Squareyards Logo
Blogs
Sell or Rent Property
Login
Rera Banner
residential Ready to Move Source: rera.up

Pearl Residency Gagan Vihar RERA Details - UPRERAPRJ16196, Ghaziabad

View the RERA registration, promoter, approval, building, inventory, document and construction-progress disclosures for Pearl Residency Gagan Vihar under registration UPRERAPRJ16196 in Ghaziabad, Uttar Pradesh. Data is sourced from rera.up.

RERA

RERA Snapshot

The most important statutory project disclosures, generated dynamically from available RERA fields.

  • RERA Number UPRERAPRJ16196
  • Project Name PEARL Residency
  • Project Type Residential
  • Project Status Ready to Move
  • State Uttar Pradesh
  • District Ghaziabad
  • Taluka Ghaziabad
  • Authority Ghaziabad Development Authority
  • Original Completion 05 June 2023
  • Revised Completion 06 December 2022
  • Project Area (in Sq.mt.) 22,392
  • Documents 43 Verified
Timeline

Project Timeline & Completion Details

Key statutory dates from registration through proposed completion and permit validity.

Proposed Start 22 March 2018 Expected commencement of civil works and foundation on site.
Original Completion 05 June 2023 Mandated date for project handover to the allottees and final compliance filing.
Revised Completion 06 December 2022 No revision filed against the original committed handover date.
Project Duration
63 months
Promoter

Promoter, Organisation & Member Details

Declared promoter entity, address and corporate identifiers on file with the authority.

Primary Promoter

DELHI METRO WELFARE ORGANIZATION Societies
Promoter Type Societies
Contact 9650013324
Email koyalenclavedmwo@gmail.com
Registered Address Ground Floor, H-Block, Metro Enclave, Sector-6, Pushp Vihar, New Delhi-110017
Location

Land, Address & Location Details

Land parcel, zoning and geo-coordinates as recorded in the project filing.

Land Type Plot Plot No. GH-13, Koyal Enclave, Ghaziabad
Land Area (in Sq.mt.) 22,392

RERA Coordinates

Latitude, Longitude 28.708434, 77.326673
Plans

Plans & Approvals

Statutory approvals obtained or pending against the project site.

Permit Number 137/445/GH/Zone-8/16
Permit Date 07 December 2017
Valid Upto 06 December 2022

Approval Documents

Approved Layout PDF
Sanctioned Letter PDF
Approved Map PDF
Floor Plan PDF
Project Specifications PDF

Understand this Project's RERA details

Get clear answers and additional support from our RERA experts.

RERA Banner
Inventory

Unit Inventory & Configuration Details

Configuration mix and floor-level disclosures with both grouped and raw RERA views.

Total Units 720
Configurations 7
Inventory Type RESIDENTIAL
Configuration Distribution
1 BHK 3 units · avg area 40.99 Sq.mt.
2 BHK 385 units · avg area 58.93 Sq.mt.
3 BHK 205 units · avg area 85.67 Sq.mt.
4 BHK 11 units · avg area 140.23 Sq.mt.
OTHER 0 units
SHOP 18 units · avg area 11.97 Sq.mt.
STUDIO 98 units · avg area 29.43 Sq.mt.
  • Tower A
  • Tower B1
  • Tower B2
  • Tower C
  • Tower D1
  • Tower D2
  • Tower D3
  • Tower E
Floor-Wise Inventory Explorer
Floor Apartment Type Carpet Area No. of Apartment No. of Balcony No. of Verandah Balcony Area Verandah Area
GF 3 BHK 104.96 1 5 0 19.22 0
GF 3 BHK 105.27 1 5 0 19.22 0
GF 4 BHK 140.23 1 4 0 23.03 0
1 3 BHK 104.96 1 5 0 19.22 0
1 3 BHK 105.27 1 5 0 19.22 0
1 4 BHK 140.23 1 4 0 23.03 0
2 3 BHK 104.96 1 5 0 19.22 0
2 3 BHK 105.27 1 5 0 19.22 0
2 4 BHK 140.23 1 4 0 23.03 0
3 3 BHK 104.96 1 5 0 19.22 0
3 3 BHK 105.27 1 5 0 19.22 0
3 4 BHK 140.23 1 4 0 23.03 0
4 3 BHK 105.27 1 5 0 19.22 0
4 4 BHK 140.23 1 4 0 23.03 0
4 3 BHK 104.96 1 5 0 19.22 0
5 3 BHK 104.96 1 5 0 19.22 0
5 3 BHK 105.27 1 5 0 19.22 0
5 4 BHK 140.23 1 4 0 23.03 0
6 3 BHK 104.96 1 5 0 19.22 0
6 3 BHK 105.27 1 5 0 19.22 0
6 4 BHK 140.23 1 4 0 23.03 0
7 3 BHK 104.96 1 5 0 19.22 0
7 3 BHK 105.27 1 5 0 19.22 0
7 4 BHK 140.23 1 4 0 23.03 0
8 3 BHK 104.96 1 5 0 19.22 0
8 3 BHK 105.27 1 5 0 19.22 0
8 4 BHK 140.23 1 1 0 23.03 0
9 3 BHK 104.96 1 5 0 19.22 0
9 3 BHK 105.27 1 5 0 19.22 0
9 4 BHK 140.23 1 4 0 23.03 0
GF 3 BHK 102.1 1 4 0 18.47 0
GF 3 BHK 105.27 1 5 0 19.22 0
GF 4 BHK 140.23 1 4 0 23.03 0
GF OTHER 0 0 0 0 0 0
BSMNT OTHER 0 0 0 0 0 0
Development

