Squareyards Logo
Blogs
Sell or Rent Property
Login
Rera Banner
residential Ready to Move Source: rera.mh

Vijay Enclave RERA Details - P51700008755, Thane

View the RERA registration, promoter, approval, building, inventory, document and construction-progress disclosures for Vijay Enclave under registration P51700008755 in Thane, Maharashtra. Data is sourced from rera.mh.

RERA

RERA Snapshot

The most important statutory project disclosures, generated dynamically from available RERA fields.

  • RERA Number P51700008755
  • Project Name VIJAY ENCLAVE
  • Project Type Residential / Group Housing
  • Project Status Ready to Move
  • State Maharashtra
  • District Thane
  • Taluka Thane
  • Village Thane (M Corp.)
  • Original Completion 30 March 2025
  • Revised Completion 30 March 2025
  • Project Area (in Sq.mt.) 1,334.72
  • Total Buildings/Towers 4
  • Documents 23 Verified
Timeline

Project Timeline & Completion Details

Key statutory dates from registration through proposed completion and permit validity.

Proposed Start 19 August 2017 Expected commencement of civil works and foundation on site.
Original Completion 30 March 2025 Mandated date for project handover to the allottees and final compliance filing.
Revised Completion 30 March 2025 No revision filed against the original committed handover date.
Promoter

Promoter, Organisation & Member Details

Declared promoter entity, address and corporate identifiers on file with the authority.

Organisation Type Company
Individule Name VIJAY CITISPACE PVT. LTD.
Experience Details
Project NameAddressLand AreaProject StatusType of ProjectBuild Plot CountApartment countProposed Completion DateProject End DateLitigation PresentLitigation Details
VIJAY GALAXYVillage Kavesar Sector VI G.B.Road Thane9906CompletedIndustrial23082015-12-312015-09-22NoNA
VIJAY RESIDENCY IIVillage Kavesar Sector VI G.B.Road Thane West3730CompletedResidential / Group Housing1542015-12-312016-10-05NoNA
VIJAY RESIDENCY IIIVillage Kavesar Sector VI G.B.Road Thane West4710CompletedIndustrial1622016-03-312017-04-05NoNA
Location

Land, Address & Location Details

Land parcel, zoning and geo-coordinates as recorded in the project filing.

Address BTDcppXFbEa4Mmfga7tQP7z98bk9txRrPfFryWxrwP/RqVm9XmNlNZUp0VT286yi

RERA Coordinates

Latitude, Longitude 19.253269221452847, 72.973885657077740

Understand this Project's RERA details

Get clear answers and additional support from our RERA experts.

RERA Banner
Buildings

Buildings, Towers & Building-Level Details

Statutory building-level disclosures including tower height, sanctioned floors, structural counts and parking areas.

Building Detail
Project Name Name No. of Open Parking No. of Closed Parking No. of Floors No. of Habitable Floor No. of Sanctioned Apartment Wing Name
VIJAY ENCLAVE BUILDING NO 4 Floor 1 TO 30 67 109 35 0 0 NA
VIJAY ENCLAVE BUILDING NO 4 Floor 31 TO 40 0 63 10 0 0 NA
VIJAY ENCLAVE BUILDING NO 5 Floor 1 TO 30 13 107 35 0 0 NA
VIJAY ENCLAVE BUILDING NO 5 Floor 31 TO 40 0 42 10 0 0 NA

Scroll horizontally to view all building-level fields. Values marked "-" were not disclosed in the source RERA record.

Inventory

Unit Inventory & Configuration Details

Configuration mix and floor-level disclosures with both grouped and raw RERA views.

Total Units 376
Configurations 2
Inventory Type RESIDENTIAL
Configuration Distribution
1 BHK 227 units · avg area 38.06 Sq.mt.
2 BHK 149 units · avg area 66.27 Sq.mt.
  • BUILDING NO 4 Floor 1 TO 30
  • BUILDING NO 4 Floor 31 TO 40
  • BUILDING NO 5 Floor 1 TO 30
  • BUILDING NO 5 Floor 31 TO 40
Floor-Wise Inventory Explorer
Apartment Type Carpet Area No. of Apartment No. of Booked Apartment
1 BHK 36.22 58 14
1 BHK 37.8 58 16
1 BHK 40.36 53 19
Development

Development Works & Common Area Disclosures

Project-level common infrastructure disclosures as reported by the developer to the RERA authority.

