Squareyards Logo
Blogs
Sell or Rent Property
Login
Rera Banner
residential Ready to Move Source: rera.mh

Shree Sai Shweta Heights RERA Details - P51700029110, Thane

View the RERA registration, promoter, approval, building, inventory, document and construction-progress disclosures for Shree Sai Shweta Heights under registration P51700029110 in Thane, Maharashtra. Data is sourced from rera.mh.

RERA

RERA Snapshot

The most important statutory project disclosures, generated dynamically from available RERA fields.

  • RERA Number P51700029110
  • Project Name SHWETA HEIGHTS
  • Project Type Others
  • Project Status Ready to Move
  • State Maharashtra
  • District Thane
  • Taluka Thane
  • Village Mira-Bhayandar (M Corp.)
  • Original Completion 31 March 2026
  • Revised Completion 31 March 2027
  • Project Area (in Sq.mt.) 3,560.0
  • Total Buildings/Towers 2
  • Documents 79 Verified
Timeline

Project Timeline & Completion Details

Key statutory dates from registration through proposed completion and permit validity.

Proposed Start 26 April 2021 Expected commencement of civil works and foundation on site.
Original Completion 31 March 2026 Mandated date for project handover to the allottees and final compliance filing.
Revised Completion 31 March 2027 No revision filed against the original committed handover date.
Promoter

Promoter, Organisation & Member Details

Declared promoter entity, address and corporate identifiers on file with the authority.

Organisation Type Partnership
Individule Name SHREE SAI ASSOCIATES

Promoters, Co-promoters & Members

NameRoleAddress
NARHAR NARAYAN MHATREPartnerThane, MAHARASHTRA
GAURAV NANDKUMAR MHATREPartnerThane, MAHARASHTRA
SHWETA NANDKUMAR MHATREPartnerThane, MAHARASHTRA
Location

Land, Address & Location Details

Land parcel, zoning and geo-coordinates as recorded in the project filing.

Address 4TBgHDcYeG64BTtIKQSnS0R8KhG3AkKKrIAbRhk1yupXB9g3luqEOgCTMu6gGclu4ZNSVShzDDHW69jnYwDu6/6vK7ZXtUhGfFBuF7t3l8K/9iQFFJ2uDn/kfP74UFm3

RERA Coordinates

Latitude, Longitude 19.272591, 72.87839269999999

Understand this Project's RERA details

Get clear answers and additional support from our RERA experts.

RERA Banner
Buildings

Buildings, Towers & Building-Level Details

Statutory building-level disclosures including tower height, sanctioned floors, structural counts and parking areas.

Building Detail
Project Name Name No. of Open Parking No. of Closed Parking No. of Floors CC Issued No. of Habitable Floor No. of Sanctioned Apartment Wing Name
SHWETA HEIGHTS SHWETA HEIGHTS BUILDING NO 1 0 0 49 49 49 107 NA
SHWETA HEIGHTS SHWETA HEIGHTS BUILDING NO 2 0 36 50 50 50 50 NA

Scroll horizontally to view all building-level fields. Values marked "-" were not disclosed in the source RERA record.

Inventory

Unit Inventory & Configuration Details

Configuration mix and floor-level disclosures with both grouped and raw RERA views.

Total Units 157
Configurations 4
Inventory Type RESIDENTIAL
Configuration Distribution
1 BHK 62 units · avg area 45.00 Sq.mt.
2 BHK 68 units · avg area 65.04 Sq.mt.
Shop 26 units · avg area 32.26 Sq.mt.
Office space 1 unit · avg area 55.88 Sq.mt.
  • SHWETA HEIGHTS BUILDING NO 1
  • SHWETA HEIGHTS BUILDING NO 2
Floor-Wise Inventory Explorer
Apartment Type Carpet Area No. of Apartment No. of Booked Apartment
1BHK 41.31 20 11
Shop 60.63 1 0
Shop 14.08 2 0
Shop 16.67 2 0
Shop 22.0 1 0
Shop 23.2 6 0
Shop 27.98 3 0
Shop 29.9 1 0
Shop 30.56 1 0
Shop 35.16 1 0
1BHK 45.3 20 11
Shop 41.23 2 0
Shop 44.84 2 0
Shop 45.13 2 0
Shop 53.88 1 0
Office space 55.88 1 0
Shop 59.56 1 0
1BHK 48.08 22 15
2BHK 75.89 18 11
Development

Development Works & Common Area Disclosures

Project-level common infrastructure disclosures as reported by the developer to the RERA authority.

