Squareyards Logo
Blogs
Sell or Rent Property
Login
Rera Banner
residential Ready to Move Source: rera.mh

Aliana IP Royal Villa RERA Details - P51700004584, Thane

View the RERA registration, promoter, approval, building, inventory, document and construction-progress disclosures for Aliana IP Royal Villa under registration P51700004584 in Thane, Maharashtra. Data is sourced from rera.mh.

RERA

RERA Snapshot

The most important statutory project disclosures, generated dynamically from available RERA fields.

  • RERA Number P51700004584
  • Project Name I.P.ROYAL VILLA
  • Project Type Residential / Group Housing
  • Project Status Ready to Move
  • State Maharashtra
  • District Thane
  • Taluka Thane
  • Village Mira-Bhayandar (M Corp.)
  • Original Completion 15 March 2019
  • Revised Completion 15 April 2025
  • Project Area (in Sq.mt.) 940.0
  • Total Buildings/Towers 1
  • Documents 48 Verified
Timeline

Project Timeline & Completion Details

Key statutory dates from registration through proposed completion and permit validity.

Proposed Start 09 August 2017 Expected commencement of civil works and foundation on site.
Original Completion 15 March 2019 Mandated date for project handover to the allottees and final compliance filing.
Revised Completion 15 April 2025 No revision filed against the original committed handover date.
Promoter

Promoter, Organisation & Member Details

Declared promoter entity, address and corporate identifiers on file with the authority.

Organisation Type Individual

Understand this Project's RERA details

Get clear answers and additional support from our RERA experts.

RERA Banner
Buildings

Buildings, Towers & Building-Level Details

Statutory building-level disclosures including tower height, sanctioned floors, structural counts and parking areas.

Building Detail
Project Name Name No. of Open Parking No. of Closed Parking No. of Floors No. of Habitable Floor No. of Sanctioned Apartment Wing Name
I.P.ROYAL VILLA I P ROYAL VILLA 3 1 8 0 0 NA

Scroll horizontally to view all building-level fields. Values marked "-" were not disclosed in the source RERA record.

Inventory

Unit Inventory & Configuration Details

Configuration mix and floor-level disclosures with both grouped and raw RERA views.

Total Units 18
Configurations 5
Inventory Type RESIDENTIAL
Configuration Distribution
SHOP 1 1 unit · avg area 11.45 Sq.mt.
2 BHK 14 units · avg area 55.05 Sq.mt.
SHOP 2 1 unit · avg area 15.37 Sq.mt.
SHOP 3 1 unit · avg area 12.00 Sq.mt.
SHOP 4 1 unit · avg area 11.74 Sq.mt.
  • I P ROYAL VILLA
Floor-Wise Inventory Explorer
Apartment Type Carpet Area No. of Apartment No. of Booked Apartment
2BHK a 55.74 7 5
2BHK b 54.36 7 4
SHOP 1 11.45 1 1
SHOP 2 15.37 1 1
SHOP 3 12.0 1 1
SHOP 4 11.74 1 0
Development

Development Works & Common Area Disclosures

Project-level common infrastructure disclosures as reported by the developer to the RERA authority.

Internal Roads & Footpaths % not reported Water Supply % not reported Sewerage (Chamber, Lines, Septic Tank , Stp) % not reported
Storm Water Drains % not reported Landscaping & Tree Planting % not reported Street Lighting % not reported
Community Buildings % not reported Treatment And Disposal Of Sewage And Sullage Water % not reported Solid Waste Management And Disposal % not reported
Water Conservation /Rain Water Harvesting % not reported Energy Managemcnt % not reported Fire Protection And Fire Safety Requirements % not reported
Electrical Meter Room, Sub-station, Receiving Station % not reported Aggregate Area Of Recreational Open Space % not reported Open Parking % not reported
Activity

Building Activity Progress

Statutory activity-wise construction progress as declared by the developer, per building/tower.

  • I P ROYAL VILLA
I P ROYAL VILLA · Overall Progress 91%
Excavation
Complete
% Work100%
Basement (if any)
Complete
% Work100%
Podiums (if any)
Not Started
% Work0%
Plinth
Complete
% Work100%
Stilt Floor
Complete
% Work100%
Slabs of Super Structure
Complete
% Work100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Complete
% Work100%
Sanitary Fittings within the flats / premises
Complete
% Work100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Complete
% Work100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Complete
% Work100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Complete
% Work100%
Documents

RERA Documents & Filings

All statutory documents uploaded by the promoter to the authority portal.

