RERA

RERA Snapshot

The most important statutory project disclosures, generated dynamically from available RERA fields.

  • RERA Number P52100013626
  • Project Name AARYARAJ ELEGANCE
  • Project Type Residential
  • Project Status Ready to Move
  • State MAHARASHTRA
  • District Pune
  • Taluka Haveli
  • Village Shivne (Part)
  • Original Completion 30 July 2020
  • Project Area (in Sq.mt.) 3,100
  • Total Buildings/Towers 1
  • Documents 59 Verified
Timeline

Project Timeline & Completion Details

Key statutory dates from registration through proposed completion and permit validity.

Proposed Start 16 October 2017 Expected commencement of civil works and foundation on site.
Original Completion 30 July 2020 Mandated date for project handover to the allottees and final compliance filing.
Promoter

Promoter, Organisation & Member Details

Declared promoter entity, address and corporate identifiers on file with the authority.

Organisation Type Partnership
Individule Name AARYARAJ DEVELOPERS
Other Description NA

Promoters, Co-promoters & Members

NameRole
SANGRAM SURENDRA LAIGUDEAuthorized Signatory
SAGAR SURENDRA LAIGUDEPartner
GAJANAN SURENDRA LAIGUDEPartner
SURENDRA BABURAO LAIGUDEPartner
KISHOR MANOHAR BETTIGIRIPartner
SANGRAM SURENDRA LAIGUDEPartner

Understand this Project's RERA details

Get clear answers and additional support from our RERA experts.

RERA Banner
Buildings

Buildings, Towers & Building-Level Details

Statutory building-level disclosures including tower height, sanctioned floors, structural counts and parking areas.

Building Detail
Project Name Name Date of Completion No. of Basements No. of Plinth No. of Podium No. of Slab No. of Slits No. of Open Parking No. of Closed Parking
AARYARAJ ELEGANCE AARYARAJ ELEGANCE 2020-03-31 0 1 0 5 0 0 0

Scroll horizontally to view all building-level fields. Values marked "-" were not disclosed in the source RERA record.

Inventory

Unit Inventory & Configuration Details

Configuration mix and floor-level disclosures with both grouped and raw RERA views.

Total Units 69
Configurations 1
Inventory Type RESIDENTIAL
Configuration Distribution
1 BHK 69 units · avg area 30.73 Sq.mt.
  • AARYARAJ ELEGANCE
Floor-Wise Inventory Explorer
Apartment Type Carpet Area No. of Apartment No. of Booked Apartment
1 BHK T6 27.43 6 6
1BHK T5 30.07 10 6
1 BHK T7 32.33 6 4
1 BHK T3 30.40 4 1
1 BHK T2 32.62 13 4
1 BHK T9 28.98 2 0
1 BHK T10 33.57 4 0
1 BHK T11 30.44 4 0
1 BHK T12 28.83 2 0
1BHK T1 30.55 8 8
1 BHK T4 30.60 2 1
1 BHK T8 29.76 8 5
Parking

Parking, Garage & Area Details

Parking provision declared in the sanctioned plan.

Type Proposed Booked Work Done
Garage 0 0 0
Covered Parking 46 35 80
Development

Development Works & Common Area Disclosures

Project-level common infrastructure disclosures as reported by the developer to the RERA authority.

Internal Roads Footpaths 100% Water Conservation Rainwater Harvesting 100% Energy Management 100%
Fire Protection And Fire Safety Requirements 100% Electrical Meter Room Substation Receivingstation 100% Aggregate Area Of Recreational Open Space % not reported
Open Parking % not reported Water Supply 100% Sewerage 100%
Storm Water Drains % not reported Landscaping Tree Planting 100% Street Lighting 100%
Community Buildings % not reported Treatment And Disposal Of Sewage Sullage Water % not reported Solid Waste Management Disposal 100%
Activity

Building Activity Progress

Statutory activity-wise construction progress as declared by the developer, per building/tower.

  • AARYARAJ ELEGANCE
AARYARAJ ELEGANCE · Overall Progress 80%
Excavation
Complete
% Work100%
X number of Basement(s) and Plinth
Complete
% Work100%
X number of Podiums
Not Started
% Work0%
Stilt Floor
Not Started
% Work0%
X number of Slabs of Super Structure
Complete
% Work100%
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Complete
% Work100%
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Complete
% Work100%
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Complete
% Work100%
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
Complete
% Work100%
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Complete
% Work100%
Documents

RERA Documents & Filings

All statutory documents uploaded by the promoter to the authority portal.

