The most important statutory project disclosures, generated dynamically from available RERA fields.

  • RERA Number P51700009797
  • Project Name UNIVERSE I PHASE I
  • Project Type Residential / Group Housing
  • Project Status Ready to Move
  • State Maharashtra
  • District Thane
  • Taluka Thane
  • Village Thane (M Corp.)
  • Original Completion 30 December 2023
  • Revised Completion 30 December 2023
  • Project Area (in Sq.mt.) 2,700.0
  • Total Buildings/Towers 1
  • Documents 38 Verified
Timeline

Project Timeline & Completion Details

Key statutory dates from registration through proposed completion and permit validity.

Proposed Start 22 August 2017 Expected commencement of civil works and foundation on site.
Original Completion 30 December 2023 Mandated date for project handover to the allottees and final compliance filing.
Revised Completion 30 December 2023 No revision filed against the original committed handover date.
Promoter

Promoter, Organisation & Member Details

Declared promoter entity, address and corporate identifiers on file with the authority.

Organisation Type Individual
Experience Details
Project NameAddressLand AreaProject StatusType of ProjectBuild Plot CountApartment countProposed Completion DateProject End DateLitigation PresentLitigation Details
Gausiya ComplexOpp Sunrise Towers Near Bharat Gears Shill Mumbra Thane 4006123000CompletedResidential / Group Housing132017-04-012017-04-01NoNA

Understand this Project's RERA details

Get clear answers and additional support from our RERA experts.

RERA Banner
Buildings

Buildings, Towers & Building-Level Details

Statutory building-level disclosures including tower height, sanctioned floors, structural counts and parking areas.

Building Detail
Project Name Name No. of Open Parking No. of Closed Parking No. of Floors No. of Habitable Floor No. of Sanctioned Apartment Wing Name
UNIVERSE I PHASE I A WING 0 0 15 0 0 NA

Scroll horizontally to view all building-level fields. Values marked "-" were not disclosed in the source RERA record.

Inventory

Unit Inventory & Configuration Details

Configuration mix and floor-level disclosures with both grouped and raw RERA views.

Total Units 66
Configurations 3
Inventory Type RESIDENTIAL
Configuration Distribution
1 BHK 14 units · avg area 31.27 Sq.mt.
2 BHK 42 units · avg area 50.57 Sq.mt.
SHOP 10 units · avg area 18.64 Sq.mt.
  • A WING
Floor-Wise Inventory Explorer
Apartment Type Carpet Area No. of Apartment No. of Booked Apartment
2 BHK 52.56 13 8
SHOP 17.62 1 0
SHOP 18.21 1 0
SHOP 19.52 3 2
2 BHK 47.26 1 0
SHOP 11.52 1 1
SHOP 28.76 1 0
2 BHK 46.92 13 9
2 BHK 52.65 1 1
2 BHK 52.96 1 1
1 BHK 31.27 14 10
SHOP 19.14 1 0
2 BHK 52.15 13 6
SHOP 16.32 2 2
Development

Development Works & Common Area Disclosures

Project-level common infrastructure disclosures as reported by the developer to the RERA authority.

Internal Roads & Footpaths 100.0% Water Supply 100.0% Sewerage (Chamber, Lines, Septic Tank , Stp) 100.0%
Storm Water Drains 100.0% Landscaping & Tree Planting 100.0% Street Lighting 100.0%
Community Buildings 100.0% Treatment And Disposal Of Sewage And Sullage Water 100.0% Solid Waste Management And Disposal 100.0%
Water Conservation /Rain Water Harvesting 100.0% Energy Managemcnt 100.0% Fire Protection And Fire Safety Requirements 100.0%
Electrical Meter Room, Sub-station, Receiving Station 100.0% Aggregate Area Of Recreational Open Space % not reported Open Parking % not reported
Activity

Building Activity Progress

Statutory activity-wise construction progress as declared by the developer, per building/tower.

