  • RERA Number P51700008385
  • Project Name SHREEPATI RESIDENCY
  • Project Type Residential / Group Housing
  • Project Status Ready to Move
  • State Maharashtra
  • District Thane
  • Taluka Thane
  • Village Thane (M Corp.)
  • Original Completion 31 December 2018
  • Revised Completion 30 September 2026
  • Project Area (in Sq.mt.) 8,070.0
  • Total Buildings/Towers 2
  • Documents 34 Verified
Timeline

Project Timeline & Completion Details

Key statutory dates from registration through proposed completion and permit validity.

Proposed Start 18 August 2017 Expected commencement of civil works and foundation on site.
Original Completion 31 December 2018 Mandated date for project handover to the allottees and final compliance filing.
Revised Completion 30 September 2026 No revision filed against the original committed handover date.
Promoter

Promoter, Organisation & Member Details

Declared promoter entity, address and corporate identifiers on file with the authority.

Organisation Type Individual

Understand this Project's RERA details

Get clear answers and additional support from our RERA experts.

RERA Banner
Buildings

Buildings, Towers & Building-Level Details

Statutory building-level disclosures including tower height, sanctioned floors, structural counts and parking areas.

Building Detail
Project Name Name No. of Open Parking No. of Closed Parking No. of Floors No. of Habitable Floor No. of Sanctioned Apartment Wing Name
SHREEPATI RESIDENCY SHREEPATI RESIDENCY C 60 63 20 0 0 NA
SHREEPATI RESIDENCY SHREEPATI RESIDENCY B2 63 57 19 0 0 NA

Scroll horizontally to view all building-level fields. Values marked "-" were not disclosed in the source RERA record.

Inventory

Unit Inventory & Configuration Details

Configuration mix and floor-level disclosures with both grouped and raw RERA views.

Total Units 129
Configurations 3
Inventory Type RESIDENTIAL
Configuration Distribution
1 BHK 67 units · avg area 42.70 Sq.mt.
2 BHK 32 units · avg area 59.71 Sq.mt.
5 BHK 30 units · avg area 50.69 Sq.mt.
  • SHREEPATI RESIDENCY C
  • SHREEPATI RESIDENCY B2
Floor-Wise Inventory Explorer
Apartment Type Carpet Area No. of Apartment No. of Booked Apartment
1BHK 43.25 33 24
1BHK 42.16 34 31
Development

Development Works & Common Area Disclosures

Project-level common infrastructure disclosures as reported by the developer to the RERA authority.

Internal Roads & Footpaths 98.0% Water Supply 100.0% Sewerage (Chamber, Lines, Septic Tank , Stp) 98.0%
Storm Water Drains 98.0% Landscaping & Tree Planting 98.0% Street Lighting % not reported
Community Buildings % not reported Treatment And Disposal Of Sewage And Sullage Water % not reported Solid Waste Management And Disposal % not reported
Water Conservation /Rain Water Harvesting 100.0% Energy Managemcnt % not reported Fire Protection And Fire Safety Requirements 98.0%
Electrical Meter Room, Sub-station, Receiving Station 100.0% Aggregate Area Of Recreational Open Space % not reported Open Parking 90.0%
Activity

Building Activity Progress

Statutory activity-wise construction progress as declared by the developer, per building/tower.

  • SHREEPATI RESIDENCY C
  • SHREEPATI RESIDENCY B2
SHREEPATI RESIDENCY C · Overall Progress 99%
Plinth
Complete
% Work100%
Stilt Floor
Complete
% Work100%
Excavation
Complete
% Work100%
Basement (if any)
Complete
% Work100%
Podiums (if any)
Complete
% Work100%
Slabs of Super Structure
Complete
% Work100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Complete
% Work100%
Sanitary Fittings within the flats / premises
In Progress
% Work98%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
In Progress
% Work98%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
In Progress
% Work98%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
In Progress
% Work98%
Documents

RERA Documents & Filings

All statutory documents uploaded by the promoter to the authority portal.

Mh Certificate Pdf
Mh Extension Certificate Pdf
Mh Details Html
1 1 PAN Card.Pdf
2 1 Copy Of The Legal Title Report.Pdf
3 2 Copy Of The Legal Title Report.Pdf
4 1 Details Of Encumbrances.Pdf
5 2 Details Of Encumbrances.Pdf
6 3 Details Of Encumbrances.Pdf
7 1 Copy Of Layout Approval (In Case Of Layout).Pdf
8 1 Building Plan Approval (IOD).Pdf
9 2 Building Plan Approval (IOD).Pdf
10 3 Building Plan Approval (IOD).Pdf
11 4 Building Plan Approval (IOD).Pdf
12 5 Building Plan Approval (IOD).Pdf
13 6 Building Plan Approval (IOD).Pdf
14 1 Commencement Certificates NA Order For Plotted Development.Pdf
15 1 Declaration About Commencement Certificate.Pdf
16 1 Declaration In FORM B.Pdf
17 1 Certificates Of Architect (Form 1)(Mandatory For Only Ongoing Project).Pdf
18 2 Certificates Of Architect (Form 1)(Mandatory For Only Ongoing Project).Pdf
19 1 Certificates Of Engineer (Form 2)(Mandatory For Only Ongoing Project).Pdf
20 1 Engineers Certificate On Quality Assurance (Form 2A FY 2019 20).Pdf
21 1 Engineers Certificate On Quality Assurance (Form 2A FY 2020 21).Pdf
22 1 Disclosure Of Sold Booked Inventory.Pdf
23 1 CERSAI Details.Pdf
24 1 Certificates Of CA (Form 3).Pdf
25 1 Certificates Of CA (Form 5).Pdf
26 1 Annual Audit Report Of Statutory CA (Form 5) (FY 2018 19).Pdf
27 1 Annual Audit Report Of Statutory CA (Form 5) (FY 2019 20).Pdf
28 1 Proforma Of Allotment Letter.Pdf
31 1 Engineers Certificate On Quality Assurance (Form 2A FY 2021 22).Pdf
32 1 Engineers Certificate On Quality Assurance (Form 2A FY 2022 23).Pdf
33 1 Engineers Certificate On Quality Assurance (Form 2A FY 2023 24).Pdf
Bank

Bank & Cost Disclosure

Declared project cost and the designated escrow account on file.

Project Account Bank CENTRAL BANK OF INDIA
IFSC CBIN0280637
Branch Address PLOT NO 383/384 PARADISE HEIGHTS , STATION ROAD 400601
Country/City