Squareyards Logo
Blogs
Download App Sell or Rent Property
Login
Rera Banner
commercial Under Construction Source: rera.mh

Devansh Thorat Icon RERA Details - P52100079125, Pune

View the RERA registration, promoter, approval, building, inventory, document and construction-progress disclosures for Devansh Thorat Icon under registration P52100079125 in Pune, Maharashtra. Data is sourced from rera.mh.

RERA

RERA Snapshot

The most important statutory project disclosures, generated dynamically from available RERA fields.

  • RERA Number P52100079125
  • Project Name Thorat Icon
  • Project Type Commercial
  • Project Status Under Construction
  • State Maharashtra
  • District Pune
  • Taluka Indapur
  • Village Bhigvan
  • Original Completion 28 October 2026
  • Revised Completion 28 October 2026
  • Project Area (in Sq.mt.) 1,363.0
  • Total Buildings/Towers 1
  • Documents 5 Verified
Timeline

Project Timeline & Completion Details

Key statutory dates from registration through proposed completion and permit validity.

Proposed Start 06 February 2025 Expected commencement of civil works and foundation on site.
Original Completion 28 October 2026 Mandated date for project handover to the allottees and final compliance filing.
Revised Completion 28 October 2026 No revision filed against the original committed handover date.
Promoter

Promoter, Organisation & Member Details

Declared promoter entity, address and corporate identifiers on file with the authority.

Organisation Type Partnership
Individual Name DEVANSH PROMOTER AND DEVELOPERS
Location

Land, Address & Location Details

Land parcel, zoning and geo-coordinates as recorded in the project filing.

Survey Number CTS No 278 of Mouje- Bhigwan

Boundary Details

Boundaries East CTS No 282 and 279 Boundaries West Pune - Solapur National Highway
Boundaries South CTS No 284 and 285 Boundaries North Remaining Landin CTS no 278

RERA Coordinates

Latitude, Longitude 18.28465683634494, 74.75678916406251

Understand this Project's RERA details

Get clear answers and additional support from our RERA experts.

RERA Banner
Buildings

Buildings, Towers & Building-Level Details

Statutory building-level disclosures including tower height, sanctioned floors, structural counts and parking areas.

Building Detail
Project Name Name No. of Open Parking No. of Closed Parking No. of Floors CC Issued No. of Habitable Floor No. of Sanctioned Apartment Wing Name
Thorat Icon Thorat Icon 31 0 9 9 0 59 NA

Scroll horizontally to view all building-level fields. Values marked "-" were not disclosed in the source RERA record.

Inventory

Unit Inventory & Configuration Details

Configuration mix and floor-level disclosures with both grouped and raw RERA views.

Total Units 59
Configurations 5
Inventory Type COMMERCIAL
Configuration Distribution
1RK 3 units · avg area 68.74 Sq.mt.
2 BHK 2 units · avg area 147.13 Sq.mt.
Office space 34 units · avg area 58.45 Sq.mt.
Storage 8 units · avg area 34.03 Sq.mt.
Shop 12 units · avg area 35.48 Sq.mt.
  • Thorat Icon
Floor-Wise Inventory Explorer
Apartment Type Carpet Area No. of Apartment No. of Booked Apartment
Office space 50.55 7 0
Office space 27.78 2 0
Office space 18.27 1 0
Office space 18.2 2 0
Office space 75.14 12 0
Office space 96.08 3 0
Storage 34.03 8 0
Shop 27.78 2 0
Shop 18.27 1 0
Office space 49.86 1 0
Shop 18.2 2 0
2BHK 147.14 1 0
1RK 96.08 1 0
1RK 38.86 1 0
Office space 31.03 3 0
Office space 63.45 3 0
2BHK 147.12 1 0
1RK 71.28 1 0
Shop 45.07 7 3
Development

Development Works & Common Area Disclosures

Project-level common infrastructure disclosures as reported by the developer to the RERA authority.

Internal Roads & Footpaths % not reported Water Supply % not reported Sewerage (Chamber, Lines, Septic Tank , Stp) % not reported
Storm Water Drains % not reported Landscaping & Tree Planting % not reported Street Lighting % not reported
Community Buildings % not reported Treatment And Disposal Of Sewage And Sullage Water % not reported Solid Waste Management And Disposal % not reported
Water Conservation /Rain Water Harvesting % not reported Energy Managemcnt % not reported Fire Protection And Fire Safety Requirements % not reported
Electrical Meter Room, Sub-station, Receiving Station % not reported Aggregate Area Of Recreational Open Space % not reported Open Parking % not reported
Activity

Building Activity Progress

Statutory activity-wise construction progress as declared by the developer, per building/tower.

  • Thorat Icon
Thorat Icon · Overall Progress 56%
Excavation
Complete
% Work100%
Basement (if any)
Complete
% Work100%
Podiums (if any)
Not Started
% Work0%
Plinth
Complete
% Work100%
Stilt Floor
Complete
% Work100%
Slabs of Super Structure
In Progress
% Work95%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
In Progress
% Work35%
Sanitary Fittings within the flats / premises
Not Started
% Work0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
In Progress
% Work85%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Not Started
% Work0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Not Started
% Work0%
Documents

RERA Documents & Filings

All statutory documents uploaded by the promoter to the authority portal.

Mh Certificate Pdf
Mh Details Html
48 Form 2A (FY 2024 2025).Pdf
49 Form 2A (FY 2025 2026).Pdf
50 Form 5 (FY 2024 2025).Pdf
Bank

Bank & Cost Disclosure

Declared project cost and the designated escrow account on file.

Project Account Bank STATE BANK OF INDIA
IFSC SBIN0000321
Branch Address BHIGWAN RD., BARAMATI, PUNE - 413102
Country/City