RERA Snapshot
The most important statutory project disclosures, generated dynamically from available RERA fields.
- RERA Number P52100079576
- Project Name T4A named Celina of Raheja Galaxy in RV Premiere
- Project Type Residential / Group Housing
- State Maharashtra
- District Pune
- Taluka Haveli
- Village MOHAMMADWADI
- Original Completion 31 March 2030
- Revised Completion 31 March 2030
- Project Area (in Sq.mt.) 1,30,877.97
- Total Buildings/Towers 1
- Documents 4 Verified
Project Timeline & Completion Details
Key statutory dates from registration through proposed completion and permit validity.
Promoter, Organisation & Member Details
Declared promoter entity, address and corporate identifiers on file with the authority.
Promoters, Co-promoters & Members
Land, Address & Location Details
Land parcel, zoning and geo-coordinates as recorded in the project filing.
| Survey Number S. No. 37, H. No. 3+4 (Plot B), S. No. 27, H. No. 1B+2+3 (Plot A) and H. No. 4+5, S. No. 25 H. No. 4 (pt), S. No. 26, H. No. (1+9A)+(2A+2B) | |
Boundary Details |
|
| Boundaries East 24 mtr wide Road | Boundaries West Amenity Space |
| Boundaries South Adjacent S No 27 Hissa No 5 part | Boundaries North 30 mtr wide DP Road |
RERA Coordinates |
|
| Latitude, Longitude 18.4674223, 73.9012309 | |
Buildings, Towers & Building-Level Details
Statutory building-level disclosures including tower height, sanctioned floors, structural counts and parking areas.
Scroll horizontally to view all building-level fields. Values marked "-" were not disclosed in the source RERA record.
Unit Inventory & Configuration Details
Configuration mix and floor-level disclosures with both grouped and raw RERA views.
Development Works & Common Area Disclosures
Project-level common infrastructure disclosures as reported by the developer to the RERA authority.
| Internal Roads & Footpaths % not reported | Water Supply % not reported | Sewerage (Chamber, Lines, Septic Tank , Stp) % not reported |
| Storm Water Drains % not reported | Landscaping & Tree Planting % not reported | Street Lighting % not reported |
| Community Buildings 100.0% | Treatment And Disposal Of Sewage And Sullage Water % not reported | Solid Waste Management And Disposal % not reported |
| Water Conservation /Rain Water Harvesting % not reported | Energy Managemcnt % not reported | Fire Protection And Fire Safety Requirements % not reported |
| Electrical Meter Room, Sub-station, Receiving Station % not reported | Aggregate Area Of Recreational Open Space % not reported | Open Parking % not reported |
Building Activity Progress
Statutory activity-wise construction progress as declared by the developer, per building/tower.
RERA Documents & Filings
All statutory documents uploaded by the promoter to the authority portal.
Bank & Cost Disclosure
Declared project cost and the designated escrow account on file.
| Project Account Bank | RBL Bank Limited |
|---|---|
| IFSC | RATN0000070 |
| Branch Address | RBL BANK LTD,DHANNUR HOUSE,15,SIR P M ROAD, FORT,MUMBAI-400001 |