Squareyards Logo
Blogs
Sell or Rent Property
Login
Rera Banner
residential Ready to Move Source: rera.mh

Shankheshwar Platina RERA Details - P51700029221, Thane

View the RERA registration, promoter, approval, building, inventory, document and construction-progress disclosures for Shankheshwar Platina under registration P51700029221 in Thane, Maharashtra. Data is sourced from rera.mh.

RERA

RERA Snapshot

The most important statutory project disclosures, generated dynamically from available RERA fields.

  • RERA Number P51700029221
  • Project Name SHANKHESHWAR PLATINA
  • Project Type Others
  • Project Status Ready to Move
  • State Maharashtra
  • District Thane
  • Taluka Kalyan
  • Village Kalyan-Dombivali (M Corp.)
  • Original Completion 31 March 2025
  • Revised Completion 31 March 2025
  • Project Area (in Sq.mt.) 3,030.0
  • Total Buildings/Towers 1
  • Documents 72 Verified
Timeline

Project Timeline & Completion Details

Key statutory dates from registration through proposed completion and permit validity.

Proposed Start 10 May 2021 Expected commencement of civil works and foundation on site.
Original Completion 31 March 2025 Mandated date for project handover to the allottees and final compliance filing.
Revised Completion 31 March 2025 No revision filed against the original committed handover date.
Promoter

Promoter, Organisation & Member Details

Declared promoter entity, address and corporate identifiers on file with the authority.

Organisation Type Partnership
Individule Name SHANKHESHWAR KREATERS
Experience Details
Project NameAddressLand AreaProject StatusType of ProjectBuild Plot CountApartment countProposed Completion DateProject End DateLitigation PresentLitigation Details
SHANKHESHWAR PALLAZOSECTOR 9 PLOT NO 182 ULWE NAVI MUMBAI2699.87CompletedIndustrial11132015-12-312015-12-15NoNA
SHANKHESHWAR PRESIDENCY IIGAURIPADA TALUKA KALYAN650CompletedResidential / Group Housing2652014-05-312014-03-27NoNA

Promoters, Co-promoters & Members

NameRoleAddress
SAMPATRAJ SANTOKCHAND MEHTAPartnerThane, MAHARASHTRA
JANVI DINESH MEHTAPartnerThane, MAHARASHTRA

Understand this Project's RERA details

Get clear answers and additional support from our RERA experts.

RERA Banner
Buildings

Buildings, Towers & Building-Level Details

Statutory building-level disclosures including tower height, sanctioned floors, structural counts and parking areas.

Building Detail
Project Name Name No. of Open Parking No. of Closed Parking No. of Floors No. of Habitable Floor No. of Sanctioned Apartment Wing Name
SHANKHESHWAR PLATINA BUILDING WING A SHANKHESHWAR PLATINA 104 50 16 0 0 NA

Scroll horizontally to view all building-level fields. Values marked "-" were not disclosed in the source RERA record.

Inventory

Unit Inventory & Configuration Details

Configuration mix and floor-level disclosures with both grouped and raw RERA views.

Total Units 139
Configurations 3
Inventory Type RESIDENTIAL
Configuration Distribution
1 BHK 77 units · avg area 35.50 Sq.mt.
2 BHK 59 units · avg area 47.49 Sq.mt.
Shop 3 units · avg area 84.74 Sq.mt.
  • BUILDING WING A SHANKHESHWAR PLATINA
Floor-Wise Inventory Explorer
Apartment Type Carpet Area No. of Apartment No. of Booked Apartment
1BHK 35.95 12 12
2BHK 47.92 5 5
Shop 84.51 1 0
2BHK 45.13 2 2
2BHK 45.2 1 1
2BHK 45.29 2 2
2BHK 47.22 2 2
2BHK 47.52 3 3
2BHK 48.04 2 2
2BHK 48.77 4 4
2BHK 43.89 5 5
2BHK 51.5 8 8
2BHK 47.83 2 2
1BHK 33.38 13 13
2BHK 51.63 6 6
1BHK 32.87 10 8
2BHK 44.7 2 2
2BHK 43.14 2 2
2BHK 43.58 7 7
1BHK 47.63 7 7
1BHK 35.8 16 13
Shop 78.53 1 0
Shop 91.19 1 0
1BHK 33.33 19 16
2BHK 48.45 6 5
Development

Development Works & Common Area Disclosures

Project-level common infrastructure disclosures as reported by the developer to the RERA authority.

