South Fatima Enclave Mumbra RERA Details - P51700019003, Thane

View the RERA registration, promoter, approval, building, inventory, document and construction-progress disclosures for South Fatima Enclave Mumbra under registration P51700019003 in Thane, Maharashtra. Data is sourced from rera.mh.

RERA

RERA Snapshot

The most important statutory project disclosures, generated dynamically from available RERA fields.

  • RERA Number P51700019003
  • Project Name FATIMA ENCLAVE- A & B
  • Project Type Others
  • Project Status Ready to Move
  • State Maharashtra
  • District Thane
  • Taluka Thane
  • Village Thane (M Corp.)
  • Original Completion 30 December 2023
  • Revised Completion 31 March 2027
  • Project Area (in Sq.mt.) 2,470.61
  • Total Buildings/Towers 3
  • Documents 61 Verified
Timeline

Project Timeline & Completion Details

Key statutory dates from registration through proposed completion and permit validity.

Proposed Start 28 December 2018 Expected commencement of civil works and foundation on site.
Original Completion 30 December 2023 Mandated date for project handover to the allottees and final compliance filing.
Revised Completion 31 March 2027 No revision filed against the original committed handover date.
Promoter

Promoter, Organisation & Member Details

Declared promoter entity, address and corporate identifiers on file with the authority.

Organisation Type Individual

Understand this Project's RERA details

Get clear answers and additional support from our RERA experts.

RERA Banner
Buildings

Buildings, Towers & Building-Level Details

Statutory building-level disclosures including tower height, sanctioned floors, structural counts and parking areas.

Building Detail
Project Name Name No. of Open Parking No. of Closed Parking No. of Floors CC Issued No. of Habitable Floor No. of Sanctioned Apartment Wing Name
FATIMA ENCLAVE- A & B ROW HOUSE 0 0 1 1 1 1 NA
FATIMA ENCLAVE- A & B A WING 11 1 9 7 7 27 NA
FATIMA ENCLAVE- A & B B WING 12 1 21 20 20 126 NA

Scroll horizontally to view all building-level fields. Values marked "-" were not disclosed in the source RERA record.

Inventory

Unit Inventory & Configuration Details

Configuration mix and floor-level disclosures with both grouped and raw RERA views.

Total Units 154
Configurations 13
Inventory Type RESIDENTIAL
Configuration Distribution
1 BHK 67 units · avg area 35.66 Sq.mt.
SHOP NO 1 LANDOWNER 1 unit · avg area 16.69 Sq.mt.
SHOP NO 2 LANDOWNER 1 unit · avg area 13.61 Sq.mt.
2 BHK 61 units · avg area 52.80 Sq.mt.
SHOP NO 3 LANDOWNER 1 unit · avg area 3.63 Sq.mt.
3 BHK 4 units · avg area 117.88 Sq.mt.
SHOP NO 4 LANDOWNER 1 unit · avg area 12.87 Sq.mt.
SHOP NO 5 LANDOWNER 1 unit · avg area 11.38 Sq.mt.
SHOP NO 6 LANDOWNER 1 unit · avg area 7.03 Sq.mt.
FATIMA Row House 1 unit · avg area 122.00 Sq.mt.
Shop 12 units · avg area 15.54 Sq.mt.
SHOP LANDOWNER 2 units · avg area 12.69 Sq.mt.
GYM 1 unit · avg area 33.00 Sq.mt.
  • ROW HOUSE
  • A WING
  • B WING
Floor-Wise Inventory Explorer
Apartment Type Carpet Area No. of Apartment No. of Booked Apartment
FATIMA Row House 122.0 1 0
Development

Development Works & Common Area Disclosures

Project-level common infrastructure disclosures as reported by the developer to the RERA authority.

Internal Roads & Footpaths % not reported Water Supply % not reported Sewerage (Chamber, Lines, Septic Tank , Stp) % not reported
Storm Water Drains % not reported Landscaping & Tree Planting % not reported Street Lighting % not reported
Community Buildings % not reported Treatment And Disposal Of Sewage And Sullage Water % not reported Solid Waste Management And Disposal % not reported
Water Conservation /Rain Water Harvesting % not reported Energy Managemcnt % not reported Fire Protection And Fire Safety Requirements % not reported
Electrical Meter Room, Sub-station, Receiving Station % not reported Aggregate Area Of Recreational Open Space % not reported Open Parking % not reported
Activity

Building Activity Progress

Statutory activity-wise construction progress as declared by the developer, per building/tower.

  • ROW HOUSE
  • A WING
  • B WING
ROW HOUSE · Overall Progress 57%
Stilt Floor
In Progress
% Work85%
Excavation
Complete
% Work100%
Basement (if any)
Complete
% Work100%
Podiums (if any)
Not Started
% Work0%
Plinth
Complete
% Work100%
Slabs of Super Structure
Complete
% Work100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
In Progress
% Work65%
Sanitary Fittings within the flats / premises
Not Started
% Work0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
In Progress
% Work60%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
In Progress
% Work20%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Not Started
% Work0%
Documents

RERA Documents & Filings

All statutory documents uploaded by the promoter to the authority portal.

