Squareyards Logo
Blogs
Sell or Rent Property
Login
Rera Banner
residential Ready to Move Source: rera.mh

Sanghvi Paradise RERA Details - P51900010903, Thane

View the RERA registration, promoter, approval, building, inventory, document and construction-progress disclosures for Sanghvi Paradise under registration P51900010903 in Thane, Maharashtra. Data is sourced from rera.mh.

RERA

RERA Snapshot

The most important statutory project disclosures, generated dynamically from available RERA fields.

  • RERA Number P51900010903
  • Project Name Sanghvi S3 Paradise - Phase 1
  • Project Type Residential / Group Housing
  • Project Status Ready to Move
  • State Maharashtra
  • District Mumbai City
  • Taluka Mumbai City
  • Village Mumbai City
  • Original Completion 30 December 2021
  • Revised Completion 30 December 2021
  • Project Area (in Sq.mt.) 9,490.0
  • Total Buildings/Towers 17
  • Documents 2 Verified
Timeline

Project Timeline & Completion Details

Key statutory dates from registration through proposed completion and permit validity.

Proposed Start 31 August 2017 Expected commencement of civil works and foundation on site.
Original Completion 30 December 2021 Mandated date for project handover to the allottees and final compliance filing.
Revised Completion 30 December 2021 No revision filed against the original committed handover date.
Promoter

Promoter, Organisation & Member Details

Declared promoter entity, address and corporate identifiers on file with the authority.

Organisation Type Company
Individule Name Sanghvi Premises Pvt Ltd
Experience Details
Project NameAddressLand AreaProject StatusType of ProjectBuild Plot CountApartment countProposed Completion DateProject End DateLitigation PresentLitigation Details
Sanghvi S3 Ecocity SpringNear Hermitage Society Behind Thakur Mall Near Dahisar Check Post Dahisar East3745CompletedIndustrial32262015-12-312016-04-26NoNA
Shree Mohankheda HeightsRambhau Bhogale Marg Ghodapdeo Mumbai 400 0332229.95CompletedIndustrial1602014-12-312014-03-28NoNA
Sanghvi Nisarg Phase 1Khondgewadi Road Raywood Park Colony Lonavla5261CompletedResidential / Group Housing3442011-03-312015-12-28NoNA
Sanghvi Nisarg Phase 2Khondgewadi Raywood Park Colony Lonavla1040CompletedResidential / Group Housing1122015-09-302015-07-09NoNA
Sanghvi Galaxy10th Khetwadi Lane Girgaon Mumbai1627.19CompletedIndustrial1342017-12-312012-11-12NoNA

Understand this Project's RERA details

Get clear answers and additional support from our RERA experts.

RERA Banner
Buildings

Buildings, Towers & Building-Level Details

Statutory building-level disclosures including tower height, sanctioned floors, structural counts and parking areas.

Building Detail
Project Name Name No. of Open Parking No. of Closed Parking No. of Floors No. of Habitable Floor No. of Sanctioned Apartment Wing Name
Sanghvi S3 Paradise - Phase 1 Aspen A Wing 0 0 4 0 0 NA
Sanghvi S3 Paradise - Phase 1 Aspen B Wing 0 0 5 0 0 NA
Sanghvi S3 Paradise - Phase 1 Aspen C Wing 0 0 4 0 0 NA
Sanghvi S3 Paradise - Phase 1 Aviva 0 0 4 0 0 NA
Sanghvi S3 Paradise - Phase 1 Hazel A Wing 0 0 4 0 0 NA
Sanghvi S3 Paradise - Phase 1 Hazel B Wing 0 0 4 0 0 NA
Sanghvi S3 Paradise - Phase 1 Avon A Wing 0 0 4 0 0 NA
Sanghvi S3 Paradise - Phase 1 Avon B Wing 0 0 4 0 0 NA
Sanghvi S3 Paradise - Phase 1 Aura A Wing 0 0 4 0 0 NA
Sanghvi S3 Paradise - Phase 1 Aura B Wing 0 0 4 0 0 NA
Sanghvi S3 Paradise - Phase 1 Cosmo A Wing 0 0 5 0 0 NA
Sanghvi S3 Paradise - Phase 1 Cosmo B Wing 0 0 5 0 0 NA
Sanghvi S3 Paradise - Phase 1 Cosmo C Wing 0 0 5 0 0 NA
Sanghvi S3 Paradise - Phase 1 Cosmo D Wing 0 0 5 0 0 NA
Sanghvi S3 Paradise - Phase 1 Cosmo E Wing 0 0 5 0 0 NA
Sanghvi S3 Paradise - Phase 1 Coral A Wing 0 0 4 0 0 NA
Sanghvi S3 Paradise - Phase 1 Coral B Wing 0 0 4 0 0 NA

