Albin Sweet Homes RERA Details - P51700030834, Thane

View the RERA registration, promoter, approval, building, inventory, document and construction-progress disclosures for Albin Sweet Homes under registration P51700030834 in Thane, Maharashtra. Data is sourced from rera.mh.

RERA

RERA Snapshot

The most important statutory project disclosures, generated dynamically from available RERA fields.

  • RERA Number P51700030834
  • Project Name ALBIN DEVELOPERS
  • Project Type Residential / Group Housing
  • Project Status Ready to Move
  • State Maharashtra
  • District Thane
  • Taluka Kalyan
  • Village Kamba
  • Original Completion 15 June 2024
  • Revised Completion 15 June 2025
  • Project Area (in Sq.mt.) 3,350.0
  • Total Buildings/Towers 1
  • Documents 51 Verified
Timeline

Project Timeline & Completion Details

Key statutory dates from registration through proposed completion and permit validity.

Proposed Start 20 September 2021 Expected commencement of civil works and foundation on site.
Original Completion 15 June 2024 Mandated date for project handover to the allottees and final compliance filing.
Revised Completion 15 June 2025 No revision filed against the original committed handover date.
Promoter

Promoter, Organisation & Member Details

Declared promoter entity, address and corporate identifiers on file with the authority.

Organisation Type Individual

Understand this Project's RERA details

Get clear answers and additional support from our RERA experts.

RERA Banner
Buildings

Buildings, Towers & Building-Level Details

Statutory building-level disclosures including tower height, sanctioned floors, structural counts and parking areas.

Building Detail
Project Name Name No. of Open Parking No. of Closed Parking No. of Floors No. of Habitable Floor No. of Sanctioned Apartment Wing Name
ALBIN DEVELOPERS SWEET HOMES 1 0 5 0 0 NA

Scroll horizontally to view all building-level fields. Values marked "-" were not disclosed in the source RERA record.

Inventory

Unit Inventory & Configuration Details

Configuration mix and floor-level disclosures with both grouped and raw RERA views.

Total Units 90
Configurations 3
Inventory Type RESIDENTIAL
Configuration Distribution
1 BHK 51 units · avg area 30.34 Sq.mt.
2 BHK 18 units · avg area 46.15 Sq.mt.
Shop 21 units · avg area 17.11 Sq.mt.
  • SWEET HOMES
Floor-Wise Inventory Explorer
Apartment Type Carpet Area No. of Apartment No. of Booked Apartment
Shop 17.29 2 1
Shop 12.91 1 1
Shop 13.83 1 1
Shop 15.63 1 1
2BHK 50.07 2 2
1BHK 29.56 4 4
1BHK 32.69 2 1
1BHK 33.89 1 0
Shop 25.04 1 1
Shop 15.25 3 3
Shop 13.55 3 2
Shop 14.53 2 2
1BHK 30.59 2 2
Shop 15.9 1 1
Shop 14.45 1 1
2BHK 45.72 12 12
2BHK 45.49 4 4
Shop 26.81 2 1
Shop 18.65 2 2
1BHK 29.89 4 4
1BHK 29.98 30 29
1BHK 33.28 2 1
Shop 20.69 1 1
1BHK 30.56 6 5
Development

Development Works & Common Area Disclosures

Project-level common infrastructure disclosures as reported by the developer to the RERA authority.

Internal Roads & Footpaths % not reported Water Supply % not reported Sewerage (Chamber, Lines, Septic Tank , Stp) % not reported
Storm Water Drains % not reported Landscaping & Tree Planting % not reported Street Lighting % not reported
Community Buildings % not reported Treatment And Disposal Of Sewage And Sullage Water % not reported Solid Waste Management And Disposal % not reported
Water Conservation /Rain Water Harvesting % not reported Energy Managemcnt % not reported Fire Protection And Fire Safety Requirements 50.0%
Electrical Meter Room, Sub-station, Receiving Station 50.0% Aggregate Area Of Recreational Open Space % not reported Open Parking % not reported
Activity

Building Activity Progress

Statutory activity-wise construction progress as declared by the developer, per building/tower.

  • SWEET HOMES
SWEET HOMES · Overall Progress 81%
Plinth
Complete
% Work100%
Stilt Floor
Not Started
% Work0%
Excavation
Complete
% Work100%
Basement (if any)
Complete
% Work100%
Podiums (if any)
Not Started
% Work0%
Slabs of Super Structure
Complete
% Work100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
In Progress
% Work98%
Sanitary Fittings within the flats / premises
In Progress
% Work97%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
In Progress
% Work96%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
In Progress
% Work98%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
In Progress
% Work98%
Documents

RERA Documents & Filings

All statutory documents uploaded by the promoter to the authority portal.

