Squareyards Logo
Blogs
Sell or Rent Property
Login
Rera Banner
residential Ready to Move Source: rera.mh

Bharat The Province RERA Details - P52100018824, Pune

View the RERA registration, promoter, approval, building, inventory, document and construction-progress disclosures for Bharat The Province under registration P52100018824 in Pune, MAHARASHTRA. Data is sourced from rera.mh.

RERA

RERA Snapshot

The most important statutory project disclosures, generated dynamically from available RERA fields.

  • RERA Number P52100018824
  • Project Name The Province Phase I
  • Project Type Residential
  • Project Status Ready to Move
  • State MAHARASHTRA
  • District Pune
  • Taluka Mulshi
  • Original Completion 30 October 2023
  • Revised Completion 30 April 2024
  • Project Area (in Sq.mt.) 3,810.89
  • Total Buildings/Towers 3
  • Documents 81 Verified
Timeline

Project Timeline & Completion Details

Key statutory dates from registration through proposed completion and permit validity.

Proposed Start 06 December 2018 Expected commencement of civil works and foundation on site.
Original Completion 30 October 2023 Mandated date for project handover to the allottees and final compliance filing.
Revised Completion 30 April 2024 No revision filed against the original committed handover date.
Promoter

Promoter, Organisation & Member Details

Declared promoter entity, address and corporate identifiers on file with the authority.

Organisation Type Partnership
Individule Name Bharat Developers
Other Description NA

Promoters, Co-promoters & Members

NameRole
Rohit Tulsidas HarwaniPartner
Preyesh Ghansham DaswaniAuthorized Signatory
Rajkumari Ghansham DaswaniPartner
Bharat Ghansham DaswaniPartner
Kundan Ramchandra JachakPartner
Rahul Tulsidas HarwaniPartner

Understand this Project's RERA details

Get clear answers and additional support from our RERA experts.

RERA Banner
Buildings

Buildings, Towers & Building-Level Details

Statutory building-level disclosures including tower height, sanctioned floors, structural counts and parking areas.

Building Detail
Project Name Name Date of Completion No. of Basements No. of Plinth No. of Podium No. of Slab No. of Slits No. of Open Parking No. of Closed Parking
The Province Phase I A2 Wing 2023-04-30 1 1 0 12 1 0 34
The Province Phase I C Wing 2023-04-30 1 1 0 12 1 0 36
The Province Phase I D Wing 2023-04-30 1 1 0 12 1 0 58

Scroll horizontally to view all building-level fields. Values marked "-" were not disclosed in the source RERA record.

Inventory

Unit Inventory & Configuration Details

Configuration mix and floor-level disclosures with both grouped and raw RERA views.

Total Units 141
Configurations 6
Inventory Type RESIDENTIAL
Configuration Distribution
1 BHK 3 units · avg area 52.65 Sq.mt.
2RHK 64 units · avg area 54.55 Sq.mt.
2 BHK 7 units · avg area 61.58 Sq.mt.
2.5RHK 43 units · avg area 73.58 Sq.mt.
3RHK 22 units · avg area 94.13 Sq.mt.
5 BHK 2 units · avg area 77.14 Sq.mt.
  • A2 Wing
  • C Wing
  • D Wing
Floor-Wise Inventory Explorer
Apartment Type Carpet Area No. of Apartment No. of Booked Apartment
2RHK 52.37 11 6
2RHK 52.35 10 6
2RHK 56.55 22 16
2BHK 61.95 02 00
2BHK 63.02 01 00
1BHK 51.48 01 00
Parking

Parking, Garage & Area Details

Parking provision declared in the sanctioned plan.

Type Proposed Booked Work Done
Garage 0 0 0
Covered Parking 128 0 0
Development

Development Works & Common Area Disclosures

Project-level common infrastructure disclosures as reported by the developer to the RERA authority.

Internal Roads Footpaths 20% Water Conservation Rainwater Harvesting 50% Energy Management % not reported
Fire Protection And Fire Safety Requirements 70% Electrical Meter Room Substation Receivingstation 10% Aggregate Area Of Recreational Open Space % not reported
Open Parking 40% Water Supply % not reported Sewerage % not reported
Storm Water Drains 30% Landscaping Tree Planting 50% Street Lighting % not reported
Community Buildings % not reported Treatment And Disposal Of Sewage Sullage Water % not reported Solid Waste Management Disposal 50%
Activity

Building Activity Progress

Statutory activity-wise construction progress as declared by the developer, per building/tower.

  • A2 Wing
  • C Wing
  • D Wing
A2 Wing · Overall Progress 79%
Excavation
Complete
% Work100%
X number of Basement(s) and Plinth
Complete
% Work100%
X number of Podiums
Not Started
% Work0%
Stilt Floor
Complete
% Work100%
X number of Slabs of Super Structure
Complete
% Work100%
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Complete
% Work100%
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
In Progress
% Work65%
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Complete
% Work100%
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
In Progress
% Work97%
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
In Progress
% Work30%
Documents

RERA Documents & Filings

All statutory documents uploaded by the promoter to the authority portal.

