Squareyards Logo
Blogs
Sell or Rent Property
Login
Rera Banner
residential Ready to Move Source: rera.mh

Prasanna Panache RERA Details - P52100019736, Pune

View the RERA registration, promoter, approval, building, inventory, document and construction-progress disclosures for Prasanna Panache under registration P52100019736 in Pune, MAHARASHTRA. Data is sourced from rera.mh.

RERA

RERA Snapshot

The most important statutory project disclosures, generated dynamically from available RERA fields.

  • RERA Number P52100019736
  • Project Name Panache
  • Project Type Residential
  • Project Status Ready to Move
  • State MAHARASHTRA
  • District Pune
  • Taluka Mulshi
  • Village Wakad
  • Original Completion 30 December 2023
  • Project Area (in Sq.mt.) 3,220.00
  • Total Buildings/Towers 1
  • Documents 74 Verified
Timeline

Project Timeline & Completion Details

Key statutory dates from registration through proposed completion and permit validity.

Proposed Start 05 March 2019 Expected commencement of civil works and foundation on site.
Original Completion 30 December 2023 Mandated date for project handover to the allottees and final compliance filing.
Promoter

Promoter, Organisation & Member Details

Declared promoter entity, address and corporate identifiers on file with the authority.

Understand this Project's RERA details

Get clear answers and additional support from our RERA experts.

RERA Banner
Buildings

Buildings, Towers & Building-Level Details

Statutory building-level disclosures including tower height, sanctioned floors, structural counts and parking areas.

Building Detail
Project Name Name Date of Completion No. of Basements No. of Plinth No. of Podium No. of Slab No. of Slits No. of Open Parking No. of Closed Parking
Panache A 2022-12-31 2 1 0 15 0 21 71

Scroll horizontally to view all building-level fields. Values marked "-" were not disclosed in the source RERA record.

Inventory

Unit Inventory & Configuration Details

Configuration mix and floor-level disclosures with both grouped and raw RERA views.

Total Units 104
Configurations 6
Inventory Type RESIDENTIAL
Configuration Distribution
2 BHK 86 units · avg area 64.27 Sq.mt.
3 BHK 4 units · avg area 180.96 Sq.mt.
4 BHK 6 units · avg area 129.58 Sq.mt.
Shop 6 units · avg area 83.47 Sq.mt.
ConferenceHall 1 unit · avg area 70.93 Sq.mt.
RefugeeArea 1 unit · avg area 88.34 Sq.mt.
  • A
Floor-Wise Inventory Explorer
Apartment Type Carpet Area No. of Apartment No. of Booked Apartment
2BHK 61.15 2 2
2BHK 61.18 1 1
2BHK 61.85 1 0
2BHK 62.55 1 1
2BHK 62.6 3 3
2BHK 62.65 1 1
2BHK 62.66 1 1
2BHK 61.78 2 0
2BHK 60.4 1 1
2BHK 60.47 1 1
2BHK 60.48 1 1
2BHK 61.07 1 1
2BHK 63.91 11 10
2BHK 63.92 1 1
2BHK 64.22 1 1
2BHK 64.39 1 1
2BHK 64.4 5 5
2BHK 64.41 1 1
2BHK 64.45 1 1
2BHK 64.6 2 2
2BHK 64.62 2 2
2BHK 64.66 4 4
2BHK 65.1 1 1
2BHK 65.11 2 2
2BHK 65.13 1 1
2BHK 65.49 1 1
2BHK 65.85 1 1
2BHK 65.86 1 1
2BHK 65.89 1 1
2BHK 65.92 1 1
2BHK 65.93 1 1
2BHK 65.94 4 4
2BHK 66.08 1 1
2BHK 66.58 1 1
2BHK 66.61 1 1
2BHK 66.78 1 1
2BHK 66.88 4 4
2BHK 66.92 1 1
2BHK 67.16 3 3
Shop 66.47 1 0
ConferenceHall 70.93 1 0
Shop 74.94 1 0
2BHK 80.76 1 0
Shop 82.28 1 0
Shop 82.65 1 0
RefugeeArea 88.34 1 0
Shop 97.05 1 0
Shop 97.42 1 0
4BHK 129.58 6 6
3BHK 175.01 1 1
3BHK 179.18 1 1
3BHK 189.82 1 1
3BHK 179.82 1 1
2BHK 61.86 4 1
2BHK 62.34 1 1
2BHK 62.54 4 4
2BHK 62.83 2 2
2BHK 62.84 1 1
2BHK 63.38 2 2
Parking

Parking, Garage & Area Details

Parking provision declared in the sanctioned plan.

Type Proposed Booked Work Done
Garage 0 0 0
Covered Parking 0 34 88
Development

Development Works & Common Area Disclosures

Project-level common infrastructure disclosures as reported by the developer to the RERA authority.