Scroll horizontally to view all building-level fields. Values marked "-" were not disclosed in the source RERA record.

Inventory

Unit Inventory & Configuration Details

Configuration mix and floor-level disclosures with both grouped and raw RERA views.

Total Units 282
Configurations 2
Inventory Type RESIDENTIAL
Configuration Distribution
1 BHK 194 units · avg area 30.61 Sq.mt.
2 BHK 88 units · avg area 42.18 Sq.mt.
  • Aspen A Wing
  • Aspen B Wing
  • Aspen C Wing
  • Aviva
  • Hazel A Wing
  • Hazel B Wing
  • Avon A Wing
  • Avon B Wing
  • Aura A Wing
  • Aura B Wing
  • Cosmo A Wing
  • Cosmo B Wing
  • Cosmo C Wing
  • Cosmo D Wing
  • Cosmo E Wing
  • Coral A Wing
  • Coral B Wing
Floor-Wise Inventory Explorer
Apartment Type Carpet Area No. of Apartment No. of Booked Apartment
1 BHK 23.62 4 4
1 BHK 34.96 2 2
1 BHK 38.41 4 4
1 BHK 38.74 2 2
1 BHK 28.54 2 2
Development

Development Works & Common Area Disclosures

Project-level common infrastructure disclosures as reported by the developer to the RERA authority.

Community Buildings % not reported Internal Roads & Footpaths 70.0% Water Supply 50.0%
Sewerage (Chamber, Lines, Septic Tank , Stp) 70.0% Storm Water Drains 70.0% Landscaping & Tree Planting 50.0%
Street Lighting 50.0% Treatment And Disposal Of Sewage And Sullage Water % not reported Solid Waste Management And Disposal % not reported
Water Conservation /Rain Water Harvesting % not reported Energy Managemcnt % not reported Fire Protection And Fire Safety Requirements % not reported
Electrical Meter Room, Sub-station, Receiving Station 80.0% Aggregate Area Of Recreational Open Space % not reported Open Parking % not reported
Activity

Building Activity Progress

Statutory activity-wise construction progress as declared by the developer, per building/tower.

  • Aspen A Wing
  • Aspen B Wing
  • Aspen C Wing
  • Aviva
  • Hazel A Wing
  • Hazel B Wing
  • Avon A Wing
  • Avon B Wing
  • Aura A Wing
  • Aura B Wing
  • Cosmo A Wing
  • Cosmo B Wing
  • Cosmo C Wing
  • Cosmo D Wing
  • Cosmo E Wing
  • Coral A Wing
  • Coral B Wing
Aspen A Wing · Overall Progress 82%
Excavation
Complete
% Work100%
Basement (if any)
Complete
% Work100%
Podiums (if any)
Not Started
% Work0%
Plinth
Complete
% Work100%
Stilt Floor
Not Started
% Work0%
Slabs of Super Structure
Complete
% Work100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Complete
% Work100%
Sanitary Fittings within the flats / premises
Complete
% Work100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Complete
% Work100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Complete
% Work100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Complete
% Work100%
Documents

RERA Documents & Filings

All statutory documents uploaded by the promoter to the authority portal.

Mh Certificate Pdf
Mh Details Html
Bank

Bank & Cost Disclosure

Declared project cost and the designated escrow account on file.

Project Account Bank ICICI BANK LIMITED
IFSC ICIC0001071
Branch Address Mazgaon Mumbai
Country/City