Mh Details Html
Mh Certificate Pdf
Mh Details Pdf
1 Copy Of The Legal Title Report
1 Details Of Encumbrances
1 Copy Of Layout Approval (In Case Of Layout)
2 Copy Of Layout Approval (In Case Of Layout)
3 Copy Of Layout Approval (In Case Of Layout)
4 Copy Of Layout Approval (In Case Of Layout)
5 Copy Of Layout Approval (In Case Of Layout)
6 Copy Of Layout Approval (In Case Of Layout)
7 Copy Of Layout Approval (In Case Of Layout)
8 Copy Of Layout Approval (In Case Of Layout)
9 Copy Of Layout Approval (In Case Of Layout)
10 Copy Of Layout Approval (In Case Of Layout)
11 Copy Of Layout Approval (In Case Of Layout)
12 Copy Of Layout Approval (In Case Of Layout)
13 Copy Of Layout Approval (In Case Of Layout)
14 Copy Of Layout Approval (In Case Of Layout)
15 Copy Of Layout Approval (In Case Of Layout)
16 Copy Of Layout Approval (In Case Of Layout)
17 Copy Of Layout Approval (In Case Of Layout)
18 Copy Of Layout Approval (In Case Of Layout)
19 Copy Of Layout Approval (In Case Of Layout)
20 Copy Of Layout Approval (In Case Of Layout)
1 Building Plan Approval (IOD)
1 Commencement Certificates / NA Order For Plotted Development
2 Commencement Certificates / NA Order For Plotted Development
3 Commencement Certificates / NA Order For Plotted Development
4 Commencement Certificates / NA Order For Plotted Development
5 Commencement Certificates / NA Order For Plotted Development
1 Declaration About Commencement Certificate
1 Declaration In FORM B
1 Certificates Of Architect (Form 1)(Mandatory For Only Ongoing Project)
2 Certificates Of Architect (Form 1)(Mandatory For Only Ongoing Project)
3 Certificates Of Architect (Form 1)(Mandatory For Only Ongoing Project)
4 Certificates Of Architect (Form 1)(Mandatory For Only Ongoing Project)
5 Certificates Of Architect (Form 1)(Mandatory For Only Ongoing Project)
6 Certificates Of Architect (Form 1)(Mandatory For Only Ongoing Project)
7 Certificates Of Architect (Form 1)(Mandatory For Only Ongoing Project)
8 Certificates Of Architect (Form 1)(Mandatory For Only Ongoing Project)
9 Certificates Of Architect (Form 1)(Mandatory For Only Ongoing Project)
10 Certificates Of Architect (Form 1)(Mandatory For Only Ongoing Project)
11 Certificates Of Architect (Form 1)(Mandatory For Only Ongoing Project)
12 Certificates Of Architect (Form 1)(Mandatory For Only Ongoing Project)
13 Certificates Of Architect (Form 1)(Mandatory For Only Ongoing Project)
1 Certificates Of Engineer (Form 2)(Mandatory For Only Ongoing Project)
2 Certificates Of Engineer (Form 2)(Mandatory For Only Ongoing Project)
3 Certificates Of Engineer (Form 2)(Mandatory For Only Ongoing Project)
4 Certificates Of Engineer (Form 2)(Mandatory For Only Ongoing Project)
5 Certificates Of Engineer (Form 2)(Mandatory For Only Ongoing Project)
6 Certificates Of Engineer (Form 2)(Mandatory For Only Ongoing Project)
7 Certificates Of Engineer (Form 2)(Mandatory For Only Ongoing Project)
8 Certificates Of Engineer (Form 2)(Mandatory For Only Ongoing Project)
9 Certificates Of Engineer (Form 2)(Mandatory For Only Ongoing Project)
10 Certificates Of Engineer (Form 2)(Mandatory For Only Ongoing Project)
11 Certificates Of Engineer (Form 2)(Mandatory For Only Ongoing Project)
1 Form 2A
2 Form 2A
3 Form 2A
4 Form 2A
5 Form 2A
6 Form 2A
1 Engineers Certificate On Quality Assurance (Form 2A FY 2020-21)
1 Disclosure Of Sold/ Booked Inventory
2 Disclosure Of Sold/ Booked Inventory
3 Disclosure Of Sold/ Booked Inventory
4 Disclosure Of Sold/ Booked Inventory
5 Disclosure Of Sold/ Booked Inventory
6 Disclosure Of Sold/ Booked Inventory
7 Disclosure Of Sold/ Booked Inventory
8 Disclosure Of Sold/ Booked Inventory
1 Annual Audit Report Of Statutory CA (Form 5) (FY 2018-19)
1 Annual Audit Report Of Statutory CA (Form 5) (FY 2019-20)
1 Annual Audit Report Of Statutory CA (Form 5) (FY 2020-21)
1 Annual Audit Report Of Statutory CA (Form 5) (FY 2021-22)
1 Annual Audit Report Of Statutory CA (Form 5) (FY 2022-23)
1 Proforma Of Allotment Letter
2 Proforma Of Allotment Letter
1 Other – Finance
2 Other – Finance
Bank

Bank & Cost Disclosure

Declared project cost and the designated escrow account on file.

Project Account Bank Dcb Bank Ltd
IFSC DCBL0000313
Country/City