Mh Certificate Pdf
Mh Extension Certificate Pdf
Mh Details Html
1 1 PAN Card.Pdf
2 1 Copy Of The Legal Title Report.Pdf
3 1 Details Of Encumbrances.Pdf
4 1 Copy Of Layout Approval (In Case Of Layout).Pdf
5 1 Building Plan Approval (IOD).Pdf
6 1 Commencement Certificates NA Order For Plotted Development.Pdf
7 2 Commencement Certificates NA Order For Plotted Development.Pdf
8 1 Declaration About Commencement Certificate.Pdf
9 1 Declaration In FORM B.Pdf
10 1 Architect’S Certificate Of Percentage Of Completion Of Work (Form 1).Pdf
11 2 Architect’S Certificate Of Percentage Of Completion Of Work (Form 1).Pdf
12 3 Architect’S Certificate Of Percentage Of Completion Of Work (Form 1).Pdf
13 1 Engineer’S Certificate On Cost Incurred On Project (Form 2).Pdf
14 1 Engineers Certificate On Quality Assurance (Form 2A FY 2022 23).Pdf
15 1 Engineers Certificate On Quality Assurance (Form 2A FY 2023 24).Pdf
16 1 Disclosure Of Sold Booked Inventory.Pdf
17 2 Disclosure Of Sold Booked Inventory.Pdf
18 3 Disclosure Of Sold Booked Inventory.Pdf
19 4 Disclosure Of Sold Booked Inventory.Pdf
20 1 Certificates Of CA (Form 3).Pdf
21 2 Certificates Of CA (Form 3).Pdf
22 1 Annual Audit Report Of Statutory CA (Form 5) (FY 2018 19).Pdf
23 1 Annual Audit Report Of Statutory CA (Form 5) (FY 2019 20).Pdf
24 1 Annual Audit Report Of Statutory CA (Form 5) (FY 2020 21).Pdf
25 1 Annual Audit Report Of Statutory CA (Form 5) (FY 2021 22).Pdf
26 1 Annual Audit Report Of Statutory CA (Form 5) (FY 2022 23).Pdf
27 1 Proforma Of Allotment Letter.Pdf
28 2 Proforma Of Allotment Letter.Pdf
29 1 Status Of Formation Of Legal Entity (Society Co Op Etc.).Pdf
30 1 Other – Technical.Pdf
36 4 Architect’S Certificate Of Percentage Of Completion Of Work (Form 1).Pdf
39 2 Engineer’S Certificate On Cost Incurred On Project (Form 2).Pdf
40 3 Engineer’S Certificate On Cost Incurred On Project (Form 2).Pdf
41 4 Engineer’S Certificate On Cost Incurred On Project (Form 2).Pdf
43 1 Declaration About All RERA Designated Bank Accounts (Format A).Pdf
44 2 Declaration About All RERA Designated Bank Accounts (Format A).Pdf
45 3 Declaration About All RERA Designated Bank Accounts (Format A).Pdf
46 1 Disclosure Of Interest In Other Real Estate Organizations.Pdf
48 2 Engineers Certificate On Quality Assurance (Form 2A FY 2023 24).Pdf
49 3 Engineers Certificate On Quality Assurance (Form 2A FY 2023 24).Pdf
50 1 Annual Audit Report Of Statutory CA (Form 5) (FY 2023 24).Pdf
52 1 CERSAI Details.Pdf
57 1 Engineers Certificate On Quality Assurance (Form 2A FY 2019 20).Pdf
60 1 Engineers Certificate On Quality Assurance (Form 2A FY 2020 21).Pdf
64 1 Engineers Certificate On Quality Assurance (Form 2A FY 2021 22).Pdf
75 Form 1.Pdf
76 Form 2.Pdf
77 Form 3.Pdf
78 Disclosure Of Sold And Booked Inventory.Pdf
99 Withdrawal Update Form 1.Pdf
101 Withdrawal Update Form 2.Pdf
103 Withdrawal Update Form 3.Pdf
105 Form 5 (FY 2018 2019).Pdf
106 Form 5 (FY 2019 2020).Pdf
107 Form 5 (FY 2020 2021).Pdf
108 Form 5 (FY 2021 2022).Pdf
109 Form 5 (FY 2022 2023).Pdf
110 Form 5 (FY 2023 2024).Pdf
Bank

Bank & Cost Disclosure

Declared project cost and the designated escrow account on file.

Project Account Bank INDIAN BANK
IFSC IDIB000M216
Branch Address SURME PLAZA MUMBRA
Country/City