Mh Certificate Pdf
Mh Extension Certificate Pdf
Mh Details Html
1 1 PAN Card.Pdf
2 1 Copy Of The Legal Title Report.Pdf
3 1 Details Of Encumbrances.Pdf
4 1 Copy Of Layout Approval (In Case Of Layout).Pdf
5 1 Building Plan Approval NA Order For Plotted Development.Pdf
6 1 Commencement Certificates NA Order For Plotted Development.Pdf
7 1 Declaration About Commencement Certificate.Pdf
8 1 Declaration In FORM B.Pdf
9 1 Architect’S Certificate Of Percentage Of Completion Of Work (Form 1).Pdf
10 2 Architect’S Certificate Of Percentage Of Completion Of Work (Form 1).Pdf
11 1 Engineer’S Certificate On Cost Incurred On Project (Form 2).Pdf
12 2 Engineer’S Certificate On Cost Incurred On Project (Form 2).Pdf
13 1 CA Certificate On Project Cost & Fund Withdrawal (Form 3).Pdf
14 2 CA Certificate On Project Cost & Fund Withdrawal (Form 3).Pdf
15 1 Annual Audit Report Of Statutory CA (Form 5) (FY 2020 21).Pdf
16 1 Annual Audit Report Of Statutory CA (Form 5) (FY 2021 22).Pdf
17 1 Proforma Of Allotment Letter.Pdf
18 1 Occupancy Certificate Completion Certificate Architect'S Certificate Of Completion For Plotted Development.Pdf
22 3 Architect’S Certificate Of Percentage Of Completion Of Work (Form 1).Pdf
23 4 Architect’S Certificate Of Percentage Of Completion Of Work (Form 1).Pdf
24 5 Architect’S Certificate Of Percentage Of Completion Of Work (Form 1).Pdf
25 6 Architect’S Certificate Of Percentage Of Completion Of Work (Form 1).Pdf
26 7 Architect’S Certificate Of Percentage Of Completion Of Work (Form 1).Pdf
27 8 Architect’S Certificate Of Percentage Of Completion Of Work (Form 1).Pdf
28 9 Architect’S Certificate Of Percentage Of Completion Of Work (Form 1).Pdf
29 10 Architect’S Certificate Of Percentage Of Completion Of Work (Form 1).Pdf
30 8 CA Certificate On Project Cost & Fund Withdrawal (Form 3).Pdf
31 10 CA Certificate On Project Cost & Fund Withdrawal (Form 3).Pdf
32 9 CA Certificate On Project Cost & Fund Withdrawal (Form 3).Pdf
33 7 CA Certificate On Project Cost & Fund Withdrawal (Form 3).Pdf
34 6 CA Certificate On Project Cost & Fund Withdrawal (Form 3).Pdf
35 4 CA Certificate On Project Cost & Fund Withdrawal (Form 3).Pdf
36 3 CA Certificate On Project Cost & Fund Withdrawal (Form 3).Pdf
39 5 CA Certificate On Project Cost & Fund Withdrawal (Form 3).Pdf
40 6 Engineer’S Certificate On Cost Incurred On Project (Form 2).Pdf
41 10 Engineer’S Certificate On Cost Incurred On Project (Form 2).Pdf
42 9 Engineer’S Certificate On Cost Incurred On Project (Form 2).Pdf
43 8 Engineer’S Certificate On Cost Incurred On Project (Form 2).Pdf
44 7 Engineer’S Certificate On Cost Incurred On Project (Form 2).Pdf
45 5 Engineer’S Certificate On Cost Incurred On Project (Form 2).Pdf
46 4 Engineer’S Certificate On Cost Incurred On Project (Form 2).Pdf
47 3 Engineer’S Certificate On Cost Incurred On Project (Form 2).Pdf
50 1 Disclosure Of Sold Booked Inventory.Pdf
51 1 Engineers Certificate On Quality Assurance (Form 2A FY 2022 23).Pdf
52 1 Annual Audit Report Of Statutory CA (Form 5) (FY 2022 23).Pdf
53 1 Engineers Certificate On Quality Assurance (Form 2A FY 2023 24).Pdf
54 1 Annual Audit Report Of Statutory CA (Form 5) (FY 2023 24).Pdf
62 2 Disclosure Of Sold Booked Inventory.Pdf
Bank

Bank & Cost Disclosure

Declared project cost and the designated escrow account on file.

Project Account Bank FEDERAL BANK
IFSC FDRL0001616
Branch Address ULHASNAGR
Country/City