Squareyards Logo
Blogs
Sell or Rent Property
Login
Rera Banner
residential Ready to Move Source: rera.mh

Pallavi Palace RERA Details - P51700053155, Thane

View the RERA registration, promoter, approval, building, inventory, document and construction-progress disclosures for Pallavi Palace under registration P51700053155 in Thane, Maharashtra. Data is sourced from rera.mh.

RERA

RERA Snapshot

The most important statutory project disclosures, generated dynamically from available RERA fields.

  • RERA Number P51700053155
  • Project Name Pallavi Palace
  • Project Type Residential / Group Housing
  • Project Status Ready to Move
  • State Maharashtra
  • District Thane
  • Taluka Kalyan
  • Village DOMBIVLI
  • Original Completion 31 March 2026
  • Revised Completion 31 March 2026
  • Project Area (in Sq.mt.) 2,910.0
  • Total Buildings/Towers 1
  • Documents 53 Verified
Timeline

Project Timeline & Completion Details

Key statutory dates from registration through proposed completion and permit validity.

Proposed Start 17 October 2023 Expected commencement of civil works and foundation on site.
Original Completion 31 March 2026 Mandated date for project handover to the allottees and final compliance filing.
Revised Completion 31 March 2026 No revision filed against the original committed handover date.
Promoter

Promoter, Organisation & Member Details

Declared promoter entity, address and corporate identifiers on file with the authority.

Organisation Type Individual

Understand this Project's RERA details

Get clear answers and additional support from our RERA experts.

RERA Banner
Buildings

Buildings, Towers & Building-Level Details

Statutory building-level disclosures including tower height, sanctioned floors, structural counts and parking areas.

Building Detail
Project Name Name No. of Open Parking No. of Closed Parking No. of Floors No. of Habitable Floor No. of Sanctioned Apartment Wing Name
Pallavi Palace Pallavi Palace 30 1 8 0 0 NA

Scroll horizontally to view all building-level fields. Values marked "-" were not disclosed in the source RERA record.

Inventory

Unit Inventory & Configuration Details

Configuration mix and floor-level disclosures with both grouped and raw RERA views.

Total Units 28
Configurations 2
Inventory Type RESIDENTIAL
Configuration Distribution
1 BHK 21 units · avg area 36.44 Sq.mt.
2 BHK 7 units · avg area 53.07 Sq.mt.
  • Pallavi Palace
Floor-Wise Inventory Explorer
Apartment Type Carpet Area No. of Apartment No. of Booked Apartment
1BHK 36.78 7 4
1BHKAlloted to Owner 36.27 1 0
2BHKAlloted to Owner 53.07 2 0
2BHK 53.07 5 1
1BHK 36.27 13 7
Development

Development Works & Common Area Disclosures

Project-level common infrastructure disclosures as reported by the developer to the RERA authority.

Internal Roads & Footpaths % not reported Water Supply 5.0% Sewerage (Chamber, Lines, Septic Tank , Stp) 5.0%
Storm Water Drains % not reported Landscaping & Tree Planting % not reported Street Lighting % not reported
Community Buildings % not reported Treatment And Disposal Of Sewage And Sullage Water % not reported Solid Waste Management And Disposal % not reported
Water Conservation /Rain Water Harvesting 5.0% Energy Managemcnt % not reported Fire Protection And Fire Safety Requirements 5.0%
Electrical Meter Room, Sub-station, Receiving Station 5.0% Aggregate Area Of Recreational Open Space % not reported Open Parking 5.0%
Activity

Building Activity Progress

Statutory activity-wise construction progress as declared by the developer, per building/tower.

  • Pallavi Palace
Pallavi Palace · Overall Progress 100%
Excavation
Complete
% Work100%
Basement (if any)
Complete
% Work100%
Podiums (if any)
Complete
% Work100%
Plinth
Complete
% Work100%
Stilt Floor
Complete
% Work100%
Slabs of Super Structure
Complete
% Work100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Complete
% Work100%
Sanitary Fittings within the flats / premises
Complete
% Work100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Complete
% Work100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Complete
% Work100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Complete
% Work100%
Documents

RERA Documents & Filings

All statutory documents uploaded by the promoter to the authority portal.

