Squareyards Logo
Blogs
Sell or Rent Property
Login
Rera Banner
residential Under Construction Source: rera.up

Omaxe The Resort Lucknow RERA Details - UPRERAPRJ326163, Lucknow

View the RERA registration, promoter, approval, building, inventory, document and construction-progress disclosures for Omaxe The Resort Lucknow under registration UPRERAPRJ326163 in Lucknow, Uttar Pradesh. Data is sourced from rera.up.

RERA

RERA Snapshot

The most important statutory project disclosures, generated dynamically from available RERA fields.

  • RERA Number UPRERAPRJ326163
  • Project Name GH4 PHASE 4(THE RESORT)
  • Project Type Residential
  • Project Status Under Construction
  • State Uttar Pradesh
  • District Lucknow
  • Taluka Sarojini Nagar
  • Authority Lucknow Development Authority
  • Original Completion 31 December 2028
  • Revised Completion 31 December 2028
  • Project Area (in Sq.mt.) 12,175
  • Documents 61 Verified
Timeline

Project Timeline & Completion Details

Key statutory dates from registration through proposed completion and permit validity.

Proposed Start 01 January 2023 Expected commencement of civil works and foundation on site.
Original Completion 31 December 2028 Mandated date for project handover to the allottees and final compliance filing.
Revised Completion 31 December 2028 No revision filed against the original committed handover date.
Project Duration
72 months
Promoter

Promoter, Organisation & Member Details

Declared promoter entity, address and corporate identifiers on file with the authority.

Primary Promoter

OMAXE LIMITED Company
Promoter Type Company
Contact 8795333302
Email chairo@omaxe.com
Registered Address SHOP No-19-B, FIRST FLOOR, OMAXE CELEBRATION MALL, SOHNA ROAD, GURGAON-122001
Location

Land, Address & Location Details

Land parcel, zoning and geo-coordinates as recorded in the project filing.

Land Type Khasra Plot No. 457
Land Area (in Sq.mt.) 8,100
Land Type Khasra Plot No. 458
Land Area (in Sq.mt.) 3,240
Land Type Khasra Plot No. 450
Land Area (in Sq.mt.) 4,851

RERA Coordinates

Latitude, Longitude 26.812423, 80.993787 Latitude, Longitude 26.87, 73.79
Plans

Plans & Approvals

Statutory approvals obtained or pending against the project site.

Permit Number LDA/BP/21-23-3048
Permit Date 22 November 2022
Valid Upto 21 November 2027
Extendable Upto 21 November 2030

Approval Documents

Sanctioned Letter PDF
Approved Map PDF
Floor Plan PDF
Project Specifications PDF

Understand this Project's RERA details

Get clear answers and additional support from our RERA experts.

RERA Banner
Inventory

Unit Inventory & Configuration Details

Configuration mix and floor-level disclosures with both grouped and raw RERA views.

Total Units 144
Configurations 3
Inventory Type RESIDENTIAL
Configuration Distribution
3 BHK 68 units · avg area 170.20 Sq.mt.
4 BHK 68 units · avg area 214.42 Sq.mt.
PENTHOUSE 8 units · avg area 375.79 Sq.mt.
  • Tower A1
  • Tower A2
  • Tower B1
  • Tower B2
Floor-Wise Inventory Explorer
Floor Apartment Type Carpet Area No. of Apartment No. of Balcony No. of Verandah Balcony Area Verandah Area
GF 3 BHK 0 0 0 0 0 0
1 3 BHK 170.20 2 3 0 40.04 0
2 3 BHK 170.20 2 3 0 33.63 0
3 3 BHK 170.20 2 3 0 33.63 0
4 3 BHK 170.20 2 3 0 33.63 0
5 3 BHK 170.20 2 3 0 40.04 0
6 3 BHK 170.20 2 3 0 33.63 0
7 3 BHK 170.20 2 3 0 33.63 0
8 3 BHK 170.20 2 3 0 33.63 0
9 3 BHK 170.20 2 3 0 40.04 0
10 3 BHK 170.20 2 3 0 33.63 0
11 3 BHK 170.20 2 3 0 33.63 0
12 3 BHK 170.20 2 3 0 33.63 0
13 3 BHK 170.20 2 3 0 40.04 0
14 3 BHK 170.20 2 3 0 33.63 0
15 3 BHK 170.20 2 3 0 33.63 0
16 3 BHK 170.20 2 3 0 33.63 0
17 PENTHOUSE 348.76 2 6 0 62.43 0
18 3 BHK 0 0 0 0 0 0
GF 3 BHK 0 0 0 0 0 0
Development

Development Works & Common Area Disclosures

Project-level common infrastructure disclosures as reported by the developer to the RERA authority.

