RERA
RERA Snapshot
The most important statutory project disclosures, generated dynamically from available RERA fields.
- RERA Number P51700051106
- Project Status Partially Ready To Move
- District Thane
- Taluka Thane
- Project Area (in Sq.mt.) 2,780.0
- Total Buildings/Towers 1
- Documents 2 Verified
Timeline
Project Timeline & Completion Details
Key statutory dates from registration through proposed completion and permit validity.
Proposed Start
29 May 2023
Expected commencement of civil works and foundation on site.
Development
Development Works & Common Area Disclosures
Project-level common infrastructure disclosures as reported by the developer to the RERA authority.
| Internal Roads & Footpaths % not reported | Water Supply 100.0% | Sewerage (Chamber, Lines, Septic Tank , Stp) 100.0% |
| Storm Water Drains 100.0% | Landscaping & Tree Planting 100.0% | Street Lighting % not reported |
| Community Buildings % not reported | Treatment And Disposal Of Sewage And Sullage Water 100.0% | Solid Waste Management And Disposal % not reported |
| Water Conservation /Rain Water Harvesting 100.0% | Energy Managemcnt % not reported | Fire Protection And Fire Safety Requirements 100.0% |
| Electrical Meter Room, Sub-station, Receiving Station 100.0% | Aggregate Area Of Recreational Open Space % not reported | Open Parking % not reported |
| Solar Panel Installation % not reported | D G Set Installation 100.0% |
Documents
RERA Documents & Filings
All statutory documents uploaded by the promoter to the authority portal.
Bank
Bank & Cost Disclosure
Declared project cost and the designated escrow account on file.
| Project Account Bank | BHARAT COOPERATIVE BANK MUMBAI LIMITED |
|---|---|
| IFSC | BCBM0000091 |
| Branch Address | GROUND FLOOR, SHREE KRISHNA PARK, DIVA SHIL ROAD, DIVA EAST THANE 400612 |