Internal Roads & Footpaths % not reported Water Supply % not reported Sewerage (Chamber, Lines, Septic Tank , Stp) % not reported
Storm Water Drains % not reported Landscaping & Tree Planting % not reported Street Lighting % not reported
Community Buildings % not reported Treatment And Disposal Of Sewage And Sullage Water % not reported Solid Waste Management And Disposal % not reported
Water Conservation /Rain Water Harvesting % not reported Energy Managemcnt % not reported Fire Protection And Fire Safety Requirements % not reported
Electrical Meter Room, Sub-station, Receiving Station % not reported Aggregate Area Of Recreational Open Space % not reported Open Parking % not reported
Side Margin Pavement 50.0%
Activity

Building Activity Progress

Statutory activity-wise construction progress as declared by the developer, per building/tower.

  • SHWETA HEIGHTS BUILDING NO 1
  • SHWETA HEIGHTS BUILDING NO 2
SHWETA HEIGHTS BUILDING NO 1 · Overall Progress 91%
Excavation
Complete
% Work100%
Basement (if any)
Complete
% Work100%
Podiums (if any)
Not Started
% Work0%
Plinth
Complete
% Work100%
Stilt Floor
Complete
% Work100%
Slabs of Super Structure
Complete
% Work100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Complete
% Work100%
Sanitary Fittings within the flats / premises
Complete
% Work100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Complete
% Work100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Complete
% Work100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Complete
% Work100%
Documents

RERA Documents & Filings

All statutory documents uploaded by the promoter to the authority portal.