Mh Certificate Pdf
Mh Details Html
1 1 PAN Card.Pdf
2 1 Copy Of The Legal Title Report.Pdf
3 2 Copy Of The Legal Title Report.Pdf
4 3 Copy Of The Legal Title Report.Pdf
5 4 Copy Of The Legal Title Report.Pdf
6 5 Copy Of The Legal Title Report.Pdf
7 6 Copy Of The Legal Title Report.Pdf
8 7 Copy Of The Legal Title Report.Pdf
9 1 A Details Of Encumbrances Concerned To Finance.Pdf
10 2 A Details Of Encumbrances Concerned To Finance.Pdf
11 3 A Details Of Encumbrances Concerned To Finance.Pdf
12 1 B Details Of Encumbrances Concerned To Legal.Pdf
13 2 B Details Of Encumbrances Concerned To Legal.Pdf
14 3 B Details Of Encumbrances Concerned To Legal.Pdf
15 1 Copy Of Layout Approval (In Case Of Layout).Pdf
16 2 Copy Of Layout Approval (In Case Of Layout).Pdf
17 1 Building Plan Approval NA Order For Plotted Development.Pdf
18 2 Building Plan Approval NA Order For Plotted Development.Pdf
19 1 Commencement Certificates NA Order For Plotted Development.Pdf
20 1 Declaration About Commencement Certificate.Pdf
21 1 Declaration In FORM B.Pdf
22 2 Declaration In FORM B.Pdf
23 3 Declaration In FORM B.Pdf
24 1 Architect’S Certificate Of Percentage Of Completion Of Work (Form 1).Pdf
25 1 Engineer’S Certificate On Cost Incurred On Project (Form 2).Pdf
26 1 CERSAI Details.Pdf
27 1 CA Certificate On Project Cost & Fund Withdrawal (Form 3).Pdf
28 1 Disclosure Of Interest In Other Real Estate Organizations.Pdf
29 1 Proforma Of Agreement For Sale.Pdf
30 1 Proforma Of Allotment Letter.Pdf
31 1 Separate Bank Account Details Including No Encumbrances On The Bank Account Or No Escrow On The Same.Pdf
32 1 Deviation Report With Respect To Allotment Letter.Pdf
33 1 Deviation Report With Respect To Model Copy Of Agreement.Pdf
37 2 Architect’S Certificate Of Percentage Of Completion Of Work (Form 1).Pdf
38 3 Architect’S Certificate Of Percentage Of Completion Of Work (Form 1).Pdf
40 2 CA Certificate On Project Cost & Fund Withdrawal (Form 3).Pdf
41 3 CA Certificate On Project Cost & Fund Withdrawal (Form 3).Pdf
42 4 CA Certificate On Project Cost & Fund Withdrawal (Form 3).Pdf
44 2 Engineer’S Certificate On Cost Incurred On Project (Form 2).Pdf
45 3 Engineer’S Certificate On Cost Incurred On Project (Form 2).Pdf
46 1 Disclosure Of Sold Booked Inventory.Pdf
47 2 Disclosure Of Sold Booked Inventory.Pdf
48 3 Disclosure Of Sold Booked Inventory.Pdf
49 4 Disclosure Of Sold Booked Inventory.Pdf
50 1 Annual Audit Report Of Statutory CA (Form 5) (FY 2023 24).Pdf
54 4 Architect’S Certificate Of Percentage Of Completion Of Work (Form 1).Pdf
55 5 Architect’S Certificate Of Percentage Of Completion Of Work (Form 1).Pdf
56 6 Architect’S Certificate Of Percentage Of Completion Of Work (Form 1).Pdf
60 4 Engineer’S Certificate On Cost Incurred On Project (Form 2).Pdf
61 5 Engineer’S Certificate On Cost Incurred On Project (Form 2).Pdf
63 1 Occupancy Certificate Completion Certificate Architect'S Certificate Of Completion For Plotted Development.Pdf
Bank

Bank & Cost Disclosure

Declared project cost and the designated escrow account on file.

Project Account Bank STATE BANK OF INDIA
IFSC SBIN0063845
Branch Address 001 madhusudan Residency MIDC Rd Cholegaon Thakurli 421201
Country/City