RERA Snapshot
The most important statutory project disclosures, generated dynamically from available RERA fields.
- RERA Number P52100045737
- Project Name ATUR VALLEY VISTA WING A
- Project Type Residential / Group Housing
- Project Status Ready to Move
- State Maharashtra
- District Pune
- Taluka Haveli
- Village Pisoli
- Original Completion 31 December 2025
- Revised Completion 31 December 2027
- Project Area (in Sq.mt.) 1,053.75
- Total Buildings/Towers 1
- Documents 13 Verified
Project Timeline & Completion Details
Key statutory dates from registration through proposed completion and permit validity.
Promoter, Organisation & Member Details
Declared promoter entity, address and corporate identifiers on file with the authority.
Promoters, Co-promoters & Members
Land, Address & Location Details
Land parcel, zoning and geo-coordinates as recorded in the project filing.
| Survey Number NEW S NO 44/2/2/3/1/1 PLOT, (OLD S NO. 44/2/2/2, 44/2/1/2, 44/2/1/3, 44/2/2/1 AND 44/2/2/3) VILLAGE PISOLI, TALUKA HAVELI | |
Boundary Details |
|
| Boundaries East BY 12 METER WIDE INTERNAL ROAD OF SAME LAYOUT | Boundaries West BY ADJ HISSA NO 3 5 AFTER REAR MARGIN |
| Boundaries South BY AMENITY SPACE AFTER 6 METER WIDE DRIVE WAY | Boundaries North BY WING B OF SAME LAYOUT |
RERA Coordinates |
|
| Latitude, Longitude 18.4491966, 73.9077818 | |
Buildings, Towers & Building-Level Details
Statutory building-level disclosures including tower height, sanctioned floors, structural counts and parking areas.
Scroll horizontally to view all building-level fields. Values marked "-" were not disclosed in the source RERA record.
Unit Inventory & Configuration Details
Configuration mix and floor-level disclosures with both grouped and raw RERA views.
Development Works & Common Area Disclosures
Project-level common infrastructure disclosures as reported by the developer to the RERA authority.
| Internal Roads & Footpaths 100.0% | Water Supply % not reported | Sewerage (Chamber, Lines, Septic Tank , Stp) 100.0% |
| Storm Water Drains 100.0% | Landscaping & Tree Planting 100.0% | Street Lighting 100.0% |
| Community Buildings 100.0% | Treatment And Disposal Of Sewage And Sullage Water 100.0% | Solid Waste Management And Disposal 100.0% |
| Water Conservation /Rain Water Harvesting 100.0% | Energy Managemcnt 100.0% | Fire Protection And Fire Safety Requirements 100.0% |
| Electrical Meter Room, Sub-station, Receiving Station 100.0% | Aggregate Area Of Recreational Open Space % not reported | Open Parking % not reported |
Building Activity Progress
Statutory activity-wise construction progress as declared by the developer, per building/tower.
RERA Documents & Filings
All statutory documents uploaded by the promoter to the authority portal.
Bank & Cost Disclosure
Declared project cost and the designated escrow account on file.
| Project Account Bank | BANK OF BARODA |
|---|---|
| IFSC | BARB0POOCAM |
| Branch Address | 2A, MOLEDINA ROAD, PUNE 411001 |