56 Form 5 (FY 2022 2023).Pdf
57 Form 5 (FY 2023 2024).Pdf
Bank

Bank & Cost Disclosure

Declared project cost and the designated escrow account on file.

Project Account Bank UNION BANK OF INDIA
IFSC UBIN0564401
Branch Address NALASOPARA