Squareyards Logo
Blogs
Sell or Rent Property
Login
Rera Banner
residential Ready to Move Source: rera.mh

Gera Adara RERA Details - P52100000889, Pune

View the RERA registration, promoter, approval, building, inventory, document and construction-progress disclosures for Gera Adara under registration P52100000889 in Pune, Maharashtra. Data is sourced from rera.mh.

RERA

RERA Snapshot

The most important statutory project disclosures, generated dynamically from available RERA fields.

  • RERA Number P52100000889
  • Project Name Geras Adara
  • Project Type Residential / Group Housing
  • Project Status Ready to Move
  • State Maharashtra
  • District Pune
  • Taluka Mulshi
  • Village Man
  • Original Completion 30 October 2023
  • Revised Completion 30 October 2023
  • Project Area (in Sq.mt.) 12,140.0
  • Total Buildings/Towers 1
  • Documents 2 Verified
Timeline

Project Timeline & Completion Details

Key statutory dates from registration through proposed completion and permit validity.

Proposed Start 23 July 2017 Expected commencement of civil works and foundation on site.
Original Completion 30 October 2023 Mandated date for project handover to the allottees and final compliance filing.
Revised Completion 30 October 2023 No revision filed against the original committed handover date.
Promoter

Promoter, Organisation & Member Details

Declared promoter entity, address and corporate identifiers on file with the authority.

Organisation Type Others
Individule Name Gera Realty Estates
Experience Details
Project NameAddressLand AreaProject StatusType of ProjectBuild Plot CountApartment countProposed Completion DateProject End DateLitigation PresentLitigation Details
Geras Park View ISurvey No 73 Hissa no 1 Kharadi7097CompletedIndustrial22272014-04-032015-03-17NoNA

Understand this Project's RERA details

Get clear answers and additional support from our RERA experts.

RERA Banner
Buildings

Buildings, Towers & Building-Level Details

Statutory building-level disclosures including tower height, sanctioned floors, structural counts and parking areas.

Building Detail
Project Name Name No. of Open Parking No. of Closed Parking No. of Floors No. of Habitable Floor No. of Sanctioned Apartment Wing Name
Geras Adara Geras Adara 214 55 25 0 0 NA

Scroll horizontally to view all building-level fields. Values marked "-" were not disclosed in the source RERA record.

Inventory

Unit Inventory & Configuration Details

Configuration mix and floor-level disclosures with both grouped and raw RERA views.

Total Units 266
Configurations 17
Inventory Type RESIDENTIAL
Configuration Distribution
AE 8 units · avg area 43.00 Sq.mt.
AF 2 units · avg area 43.25 Sq.mt.
AB 31 units · avg area 43.40 Sq.mt.
AA 24 units · avg area 46.00 Sq.mt.
AD 29 units · avg area 43.40 Sq.mt.
AC 8 units · avg area 50.40 Sq.mt.
D 3 units · avg area 31.10 Sq.mt.
AI 1 unit · avg area 54.40 Sq.mt.
C 4 units · avg area 30.40 Sq.mt.
AG 24 units · avg area 43.25 Sq.mt.
A 79 units · avg area 28.50 Sq.mt.
G 4 units · avg area 33.60 Sq.mt.
E 21 units · avg area 28.50 Sq.mt.
AK 1 unit · avg area 51.30 Sq.mt.
AJ 1 unit · avg area 51.60 Sq.mt.
B 18 units · avg area 28.30 Sq.mt.
AH 8 units · avg area 46.00 Sq.mt.
  • Geras Adara
Floor-Wise Inventory Explorer
Apartment Type Carpet Area No. of Apartment No. of Booked Apartment
AE 43.0 8 8
AF 43.25 2 2
AB 43.4 31 30
AA 46.0 24 23
AD 43.4 29 28
AC 50.4 8 8
D 31.1 3 3
AI 54.4 1 1
C 30.4 4 4
AG 43.25 24 23
A 28.5 79 79
G 33.6 4 4
E 28.5 21 21
AK 51.3 1 1
AJ 51.6 1 1
B 28.3 18 18
AH 46.0 8 8
Development

Development Works & Common Area Disclosures

Project-level common infrastructure disclosures as reported by the developer to the RERA authority.

Internal Roads & Footpaths 100.0% Internal Roads & Footpaths 100.0% Internal Roads & Footpaths 100.0%
Internal Roads & Footpaths % not reported Water Supply % not reported Water Supply 100.0%
Water Supply 100.0% Sewerage (Chamber, Lines, Septic Tank , Stp) % not reported Sewerage (Chamber, Lines, Septic Tank , Stp) 100.0%
Sewerage (Chamber, Lines, Septic Tank , Stp) 100.0% Storm Water Drains 100.0% Storm Water Drains % not reported
Storm Water Drains 100.0% Landscaping & Tree Planting % not reported Landscaping & Tree Planting 100.0%
Landscaping & Tree Planting 100.0% Street Lighting % not reported Street Lighting 100.0%
Street Lighting 100.0% Community Buildings % not reported Community Buildings 100.0%
Community Buildings 100.0% Treatment And Disposal Of Sewage And Sullage Water 100.0% Treatment And Disposal Of Sewage And Sullage Water 100.0%
Treatment And Disposal Of Sewage And Sullage Water % not reported Solid Waste Management And Disposal 100.0% Solid Waste Management And Disposal 100.0%
Solid Waste Management And Disposal % not reported Water Conservation /Rain Water Harvesting 100.0% Water Conservation /Rain Water Harvesting 100.0%
Water Conservation /Rain Water Harvesting % not reported Energy Managemcnt % not reported Energy Managemcnt % not reported
Fire Protection And Fire Safety Requirements 100.0% Fire Protection And Fire Safety Requirements 100.0% Fire Protection And Fire Safety Requirements % not reported
Electrical Meter Room, Sub-station, Receiving Station % not reported Electrical Meter Room, Sub-station, Receiving Station 100.0% Electrical Meter Room, Sub-station, Receiving Station 100.0%
Aggregate Area Of Recreational Open Space % not reported Aggregate Area Of Recreational Open Space 100.0% Aggregate Area Of Recreational Open Space 100.0%
Open Parking 100.0% Open Parking 100.0% Open Parking % not reported
Activity

Building Activity Progress

Statutory activity-wise construction progress as declared by the developer, per building/tower.

  • Geras Adara
Geras Adara · Overall Progress 91%
Excavation
Complete
% Work100%
Basement (if any)
Complete
% Work100%
Podiums (if any)
Not Started
% Work0%
Plinth
Complete
% Work100%
Stilt Floor
Complete
% Work100%
Slabs of Super Structure
Complete
% Work100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Complete
% Work100%
Sanitary Fittings within the flats / premises
Complete
% Work100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Complete
% Work100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Complete
% Work100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Complete
% Work100%
Documents

RERA Documents & Filings

All statutory documents uploaded by the promoter to the authority portal.

Mh Certificate Pdf
Mh Details Html
Bank

Bank & Cost Disclosure

Declared project cost and the designated escrow account on file.

Project Account Bank HDFC BANK
IFSC HDFC0000039
Branch Address A-WING SHANGRILA GARDENS BUND GARDEN ROAD PUNE 411001
Country/City