Happy Home Residency RERA Details - P51700022362, Thane

View the RERA registration, promoter, approval, building, inventory, document and construction-progress disclosures for Happy Home Residency under registration P51700022362 in Thane, MAHARASHTRA. Data is sourced from rera.mh.

RERA

RERA Snapshot

The most important statutory project disclosures, generated dynamically from available RERA fields.

  • RERA Number P51700022362
  • Project Name Happy Home Residency CD
  • Project Type Residential
  • Project Status Ready to Move
  • State MAHARASHTRA
  • District Thane
  • Taluka Thane
  • Village Mira-Bhayandar (M Corp.)
  • Original Completion 30 September 2020
  • Project Area (in Sq.mt.) 861.27
  • Total Buildings/Towers 2
  • Documents 14 Verified
Timeline

Project Timeline & Completion Details

Key statutory dates from registration through proposed completion and permit validity.

Proposed Start 16 September 2019 Expected commencement of civil works and foundation on site.
Original Completion 30 September 2020 Mandated date for project handover to the allottees and final compliance filing.
Promoter

Promoter, Organisation & Member Details

Declared promoter entity, address and corporate identifiers on file with the authority.

Organisation Type Partnership
Individule Name Happy Home Residency
Other Description NA

Promoters, Co-promoters & Members

NameRole
Viraj Nalin ShethAuthorized Signatory
Nalin Navalchand ShethAuthorized Signatory

Understand this Project's RERA details

Get clear answers and additional support from our RERA experts.

RERA Banner
Buildings

Buildings, Towers & Building-Level Details

Statutory building-level disclosures including tower height, sanctioned floors, structural counts and parking areas.

Building Detail
Project Name Name Date of Completion No. of Basements No. of Plinth No. of Podium No. of Slab No. of Slits No. of Open Parking No. of Closed Parking
Happy Home Residency CD HAPPY HOME RESIDENCY WING C 2020-03-31 0 1 0 13 1 14 1
Happy Home Residency CD HAPPY HOME RESIDENCY WIG D 2020-03-31 0 1 0 13 1 2 1

Scroll horizontally to view all building-level fields. Values marked "-" were not disclosed in the source RERA record.

Inventory

Unit Inventory & Configuration Details

Configuration mix and floor-level disclosures with both grouped and raw RERA views.

Total Units 118
Configurations 2
Inventory Type RESIDENTIAL
Configuration Distribution
1 BHK 47 units · avg area 35.39 Sq.mt.
2 BHK 71 units · avg area 55.69 Sq.mt.
  • HAPPY HOME RESIDENCY WING C
  • HAPPY HOME RESIDENCY WIG D
Floor-Wise Inventory Explorer
Apartment Type Carpet Area No. of Apartment No. of Booked Apartment
2BHK 58.43 24 0
2BHK 57.71 23 0
2BHK 51.19 12 0
2BHK 50.83 12 0
Parking

Parking, Garage & Area Details

Parking provision declared in the sanctioned plan.

Type Proposed Booked Work Done
Garage 0 0 0
Covered Parking 32 0 100
Development

Development Works & Common Area Disclosures

Project-level common infrastructure disclosures as reported by the developer to the RERA authority.

Internal Roads Footpaths 50% Water Conservation Rainwater Harvesting 100% Energy Management % not reported
Fire Protection And Fire Safety Requirements 80% Electrical Meter Room Substation Receivingstation 90% Aggregate Area Of Recreational Open Space 100%
Open Parking 100% Water Supply % not reported Sewerage 100%
Storm Water Drains 80% Landscaping Tree Planting 100% Street Lighting 75%
Community Buildings % not reported Treatment And Disposal Of Sewage Sullage Water % not reported Solid Waste Management Disposal % not reported
Activity

Building Activity Progress

Statutory activity-wise construction progress as declared by the developer, per building/tower.

  • HAPPY HOME RESIDENCY WING C
  • HAPPY HOME RESIDENCY WIG D
HAPPY HOME RESIDENCY WING C · Overall Progress 90%
Excavation
Complete
% Work100%
X number of Basement(s) and Plinth
Complete
% Work100%
X number of Podiums
Complete
% Work100%
Stilt Floor
Complete
% Work100%
X number of Slabs of Super Structure
Complete
% Work100%
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Complete
% Work100%
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
In Progress
% Work80%
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
In Progress
% Work80%
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
In Progress
% Work80%
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
In Progress
% Work60%
Documents

RERA Documents & Filings

All statutory documents uploaded by the promoter to the authority portal.

Mh Details Html
Mh Certificate Pdf
Mh Details Pdf
1 Copy Of The Legal Title Report
2 Copy Of The Legal Title Report
1 Details Of Encumbrances
1 Copy Of Layout Approval (In Case Of Layout)
1 Building Plan Approval / NA Order For Plotted Development
2 Building Plan Approval / NA Order For Plotted Development
1 Commencement Certificates / NA Order For Plotted Development
1 Declaration In FORM B
1 Architect’S Certificate Of Percentage Of Completion Of Work (Form 1)
1 Engineer’S Certificate On Cost Incurred On Project (Form 2)
1 Proforma Of Allotment Letter
Bank

Bank & Cost Disclosure

Declared project cost and the designated escrow account on file.

Project Account Bank Bank of India
IFSC BKID0000005
Country/City