  • A WING
A WING · Overall Progress 91%
Excavation
Complete
% Work100%
Basement (if any)
Complete
% Work100%
Podiums (if any)
Not Started
% Work0%
Plinth
Complete
% Work100%
Stilt Floor
Complete
% Work100%
Slabs of Super Structure
Complete
% Work100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Complete
% Work100%
Sanitary Fittings within the flats / premises
Complete
% Work100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Complete
% Work100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Complete
% Work100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Complete
% Work100%
Documents

RERA Documents & Filings

All statutory documents uploaded by the promoter to the authority portal.

Mh Certificate Pdf
Mh Details Html
1 1 PAN Card.Pdf
2 1 Copy Of The Legal Title Report.Pdf
3 1 Details Of Encumbrances.Pdf
4 1 Copy Of Layout Approval (In Case Of Layout).Pdf
5 1 Building Plan Approval (IOD).Pdf
6 1 Commencement Certificates NA Order For Plotted Development.Pdf
7 2 Commencement Certificates NA Order For Plotted Development.Pdf
8 1 Declaration About Commencement Certificate.Pdf
9 1 Declaration In FORM B.Pdf
10 1 Certificates Of Architect (Form 1)(Mandatory For Only Ongoing Project).Pdf
11 2 Certificates Of Architect (Form 1)(Mandatory For Only Ongoing Project).Pdf
12 3 Certificates Of Architect (Form 1)(Mandatory For Only Ongoing Project).Pdf
13 4 Certificates Of Architect (Form 1)(Mandatory For Only Ongoing Project).Pdf
14 5 Certificates Of Architect (Form 1)(Mandatory For Only Ongoing Project).Pdf
15 6 Certificates Of Architect (Form 1)(Mandatory For Only Ongoing Project).Pdf
16 7 Certificates Of Architect (Form 1)(Mandatory For Only Ongoing Project).Pdf
17 1 Certificates Of Engineer (Form 2)(Mandatory For Only Ongoing Project).Pdf
18 2 Certificates Of Engineer (Form 2)(Mandatory For Only Ongoing Project).Pdf
19 1 Engineers Certificate On Quality Assurance (Form 2A FY 2022 23).Pdf
20 1 Engineers Certificate On Quality Assurance (Form 2A FY 2023 24).Pdf
21 1 Disclosure Of Sold Booked Inventory.Pdf
22 2 Disclosure Of Sold Booked Inventory.Pdf
23 3 Disclosure Of Sold Booked Inventory.Pdf
24 1 Certificates Of CA (Form 3).Pdf
25 1 Annual Audit Report Of Statutory CA (Form 5).Pdf
26 2 Annual Audit Report Of Statutory CA (Form 5).Pdf
27 1 Annual Audit Report Of Statutory CA (Form 5) (FY 2019 20).Pdf
28 1 Annual Audit Report Of Statutory CA (Form 5) (FY 2020 21).Pdf
29 1 Annual Audit Report Of Statutory CA (Form 5) (FY 2021 22).Pdf
30 1 Annual Audit Report Of Statutory CA (Form 5) (FY 2022 23).Pdf
31 1 Proforma Of Allotment Letter.Pdf
32 2 Proforma Of Allotment Letter.Pdf
33 1 Occupancy Certificate Completion Certificate Architect'S Certificate Of Completion For Plotted Development.Pdf
34 4 Architect’S Certificate On Completion Of Project (Form 4).Pdf
35 1 Status Of Formation Of Legal Entity (Society Co Op Etc.).Pdf
36 1 Status Of Conveyance.Pdf
Bank

Bank & Cost Disclosure

Declared project cost and the designated escrow account on file.

Project Account Bank DCB BANK LIMITED
IFSC DCBL0000029
Branch Address NEAR SAHIL RESTAURANT, OLD MUMBAI PUNE ROAD, KAUSA, MUMBRA 400612
Country/City