Internal Roads Footpaths 100% Water Conservation Rainwater Harvesting 100% Energy Management 100%
Fire Protection And Fire Safety Requirements 100% Electrical Meter Room Substation Receivingstation 100% Aggregate Area Of Recreational Open Space % not reported
Open Parking % not reported Water Supply 100% Sewerage 100%
Storm Water Drains 100% Landscaping Tree Planting 100% Street Lighting % not reported
Community Buildings % not reported Treatment And Disposal Of Sewage Sullage Water % not reported Solid Waste Management Disposal % not reported
Activity

Building Activity Progress

Statutory activity-wise construction progress as declared by the developer, per building/tower.

  • A
A · Overall Progress 80%
Excavation
Complete
% Work100%
X number of Basement(s) and Plinth
Complete
% Work100%
X number of Podiums
Not Started
% Work0%
Stilt Floor
Not Started
% Work0%
X number of Slabs of Super Structure
Complete
% Work100%
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Complete
% Work100%
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Complete
% Work100%
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Complete
% Work100%
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
Complete
% Work100%
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Complete
% Work100%
Documents

RERA Documents & Filings

All statutory documents uploaded by the promoter to the authority portal.

Mh Details Html
Mh Certificate Pdf
Mh Details Pdf
1 Copy Of The Legal Title Report
2 Copy Of The Legal Title Report
3 Copy Of The Legal Title Report
1 Details Of Encumbrances
1 Copy Of Layout Approval (In Case Of Layout)
1 Building Plan Approval (IOD)
2 Building Plan Approval (IOD)
3 Building Plan Approval (IOD)
4 Building Plan Approval (IOD)
5 Building Plan Approval (IOD)
6 Building Plan Approval (IOD)
7 Building Plan Approval (IOD)
8 Building Plan Approval (IOD)
9 Building Plan Approval (IOD)
10 Building Plan Approval (IOD)
11 Building Plan Approval (IOD)
12 Building Plan Approval (IOD)
13 Building Plan Approval (IOD)
14 Building Plan Approval (IOD)
15 Building Plan Approval (IOD)
16 Building Plan Approval (IOD)
17 Building Plan Approval (IOD)
18 Building Plan Approval (IOD)
19 Building Plan Approval (IOD)
20 Building Plan Approval (IOD)
21 Building Plan Approval (IOD)
22 Building Plan Approval (IOD)
23 Building Plan Approval (IOD)
24 Building Plan Approval (IOD)
1 Commencement Certificates / NA Order For Plotted Development
2 Commencement Certificates / NA Order For Plotted Development
3 Commencement Certificates / NA Order For Plotted Development
4 Commencement Certificates / NA Order For Plotted Development
1 Declaration In FORM B
1 Architect’S Certificate Of Percentage Of Completion Of Work (Form 1)
2 Architect’S Certificate Of Percentage Of Completion Of Work (Form 1)
3 Architect’S Certificate Of Percentage Of Completion Of Work (Form 1)
4 Architect’S Certificate Of Percentage Of Completion Of Work (Form 1)
5 Architect’S Certificate Of Percentage Of Completion Of Work (Form 1)
6 Architect’S Certificate Of Percentage Of Completion Of Work (Form 1)
7 Architect’S Certificate Of Percentage Of Completion Of Work (Form 1)
8 Architect’S Certificate Of Percentage Of Completion Of Work (Form 1)
9 Architect’S Certificate Of Percentage Of Completion Of Work (Form 1)
10 Architect’S Certificate Of Percentage Of Completion Of Work (Form 1)
11 Architect’S Certificate Of Percentage Of Completion Of Work (Form 1)
1 Engineer’S Certificate On Cost Incurred On Project (Form 2)
2 Engineer’S Certificate On Cost Incurred On Project (Form 2)
3 Engineer’S Certificate On Cost Incurred On Project (Form 2)
4 Engineer’S Certificate On Cost Incurred On Project (Form 2)
5 Engineer’S Certificate On Cost Incurred On Project (Form 2)
6 Engineer’S Certificate On Cost Incurred On Project (Form 2)
7 Engineer’S Certificate On Cost Incurred On Project (Form 2)
8 Engineer’S Certificate On Cost Incurred On Project (Form 2)
9 Engineer’S Certificate On Cost Incurred On Project (Form 2)
10 Engineer’S Certificate On Cost Incurred On Project (Form 2)
11 Engineer’S Certificate On Cost Incurred On Project (Form 2)
1 Form 2A
1 Annual Audit Report Of Statutory CA (Form 5) (FY 2018-19)
1 Annual Audit Report Of Statutory CA (Form 5) (FY 2019-20)
1 Annual Audit Report Of Statutory CA (Form 5) (FY 2020-21)
1 Annual Audit Report Of Statutory CA (Form 5) (FY 2021-22)
1 Annual Audit Report Of Statutory CA (Form 5) (FY 2022-23)
1 Proforma Of Allotment Letter
2 Proforma Of Allotment Letter
3 Proforma Of Allotment Letter
4 Proforma Of Allotment Letter
5 Proforma Of Allotment Letter
6 Proforma Of Allotment Letter
7 Proforma Of Allotment Letter
8 Proforma Of Allotment Letter
9 Proforma Of Allotment Letter
Bank

Bank & Cost Disclosure

Declared project cost and the designated escrow account on file.

Project Account Bank CANARA BANK
IFSC CNRB0015350
Country/City