residential Ready to Move Source: rera.mh

Lote Pandurang Smruti RERA Details - P51700013381, Thane

View the RERA registration, promoter, approval, building, inventory, document and construction-progress disclosures for Lote Pandurang Smruti under registration P51700013381 in Thane, Maharashtra. Data is sourced from rera.mh.

RERA

RERA Snapshot

The most important statutory project disclosures, generated dynamically from available RERA fields.

  • RERA Number P51700013381
  • Project Name Pandurang smruti
  • Project Type Others
  • Project Status Ready to Move
  • State Maharashtra
  • District Thane
  • Taluka Kalyan
  • Village Dawadi
  • Original Completion 05 July 2019
  • Revised Completion 30 June 2020
  • Project Area (in Sq.mt.) 800.0
  • Total Buildings/Towers 1
  • Documents 28 Verified
Timeline

Project Timeline & Completion Details

Key statutory dates from registration through proposed completion and permit validity.

Proposed Start 04 October 2017 Expected commencement of civil works and foundation on site.
Original Completion 05 July 2019 Mandated date for project handover to the allottees and final compliance filing.
Revised Completion 30 June 2020 No revision filed against the original committed handover date.
Promoter

Promoter, Organisation & Member Details

Declared promoter entity, address and corporate identifiers on file with the authority.

Organisation Type Others
Individule Name Lote Constructions

Promoters, Co-promoters & Members

NameAddress
Shri Gurunath Pandurang LoteThane, MAHARASHTRA

Understand this Project's RERA details

Get clear answers and additional support from our RERA experts.

RERA Banner
Buildings

Buildings, Towers & Building-Level Details

Statutory building-level disclosures including tower height, sanctioned floors, structural counts and parking areas.

Building Detail
Project Name Name No. of Open Parking No. of Closed Parking No. of Floors No. of Habitable Floor No. of Sanctioned Apartment Wing Name
Pandurang smruti Pandurang smruti 2 1 10 0 0 NA

Scroll horizontally to view all building-level fields. Values marked "-" were not disclosed in the source RERA record.

Development

Development Works & Common Area Disclosures

Project-level common infrastructure disclosures as reported by the developer to the RERA authority.

Internal Roads & Footpaths % not reported Water Supply 100.0% Sewerage (Chamber, Lines, Septic Tank , Stp) 100.0%
Storm Water Drains 100.0% Landscaping & Tree Planting 100.0% Street Lighting 100.0%
Community Buildings % not reported Treatment And Disposal Of Sewage And Sullage Water % not reported Solid Waste Management And Disposal % not reported
Water Conservation /Rain Water Harvesting 100.0% Energy Managemcnt 100.0% Fire Protection And Fire Safety Requirements 100.0%
Electrical Meter Room, Sub-station, Receiving Station 100.0% Aggregate Area Of Recreational Open Space % not reported Open Parking 100.0%
Lift And Cc Tv Coverages 100.0% Main Door And Bedroom Door Of The Apartment With Laminated Decorative Sheet High Quality Fixtures Wi 100.0% Parking In The Common Open Space 100.0%
Powder Coated Heavy Section Aluminium Windows With Marble Sills 100.0% Virtrified Flooring In Living Area Bedroom And Kitchen 100.0% Granite Kitchen Platform With Stainless Sink With Colour Glazed Tiles On Dado 100.0%
Further Common Space Is The Entrance Lobby Electric Meter Cabin Staircase Passage Area On Each Floor 100.0% Concealed Fire Proof Electrification Extensive Layout In All Rooms Enabled By Modular Swithches With 100.0% Common Open Space Is 14 Feet Wide Space On South Side From The Wall Of The Bldg To The Compund Wall 100.0%
Access Gate To Pandurang Smruti Bldg Is Through The Gate At The South Side Of The Bldg Alone 100.0%
Activity

Building Activity Progress

Statutory activity-wise construction progress as declared by the developer, per building/tower.

  • Pandurang smruti
Pandurang smruti · Overall Progress 83%
Excavation
Complete
% Work100%
Basement (if any)
Complete
% Work100%
Podiums (if any)
Not Started
% Work0%
Plinth
Complete
% Work100%
Stilt Floor
Complete
% Work100%
Slabs of Super Structure
In Progress
% Work8%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Complete
% Work100%
Sanitary Fittings within the flats / premises
Complete
% Work100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Complete
% Work100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Complete
% Work100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Complete
% Work100%
Documents

RERA Documents & Filings

All statutory documents uploaded by the promoter to the authority portal.

Mh Certificate Pdf
Mh Extension Certificate Pdf
Mh Details Html
1 1 PAN Card.Pdf
2 1 Copy Of The Legal Title Report.Pdf
3 1 Details Of Encumbrances.Pdf
4 1 Copy Of Layout Approval (In Case Of Layout).Pdf
5 2 Copy Of Layout Approval (In Case Of Layout).Pdf
6 1 Building Plan Approval (IOD).Pdf
7 1 Commencement Certificates NA Order For Plotted Development.Pdf
8 2 Commencement Certificates NA Order For Plotted Development.Pdf
9 3 Commencement Certificates NA Order For Plotted Development.Pdf
10 1 Declaration In FORM B.Pdf
11 1 Certificates Of Architect (Form 1)(Mandatory For Only Ongoing Project).Pdf
12 2 Certificates Of Architect (Form 1)(Mandatory For Only Ongoing Project).Pdf
13 3 Certificates Of Architect (Form 1)(Mandatory For Only Ongoing Project).Pdf
14 1 Certificates Of Engineer (Form 2)(Mandatory For Only Ongoing Project).Pdf
15 2 Certificates Of Engineer (Form 2)(Mandatory For Only Ongoing Project).Pdf
16 3 Certificates Of Engineer (Form 2)(Mandatory For Only Ongoing Project).Pdf
17 1 Certificates Of CA (Form 3).Pdf
18 1 Certificates Of CA (Form 5).Pdf
19 2 Certificates Of CA (Form 5).Pdf
20 1 Proforma Of Allotment Letter.Pdf
21 1 Proforma Of Agreement For Sale.Pdf
22 2 Proforma Of Allotment Letter.Pdf
23 1 Occupancy Certificate Completion Certificate Architect'S Certificate Of Completion For Plotted Development.Pdf
24 1 Status Of Formation Of Legal Entity (Society Co Op Etc.).Pdf
25 1 Other.Pdf
Bank

Bank & Cost Disclosure

Declared project cost and the designated escrow account on file.

Project Account Bank KARUR VYSYA BANK
IFSC KVBL0002131
Branch Address Shop no 3 4 5 Ketkar Residency Tilak Road Off Phadke Rd Dombivli East 421201
Country/City