Development Works & Common Area Disclosures

Project-level common infrastructure disclosures as reported by the developer to the RERA authority.

Demarcation Of Plots % not reported Boundary Wall 85% Road Work 75%
Footpaths 70% Water Supply Including Drinking Water Facilities % not reported Sewer System % not reported
Drain 100% Parks % not reported Tree Planting % not reported
Design For Electric Supply Including Street Lighting % not reported Community Buildings % not reported Treatment And Disposal System Of Sewage And Sullage Water % not reported
Solid Waste Management And Disposal System % not reported Water Conservation System % not reported Energy Management System Including Use Of Renewable Energy % not reported
Fire Protection And Fire Safety System % not reported Social Infrastructure And Other Public Amenities Including Public Health Services % not reported Emergency Evacuation Services % not reported
Other Miscellaneous Work % not reported
Documents

RERA Documents & Filings

All statutory documents uploaded by the promoter to the authority portal.

Ca Certificate PDF· 01-04-2020 To 30-06-2020
Architect Certificate PDF· 01-04-2020 To 30-06-2020
Engineer Certificate PDF· 01-04-2020 To 30-06-2020
Ca Certificate PDF· 01-07-2020 To 30-09-2020
Architect Certificate PDF· 01-07-2020 To 30-09-2020
Engineer Certificate PDF· 01-07-2020 To 30-09-2020
Ca Certificate PDF· 01-10-2020 To 31-12-2020
Architect Certificate PDF· 01-10-2020 To 31-12-2020
Engineer Certificate PDF· 01-10-2020 To 31-12-2020
Ca Certificate PDF· 01-01-2021 To 31-03-2021
Architect Certificate PDF· 01-01-2021 To 31-03-2021
Engineer Certificate PDF· 01-01-2021 To 31-03-2021
Ca Certificate PDF· 01-04-2021 To 30-06-2021
Architect Certificate PDF· 01-04-2021 To 30-06-2021
Engineer Certificate PDF· 01-04-2021 To 30-06-2021
Ca Certificate PDF· 01-07-2021 To 30-09-2021
Architect Certificate PDF· 01-07-2021 To 30-09-2021
Engineer Certificate PDF· 01-07-2021 To 30-09-2021
Ca Certificate PDF· 01-10-2021 To 31-12-2021
Architect Certificate PDF· 01-10-2021 To 31-12-2021
Engineer Certificate PDF· 01-10-2021 To 31-12-2021
Ca Certificate PDF· 01-01-2022 To 31-03-2022
Architect Certificate PDF· 01-01-2022 To 31-03-2022
Engineer Certificate PDF· 01-01-2022 To 31-03-2022
Ca Certificate PDF· 01-04-2022 To 30-06-2022
Architect Certificate PDF· 01-04-2022 To 30-06-2022
Engineer Certificate PDF· 01-04-2022 To 30-06-2022
Ca Certificate PDF· 01-07-2022 To 30-09-2022
Architect Certificate PDF· 01-07-2022 To 30-09-2022
Engineer Certificate PDF· 01-07-2022 To 30-09-2022
Ca Certificate PDF· 01-10-2022 To 31-12-2022
Architect Certificate PDF· 01-10-2022 To 31-12-2022
Engineer Certificate PDF· 01-10-2022 To 31-12-2022
Dd 1 Registry Document
Du 1 Details Of Encumbrances
Du 2 Commencement Certificate
Du 3 Proforma Of Application Form
Du 4 Proforma Of Allotment Letter
Du 5 Waste Disposal Plan
Du 6 Water Supply Plan
Du 7 Electricity Supply Plan
Du 8 Development Work Plan
Du 9 Affidavit (Form-B)
Bank

Bank & Cost Disclosure

Declared project cost and the designated escrow account on file.

Project Cost (in Lacs) ₹ 28,608
Registration Fee ₹ 1.17 L
Project Account Bank ICICI BANK
Account Number (RERA) 000701265780
IFSC ICIC0000007
Branch NEW DELHI
Branch Address 9A, PHELPS BUILDING, CONNAUGHT PLACE, NEW DELHI-110001
Country/City