Demarcation Of Plots % not reported Boundary Wall % not reported Road Work 10%
Footpaths % not reported Water Supply Including Drinking Water Facilities % not reported Sewer System % not reported
Drain % not reported Parks % not reported Tree Planting % not reported
Design For Electric Supply Including Street Lighting % not reported Community Buildings % not reported Treatment And Disposal System Of Sewage And Sullage Water % not reported
Solid Waste Management And Disposal System % not reported Water Conservation System % not reported Energy Management System Including Use Of Renewable Energy % not reported
Fire Protection And Fire Safety System % not reported Social Infrastructure And Other Public Amenities Including Public Health Services % not reported Emergency Evacuation Services % not reported
Other Miscellaneous Work % not reported
Documents

RERA Documents & Filings

All statutory documents uploaded by the promoter to the authority portal.

Ca Certificate PDF· 01-01-2023 To 31-03-2023
Architect Certificate PDF· 01-01-2023 To 31-03-2023
Engineer Certificate PDF· 01-01-2023 To 31-03-2023
Ca Certificate PDF· 01-04-2023 To 30-06-2023
Architect Certificate PDF· 01-04-2023 To 30-06-2023
Engineer Certificate PDF· 01-04-2023 To 30-06-2023
Ca Certificate PDF· 01-07-2023 To 30-09-2023
Architect Certificate PDF· 01-07-2023 To 30-09-2023
Engineer Certificate PDF· 01-07-2023 To 30-09-2023
Ca Certificate PDF· 01-10-2023 To 31-12-2023
Architect Certificate PDF· 01-10-2023 To 31-12-2023
Engineer Certificate PDF· 01-10-2023 To 31-12-2023
Ca Certificate PDF· 01-01-2024 To 31-03-2024
Architect Certificate PDF· 01-01-2024 To 31-03-2024
Engineer Certificate PDF· 01-01-2024 To 31-03-2024
Ca Certificate PDF· 01-04-2024 To 30-06-2024
Architect Certificate PDF· 01-04-2024 To 30-06-2024
Engineer Certificate PDF· 01-04-2024 To 30-06-2024
Ca Certificate PDF· 01-07-2024 To 30-09-2024
Architect Certificate PDF· 01-07-2024 To 30-09-2024
Engineer Certificate PDF· 01-07-2024 To 30-09-2024
Ca Certificate PDF· 01-10-2024 To 31-12-2024
Architect Certificate PDF· 01-10-2024 To 31-12-2024
Engineer Certificate PDF· 01-10-2024 To 31-12-2024
Ca Certificate PDF· 01-01-2025 To 31-03-2025
Architect Certificate PDF· 01-01-2025 To 31-03-2025
Engineer Certificate PDF· 01-01-2025 To 31-03-2025
Ca Certificate PDF· 01-04-2025 To 30-06-2025
Architect Certificate PDF· 01-04-2025 To 30-06-2025
Engineer Certificate PDF· 01-04-2025 To 30-06-2025
Ca Certificate PDF· 01-07-2025 To 30-09-2025
Architect Certificate PDF· 01-07-2025 To 30-09-2025
Engineer Certificate PDF· 01-07-2025 To 30-09-2025
Ca Certificate PDF· 01-10-2025 To 31-12-2025
Architect Certificate PDF· 01-10-2025 To 31-12-2025
Engineer Certificate PDF· 01-10-2025 To 31-12-2025
Ca Certificate PDF· 01-01-2026 To 31-03-2026
Architect Certificate PDF· 01-01-2026 To 31-03-2026
Engineer Certificate PDF· 01-01-2026 To 31-03-2026
Dd 1 Sale Deed
Dd 2 Sale Deed
Dd 3 Sale Deed
Dd 4 Registry Document
Dd 5 Registry Document
Dd 6 Registry Document
Dd 7 Registry Document
Du 1 Details Of Encumbrances
Du 2 Commencement Certificate
Du 3 Other Plan(If Any)
Du 4 Proforma Of Application Form
Du 5 Proforma Of Allotment Letter
Du 6 Proforma Of Conveyance Deed
Du 7 Waste Disposal Plan
Du 8 Water Supply Plan
Du 9 Electricity Supply Plan
Du 10 Development Work Plan
Du 11 Affidavit (Form-B)
Du 12 CA CERTIFICATE
Du 13 ARCHITECT CERTIFICATE
Du 14 ENGINEERS CERTIFICATE
Du 15 Other
Bank

Bank & Cost Disclosure

Declared project cost and the designated escrow account on file.

Project Cost (in Lacs) ₹ 35,000
Registration Fee ₹ 66,000
Project Account Bank IDBI BANK
Account Number (RERA) 277102000010557
IFSC IBKL0000277
Branch INDRA NAGAR
Branch Address INDRA NAGAR LUCKNOW
Country/City