Mh Certificate Pdf
Mh Extension Certificate Pdf
Mh Details Html
1 1 PAN Card.Pdf
2 1 Copy Of The Legal Title Report.Pdf
3 1 Details Of Encumbrances.Pdf
4 1 Copy Of Layout Approval (In Case Of Layout).Pdf
5 2 Copy Of Layout Approval (In Case Of Layout).Pdf
6 3 Copy Of Layout Approval (In Case Of Layout).Pdf
7 4 Copy Of Layout Approval (In Case Of Layout).Pdf
8 5 Copy Of Layout Approval (In Case Of Layout).Pdf
9 1 Building Plan Approval NA Order For Plotted Development.Pdf
10 2 Building Plan Approval NA Order For Plotted Development.Pdf
11 1 Commencement Certificates NA Order For Plotted Development.Pdf
12 2 Commencement Certificates NA Order For Plotted Development.Pdf
13 3 Commencement Certificates NA Order For Plotted Development.Pdf
14 1 Declaration In FORM B.Pdf
15 1 Architect’S Certificate Of Percentage Of Completion Of Work (Form 1).Pdf
16 2 Architect’S Certificate Of Percentage Of Completion Of Work (Form 1).Pdf
17 3 Architect’S Certificate Of Percentage Of Completion Of Work (Form 1).Pdf
18 4 Architect’S Certificate Of Percentage Of Completion Of Work (Form 1).Pdf
19 5 Architect’S Certificate Of Percentage Of Completion Of Work (Form 1).Pdf
20 6 Architect’S Certificate Of Percentage Of Completion Of Work (Form 1).Pdf
21 7 Architect’S Certificate Of Percentage Of Completion Of Work (Form 1).Pdf
22 8 Architect’S Certificate Of Percentage Of Completion Of Work (Form 1).Pdf
23 9 Architect’S Certificate Of Percentage Of Completion Of Work (Form 1).Pdf
24 10 Architect’S Certificate Of Percentage Of Completion Of Work (Form 1).Pdf
25 11 Architect’S Certificate Of Percentage Of Completion Of Work (Form 1).Pdf
26 12 Architect’S Certificate Of Percentage Of Completion Of Work (Form 1).Pdf
27 13 Architect’S Certificate Of Percentage Of Completion Of Work (Form 1).Pdf
28 14 Architect’S Certificate Of Percentage Of Completion Of Work (Form 1).Pdf
29 1 Engineer’S Certificate On Cost Incurred On Project (Form 2).Pdf
30 2 Engineer’S Certificate On Cost Incurred On Project (Form 2).Pdf
31 3 Engineer’S Certificate On Cost Incurred On Project (Form 2).Pdf
32 4 Engineer’S Certificate On Cost Incurred On Project (Form 2).Pdf
33 5 Engineer’S Certificate On Cost Incurred On Project (Form 2).Pdf
34 6 Engineer’S Certificate On Cost Incurred On Project (Form 2).Pdf
35 7 Engineer’S Certificate On Cost Incurred On Project (Form 2).Pdf
36 8 Engineer’S Certificate On Cost Incurred On Project (Form 2).Pdf
37 9 Engineer’S Certificate On Cost Incurred On Project (Form 2).Pdf
38 10 Engineer’S Certificate On Cost Incurred On Project (Form 2).Pdf
39 11 Engineer’S Certificate On Cost Incurred On Project (Form 2).Pdf
40 12 Engineer’S Certificate On Cost Incurred On Project (Form 2).Pdf
41 13 Engineer’S Certificate On Cost Incurred On Project (Form 2).Pdf
42 14 Engineer’S Certificate On Cost Incurred On Project (Form 2).Pdf
43 1 Engineers Certificate On Quality Assurance (Form 2A FY 2020 21).Pdf
44 1 Disclosure Of Sold Booked Inventory.Pdf
45 1 CA Certificate On Project Cost & Fund Withdrawal (Form 3).Pdf
46 2 CA Certificate On Project Cost & Fund Withdrawal (Form 3).Pdf
47 3 CA Certificate On Project Cost & Fund Withdrawal (Form 3).Pdf
48 4 CA Certificate On Project Cost & Fund Withdrawal (Form 3).Pdf
49 5 CA Certificate On Project Cost & Fund Withdrawal (Form 3).Pdf
50 6 CA Certificate On Project Cost & Fund Withdrawal (Form 3).Pdf
51 7 CA Certificate On Project Cost & Fund Withdrawal (Form 3).Pdf
52 8 CA Certificate On Project Cost & Fund Withdrawal (Form 3).Pdf
53 9 CA Certificate On Project Cost & Fund Withdrawal (Form 3).Pdf
54 10 CA Certificate On Project Cost & Fund Withdrawal (Form 3).Pdf
55 11 CA Certificate On Project Cost & Fund Withdrawal (Form 3).Pdf
56 12 CA Certificate On Project Cost & Fund Withdrawal (Form 3).Pdf
57 13 CA Certificate On Project Cost & Fund Withdrawal (Form 3).Pdf
58 1 Annual Audit Report Of Statutory CA (Form 5) (FY 2021 22).Pdf
59 1 Annual Audit Report Of Statutory CA (Form 5) (FY 2022 23).Pdf
60 1 Proforma Of Allotment Letter.Pdf
61 2 Proforma Of Allotment Letter.Pdf
62 3 Proforma Of Allotment Letter.Pdf
63 4 Proforma Of Allotment Letter.Pdf
64 1 Other.Pdf
65 2 Other.Pdf
66 3 Other.Pdf
67 4 Other.Pdf
68 5 Other.Pdf
75 1 Annual Audit Report Of Statutory CA (Form 5) (FY 2023 24).Pdf
76 Form 1.Pdf
77 Form 2.Pdf
78 Form 3.Pdf
79 Disclosure Of Sold And Booked Inventory.Pdf
92 Form 5 (FY 2021 2022).Pdf
93 Form 5 (FY 2022 2023).Pdf
94 Form 5 (FY 2023 2024).Pdf
Bank

Bank & Cost Disclosure

Declared project cost and the designated escrow account on file.

Project Account Bank HDFC BANK
IFSC HDFC0001116
Branch Address KASTURI UDYOG, SHOP NO 1, 2, 3, NEAR PHATAK, BHAYANDAR EAST, THANE - 401101
Country/City