Internal Roads & Footpaths 50.0% Water Supply % not reported Sewerage (Chamber, Lines, Septic Tank , Stp) % not reported
Storm Water Drains % not reported Landscaping & Tree Planting 62.0% Street Lighting 100.0%
Community Buildings 15.0% Treatment And Disposal Of Sewage And Sullage Water % not reported Solid Waste Management And Disposal % not reported
Water Conservation /Rain Water Harvesting % not reported Energy Managemcnt % not reported Fire Protection And Fire Safety Requirements % not reported
Electrical Meter Room, Sub-station, Receiving Station % not reported Aggregate Area Of Recreational Open Space % not reported Open Parking % not reported
Wooden Flooring For Yoga Or Meditation Room And Open Space For Gathering % not reported Society Office % not reported Small Area And Childproof Room With Soft Rubber Flooring Upto Age Of 5 Years % not reported
Common Amenities Like Gym Common Room Games Room Reading Room Senior Citizen Party Room % not reported
Activity

Building Activity Progress

Statutory activity-wise construction progress as declared by the developer, per building/tower.

  • BUILDING NO 4 Floor 1 TO 30
  • BUILDING NO 4 Floor 31 TO 40
  • BUILDING NO 5 Floor 1 TO 30
  • BUILDING NO 5 Floor 31 TO 40
BUILDING NO 4 Floor 1 TO 30 · Overall Progress 14%
Excavation
In Progress
% Work90%
Basement (if any)
In Progress
% Work30%
Podiums (if any)
Not Started
% Work0%
Plinth
In Progress
% Work30%
Stilt Floor
Not Started
% Work0%
Slabs of Super Structure
Not Started
% Work0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Not Started
% Work0%
Sanitary Fittings within the flats / premises
Not Started
% Work0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Not Started
% Work0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Not Started
% Work0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Not Started
% Work0%
Documents

RERA Documents & Filings

All statutory documents uploaded by the promoter to the authority portal.

14 1 Certificates Of CA (Form 5).Pdf
15 1 Proforma Of Allotment Letter.Pdf
Mh Certificate Pdf
Mh Details Html
1 1 PAN Card.Pdf
2 1 Copy Of The Legal Title Report.Pdf
3 1 Details Of Encumbrances.Pdf
4 1 Copy Of Layout Approval (In Case Of Layout).Pdf
5 1 Building Plan Approval (IOD).Pdf
6 1 Commencement Certificates NA Order For Plotted Development.Pdf
7 1 Declaration In FORM B.Pdf
8 1 Certificates Of Architect (Form 1)(Mandatory For Only Ongoing Project).Pdf
9 2 Certificates Of Architect (Form 1)(Mandatory For Only Ongoing Project).Pdf
10 1 Certificates Of Engineer (Form 2)(Mandatory For Only Ongoing Project).Pdf
11 2 Certificates Of Engineer (Form 2)(Mandatory For Only Ongoing Project).Pdf
12 1 Certificates Of CA (Form 3).Pdf
13 2 Certificates Of CA (Form 3).Pdf
16 2 Proforma Of Allotment Letter.Pdf
17 1 Other.Pdf
18 2 Other.Pdf
19 3 Other.Pdf
20 4 Other.Pdf
21 5 Other.Pdf
Bank

Bank & Cost Disclosure

Declared project cost and the designated escrow account on file.

Project Account Bank HDFC BANK
IFSC HDFC0000814
Branch Address SURAJ HOUSE SHOP NO 1 AND 2 GROUND FLOOR PATLIPADA GHODBUNDER ROAD THANE MAHARASHTRA 400607
Country/City