Mh Details Html
Mh Certificate Pdf
Mh Details Pdf
1 Copy Of The Legal Title Report
1 Details Of Encumbrances
1 Copy Of Layout Approval (In Case Of Layout)
2 Copy Of Layout Approval (In Case Of Layout)
1 Building Plan Approval (IOD)
2 Building Plan Approval (IOD)
1 Commencement Certificates / NA Order For Plotted Development
1 Declaration About Commencement Certificate
1 Declaration In FORM B
2 Declaration In FORM B
1 Certificates Of Architect (Form 1)(Mandatory For Only Ongoing Project)
2 Certificates Of Architect (Form 1)(Mandatory For Only Ongoing Project)
3 Certificates Of Architect (Form 1)(Mandatory For Only Ongoing Project)
4 Certificates Of Architect (Form 1)(Mandatory For Only Ongoing Project)
5 Certificates Of Architect (Form 1)(Mandatory For Only Ongoing Project)
6 Certificates Of Architect (Form 1)(Mandatory For Only Ongoing Project)
7 Certificates Of Architect (Form 1)(Mandatory For Only Ongoing Project)
8 Certificates Of Architect (Form 1)(Mandatory For Only Ongoing Project)
9 Certificates Of Architect (Form 1)(Mandatory For Only Ongoing Project)
10 Certificates Of Architect (Form 1)(Mandatory For Only Ongoing Project)
11 Certificates Of Architect (Form 1)(Mandatory For Only Ongoing Project)
12 Certificates Of Architect (Form 1)(Mandatory For Only Ongoing Project)
13 Certificates Of Architect (Form 1)(Mandatory For Only Ongoing Project)
14 Certificates Of Architect (Form 1)(Mandatory For Only Ongoing Project)
1 Certificates Of Engineer (Form 2)(Mandatory For Only Ongoing Project)
2 Certificates Of Engineer (Form 2)(Mandatory For Only Ongoing Project)
3 Certificates Of Engineer (Form 2)(Mandatory For Only Ongoing Project)
4 Certificates Of Engineer (Form 2)(Mandatory For Only Ongoing Project)
5 Certificates Of Engineer (Form 2)(Mandatory For Only Ongoing Project)
6 Certificates Of Engineer (Form 2)(Mandatory For Only Ongoing Project)
7 Certificates Of Engineer (Form 2)(Mandatory For Only Ongoing Project)
8 Certificates Of Engineer (Form 2)(Mandatory For Only Ongoing Project)
9 Certificates Of Engineer (Form 2)(Mandatory For Only Ongoing Project)
10 Certificates Of Engineer (Form 2)(Mandatory For Only Ongoing Project)
11 Certificates Of Engineer (Form 2)(Mandatory For Only Ongoing Project)
12 Certificates Of Engineer (Form 2)(Mandatory For Only Ongoing Project)
13 Certificates Of Engineer (Form 2)(Mandatory For Only Ongoing Project)
1 Engineers Certificate On Quality Assurance (Form 2A)
2 Engineers Certificate On Quality Assurance (Form 2A)
3 Engineers Certificate On Quality Assurance (Form 2A)
1 Engineers Certificate On Quality Assurance (Form 2A FY 2020-21)
1 Engineers Certificate On Quality Assurance (Form 2A FY 2021-22)
1 Engineers Certificate On Quality Assurance (Form 2A FY 2022-23)
1 Disclosure Of Sold/ Booked Inventory
1 Certificates Of CA (Form 5)
2 Certificates Of CA (Form 5)
1 Annual Audit Report Of Statutory CA (Form 5) (FY 2018-19)
1 Annual Audit Report Of Statutory CA (Form 5) (FY 2019-20)
1 Annual Audit Report Of Statutory CA (Form 5) (FY 2020-21)
2 Annual Audit Report Of Statutory CA (Form 5) (FY 2020-21)
1 Annual Audit Report Of Statutory CA (Form 5) (FY 2021-22)
2 Annual Audit Report Of Statutory CA (Form 5) (FY 2021-22)
1 Annual Audit Report Of Statutory CA (Form 5) (FY 2022-23)
1 Proforma Of Allotment Letter
2 Proforma Of Allotment Letter
1 Other
Bank

Bank & Cost Disclosure

Declared project cost and the designated escrow account on file.

Project Account Bank AXIS BANK
IFSC UTIB0000828
Country/City