Mh Certificate Pdf
Mh Extension Certificate Pdf
Mh Details Html
1 1 Copy Of The Legal Title Report.Pdf
2 1 Details Of Encumbrances.Pdf
3 2 A Details Of Encumbrances Concerned To Finance.Pdf
4 1 B Details Of Encumbrances Concerned To Legal.Pdf
5 1 Copy Of Layout Approval (In Case Of Layout).Pdf
6 2 Copy Of Layout Approval (In Case Of Layout).Pdf
7 1 Building Plan Approval (IOD).Pdf
8 1 Commencement Certificates NA Order For Plotted Development.Pdf
9 2 Commencement Certificates NA Order For Plotted Development.Pdf
10 1 Declaration About Commencement Certificate.Pdf
11 1 Declaration In FORM B.Pdf
12 2 Declaration In FORM B.Pdf
13 1 Certificates Of Architect (Form 1)(Mandatory For Only Ongoing Project).Pdf
14 2 Certificates Of Architect (Form 1)(Mandatory For Only Ongoing Project).Pdf
15 3 Certificates Of Architect (Form 1)(Mandatory For Only Ongoing Project).Pdf
16 1 Certificates Of Engineer (Form 2)(Mandatory For Only Ongoing Project).Pdf
17 2 Certificates Of Engineer (Form 2)(Mandatory For Only Ongoing Project).Pdf
18 1 Engineers Certificate On Quality Assurance (Form 2A FY 2019 20).Pdf
19 2 Engineers Certificate On Quality Assurance (Form 2A FY 2019 20).Pdf
20 3 Engineers Certificate On Quality Assurance (Form 2A FY 2019 20).Pdf
21 1 Engineers Certificate On Quality Assurance (Form 2A FY 2020 21).Pdf
22 2 Engineers Certificate On Quality Assurance (Form 2A FY 2020 21).Pdf
23 1 Engineers Certificate On Quality Assurance (Form 2A FY 2021 22).Pdf
24 1 Engineers Certificate On Quality Assurance (Form 2A FY 2022 23).Pdf
25 1 Disclosure Of Sold Booked Inventory.Pdf
26 2 Disclosure Of Sold Booked Inventory.Pdf
27 1 CERSAI Details.Pdf
28 2 CERSAI Details.Pdf
29 3 Disclosure Of Sold Booked Inventory.Pdf
30 4 Disclosure Of Sold Booked Inventory.Pdf
31 1 Certificates Of CA (Form 3).Pdf
32 2 Certificates Of CA (Form 3).Pdf
33 1 Disclosure Of Interest In Other Real Estate Organizations.Pdf
34 1 Certificates Of CA (Form 5).Pdf
35 1 Annual Audit Report Of Statutory CA (Form 5) (FY 2018 19).Pdf
36 1 Annual Audit Report Of Statutory CA (Form 5) (FY 2019 20).Pdf
37 1 Annual Audit Report Of Statutory CA (Form 5) (FY 2020 21).Pdf
38 1 Annual Audit Report Of Statutory CA (Form 5) (FY 2021 22).Pdf
39 2 Annual Audit Report Of Statutory CA (Form 5) (FY 2021 22).Pdf
40 1 Annual Audit Report Of Statutory CA (Form 5) (FY 2022 23).Pdf
41 1 Proforma Of Allotment Letter.Pdf
42 1 Details Of Restarting Of Construction Work Post Lockdown.Pdf
43 1 Separate Bank Account Details Including No Encumbrances On The Bank Account Or No Escrow On The Same.Pdf
49 1 Engineers Certificate On Quality Assurance (Form 2A FY 2023 24).Pdf
50 2 Engineers Certificate On Quality Assurance (Form 2A FY 2023 24).Pdf
Bank

Bank & Cost Disclosure

Declared project cost and the designated escrow account on file.

Project Account Bank BASSEIN CATHOLIC COOPERATIVE BANK LIMITED
IFSC BACB0000014
Branch Address SHEETAL SAROVAR, SHEETA NAGAR, MIRA ROAD EAST, DIST THANE 401107
Country/City