RERA Snapshot
The most important statutory project disclosures, generated dynamically from available RERA fields.
- RERA Number P51800001920
- Project Name Heena Presidency
- Project Type Residential / Group Housing
- Project Status Ready to Move
- State Maharashtra
- District Thane
- Taluka Thane
- Village Mira-Bhayandar (M Corp.)
- Original Completion 30 December 2024
- Revised Completion 31 December 2026
- Project Area (in Sq.mt.) 1,371.7
- Total Buildings/Towers 1
- Documents 136 Verified
Project Timeline & Completion Details
Key statutory dates from registration through proposed completion and permit validity.
Promoter, Organisation & Member Details
Declared promoter entity, address and corporate identifiers on file with the authority.
Land, Address & Location Details
Land parcel, zoning and geo-coordinates as recorded in the project filing.
| Address qgUvrR/nVcRIPR5pAUAvBR5vQOQNxzoMrxXGnYq5rWf3wqI0QErtY4Z9UHF7b8az |
RERA Coordinates |
|
| Latitude, Longitude 19.272591, 72.87839269999999 | |
Buildings, Towers & Building-Level Details
Statutory building-level disclosures including tower height, sanctioned floors, structural counts and parking areas.
Scroll horizontally to view all building-level fields. Values marked "-" were not disclosed in the source RERA record.
Unit Inventory & Configuration Details
Configuration mix and floor-level disclosures with both grouped and raw RERA views.
Development Works & Common Area Disclosures
Project-level common infrastructure disclosures as reported by the developer to the RERA authority.
| Internal Roads & Footpaths % not reported | Water Supply 80.0% | Sewerage (Chamber, Lines, Septic Tank , Stp) 100.0% |
| Storm Water Drains 100.0% | Landscaping & Tree Planting % not reported | Street Lighting % not reported |
| Community Buildings % not reported | Treatment And Disposal Of Sewage And Sullage Water 100.0% | Solid Waste Management And Disposal 100.0% |
| Water Conservation /Rain Water Harvesting 100.0% | Energy Managemcnt 100.0% | Fire Protection And Fire Safety Requirements 100.0% |
| Electrical Meter Room, Sub-station, Receiving Station 100.0% | Aggregate Area Of Recreational Open Space % not reported | Open Parking % not reported |
Building Activity Progress
Statutory activity-wise construction progress as declared by the developer, per building/tower.
RERA Documents & Filings
All statutory documents uploaded by the promoter to the authority portal.
Bank & Cost Disclosure
Declared project cost and the designated escrow account on file.
| Project Account Bank | PUNJAB NATIONAL BANK |
|---|---|
| IFSC | PUNB0128600 |
| Branch Address | Mathuradas Road, Kandivali West |