Internal Roads & Footpaths % not reported Water Supply % not reported Sewerage (Chamber, Lines, Septic Tank , Stp) % not reported
Storm Water Drains % not reported Landscaping & Tree Planting % not reported Street Lighting % not reported
Community Buildings % not reported Treatment And Disposal Of Sewage And Sullage Water % not reported Solid Waste Management And Disposal % not reported
Water Conservation /Rain Water Harvesting % not reported Energy Managemcnt % not reported Fire Protection And Fire Safety Requirements % not reported
Electrical Meter Room, Sub-station, Receiving Station % not reported Aggregate Area Of Recreational Open Space % not reported Open Parking % not reported
Activity

Building Activity Progress

Statutory activity-wise construction progress as declared by the developer, per building/tower.

  • BUILDING WING A SHANKHESHWAR PLATINA
BUILDING WING A SHANKHESHWAR PLATINA · Overall Progress 100%
Excavation
Complete
% Work100%
Basement (if any)
Complete
% Work100%
Podiums (if any)
Complete
% Work100%
Plinth
Complete
% Work100%
Stilt Floor
Complete
% Work100%
Slabs of Super Structure
Complete
% Work100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Complete
% Work100%
Sanitary Fittings within the flats / premises
Complete
% Work100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Complete
% Work100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Complete
% Work100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Complete
% Work100%
Documents

RERA Documents & Filings

All statutory documents uploaded by the promoter to the authority portal.

Mh Certificate Pdf
Mh Details Html
1 1 PAN Card.Pdf
2 1 Copy Of The Legal Title Report.Pdf
3 2 Copy Of The Legal Title Report.Pdf
4 1 Details Of Encumbrances.Pdf
5 1 Copy Of Layout Approval (In Case Of Layout).Pdf
6 1 Building Plan Approval NA Order For Plotted Development.Pdf
7 2 Building Plan Approval NA Order For Plotted Development.Pdf
8 3 Building Plan Approval NA Order For Plotted Development.Pdf
9 4 Building Plan Approval NA Order For Plotted Development.Pdf
10 5 Building Plan Approval NA Order For Plotted Development.Pdf
11 6 Building Plan Approval NA Order For Plotted Development.Pdf
12 7 Building Plan Approval NA Order For Plotted Development.Pdf
13 8 Building Plan Approval NA Order For Plotted Development.Pdf
14 9 Building Plan Approval NA Order For Plotted Development.Pdf
15 1 Commencement Certificates NA Order For Plotted Development.Pdf
16 2 Commencement Certificates NA Order For Plotted Development.Pdf
17 1 Declaration In FORM B.Pdf
18 1 Architect’S Certificate Of Percentage Of Completion Of Work (Form 1).Pdf
19 2 Architect’S Certificate Of Percentage Of Completion Of Work (Form 1).Pdf
20 3 Architect’S Certificate Of Percentage Of Completion Of Work (Form 1).Pdf
21 4 Architect’S Certificate Of Percentage Of Completion Of Work (Form 1).Pdf
22 5 Architect’S Certificate Of Percentage Of Completion Of Work (Form 1).Pdf
23 1 Engineers Certificate On Quality Assurance (Form 2A FY 2019 20).Pdf
24 2 Engineers Certificate On Quality Assurance (Form 2A FY 2019 20).Pdf
25 1 Engineers Certificate On Quality Assurance (Form 2A FY 2020 21).Pdf
26 2 Engineers Certificate On Quality Assurance (Form 2A FY 2020 21).Pdf
27 3 Engineers Certificate On Quality Assurance (Form 2A FY 2020 21).Pdf
28 1 Engineers Certificate On Quality Assurance (Form 2A FY 2021 22).Pdf
29 1 Disclosure Of Sold Booked Inventory.Pdf
30 2 Disclosure Of Sold Booked Inventory.Pdf
31 3 Disclosure Of Sold Booked Inventory.Pdf
32 4 Disclosure Of Sold Booked Inventory.Pdf
33 5 Disclosure Of Sold Booked Inventory.Pdf
34 6 Disclosure Of Sold Booked Inventory.Pdf
35 7 Disclosure Of Sold Booked Inventory.Pdf
36 8 Disclosure Of Sold Booked Inventory.Pdf
37 9 Disclosure Of Sold Booked Inventory.Pdf
38 10 Disclosure Of Sold Booked Inventory.Pdf
39 1 CA Certificate On Project Cost & Fund Withdrawal (Form 3).Pdf
40 1 Annual Audit Report Of Statutory CA (Form 5) (FY 2021 22).Pdf
41 1 Proforma Of Allotment Letter.Pdf
42 2 Proforma Of Allotment Letter.Pdf
43 3 Proforma Of Allotment Letter.Pdf
44 4 Proforma Of Allotment Letter.Pdf
45 1 Occupancy Certificate Completion Certificate Architect'S Certificate Of Completion For Plotted Development.Pdf
46 2 Occupancy Certificate Completion Certificate Architect'S Certificate Of Completion For Plotted Development.Pdf
47 1 Other.Pdf
48 2 Other.Pdf
49 3 Other.Pdf
50 4 Other.Pdf
51 1 Architect’S Certificate On Completion Of Project (Form 4).Pdf
53 2 CA Certificate On Project Cost & Fund Withdrawal (Form 3).Pdf
54 3 CA Certificate On Project Cost & Fund Withdrawal (Form 3).Pdf
55 4 CA Certificate On Project Cost & Fund Withdrawal (Form 3).Pdf
56 5 CA Certificate On Project Cost & Fund Withdrawal (Form 3).Pdf
57 6 CA Certificate On Project Cost & Fund Withdrawal (Form 3).Pdf
58 7 CA Certificate On Project Cost & Fund Withdrawal (Form 3).Pdf
59 7 Engineer’S Certificate On Cost Incurred On Project (Form 2).Pdf
60 8 Engineer’S Certificate On Cost Incurred On Project (Form 2).Pdf
61 6 Engineer’S Certificate On Cost Incurred On Project (Form 2).Pdf
62 5 Engineer’S Certificate On Cost Incurred On Project (Form 2).Pdf
63 4 Engineer’S Certificate On Cost Incurred On Project (Form 2).Pdf
64 3 Engineer’S Certificate On Cost Incurred On Project (Form 2).Pdf
65 2 Engineer’S Certificate On Cost Incurred On Project (Form 2).Pdf
66 1 Engineer’S Certificate On Cost Incurred On Project (Form 2).Pdf
67 1 Status Of Formation Of Legal Entity (Society Co Op Etc.).Pdf
75 1 Other – Technical.Pdf
76 1 Engineers Certificate On Quality Assurance (Form 2A FY 2022 23).Pdf
77 2 Engineers Certificate On Quality Assurance (Form 2A FY 2022 23).Pdf
78 1 Annual Audit Report Of Statutory CA (Form 5) (FY 2022 23).Pdf
Bank

Bank & Cost Disclosure

Declared project cost and the designated escrow account on file.

Project Account Bank CENTRAL BANK OF INDIA
IFSC CBIN0280639
Branch Address ZUNJARRAO MARKET, KALYAN WEST
Country/City