residential Ready to Move Source: rera.mh

Sumeru Vyomkesh RERA Details - P52100013422, Pune

View the RERA registration, promoter, approval, building, inventory, document and construction-progress disclosures for Sumeru Vyomkesh under registration P52100013422 in Pune, MAHARASHTRA. Data is sourced from rera.mh.

RERA

RERA Snapshot

The most important statutory project disclosures, generated dynamically from available RERA fields.

  • RERA Number P52100013422
  • Project Name VYOMKESH
  • Project Type Residential
  • Project Status Ready to Move
  • State MAHARASHTRA
  • District Pune
  • Taluka Haveli
  • Village Wadgaon Bk
  • Original Completion 30 June 2022
  • Revised Completion 30 June 2022
  • Project Area (in Sq.mt.) 4,400
  • Total Buildings/Towers 1
  • Documents 91 Verified
Timeline

Project Timeline & Completion Details

Key statutory dates from registration through proposed completion and permit validity.

Proposed Start 05 October 2017 Expected commencement of civil works and foundation on site.
Original Completion 30 June 2022 Mandated date for project handover to the allottees and final compliance filing.
Revised Completion 30 June 2022 No revision filed against the original committed handover date.
Promoter

Promoter, Organisation & Member Details

Declared promoter entity, address and corporate identifiers on file with the authority.

Experience Details
Project NameAddressLand AreaType of ProjectBuild Plot CountApartment countProject End Date
SUSHRUT RESIDENCYSURVEY NO 41 HISSA NO 1 NARHE PUNE 4110413800Residential41502014-10-10
GOURANG RESIDENCYNARHE PUNE2000Residential3722009-07-30

Understand this Project's RERA details

Get clear answers and additional support from our RERA experts.

RERA Banner
Buildings

Buildings, Towers & Building-Level Details

Statutory building-level disclosures including tower height, sanctioned floors, structural counts and parking areas.

Building Detail
Project Name Name Date of Completion No. of Basements No. of Plinth No. of Podium No. of Slab No. of Slits No. of Open Parking No. of Closed Parking
VYOMKESH Vyomkesh 2021-12-31 2 1 0 14 1 23 37

Scroll horizontally to view all building-level fields. Values marked "-" were not disclosed in the source RERA record.

Inventory

Unit Inventory & Configuration Details

Configuration mix and floor-level disclosures with both grouped and raw RERA views.

Total Units 88
Configurations 16
Inventory Type RESIDENTIAL
Configuration Distribution
1 BHK 25 units · avg area 51.45 Sq.mt.
SHOP NO 1 1 unit · avg area 41.33 Sq.mt.
2 BHK 47 units · avg area 74.16 Sq.mt.
SHOP NO 2 1 unit · avg area 51.92 Sq.mt.
3 BHK 3 units · avg area 104.26 Sq.mt.
SHOP NO 3 1 unit · avg area 38.17 Sq.mt.
SHOP NO 4 1 unit · avg area 33.34 Sq.mt.
SHOP NO 5 1 unit · avg area 39.94 Sq.mt.
SHOP NO 6 1 unit · avg area 25.72 Sq.mt.
SHOP NO 7 1 unit · avg area 34.36 Sq.mt.
SHOP NO 8 1 unit · avg area 35.11 Sq.mt.
SHOP NO 9 1 unit · avg area 34.18 Sq.mt.
SHOP NO 10 1 unit · avg area 20.99 Sq.mt.
SHOP NO 11 1 unit · avg area 68.27 Sq.mt.
SHOP NO 12 1 unit · avg area 55.45 Sq.mt.
SHOP NO 13 1 unit · avg area 38.17 Sq.mt.
  • Vyomkesh
Floor-Wise Inventory Explorer
Apartment Type Carpet Area No. of Apartment No. of Booked Apartment
SHOP NO 5 39.94 1 1
SHOP NO 6 25.72 1 1
3BHK 207 106.07 1 1
2BHK 1206 71.81 1 1
SHOP NO 11 68.27 1 1
3BHK 107 106.76 1 1
2BHK 201 69.9 1 0
1BHK 202 50.2 1 0
2BHK 203 69.67 1 1
2BHK 204 71.98 1 1
1BHK 205 49.89 1 1
2BHK 406 71.81 1 0
SHOP NO 7 34.36 1 1
2BHK 603 69.68 1 1
2BHK 604 71.07 1 1
1BHK 605 49.61 1 1
2BHK 606 71.81 1 1
1BHK 701 44.52 1 1
1BHK 702 50.26 1 1
1BHK 1205 49.61 1 1
1BHK 305 49.98 1 1
2BHK 306 73.49 1 0
3 BHK 307 99.96 1 1
SHOP NO 10 20.99 1 1
2BHK 703 71.54 1 1
2BHK 704 73.21 1 1
1 BHK 705 52.79 1 1
2BHK 706 73.49 1 1
2BHK 504 74.01 1 1
SHOP NO 1 41.33 1 1
SHOP NO 2 51.92 1 1
SHOP NO 3 38.17 1 1
SHOP NO 4 33.34 1 1
SHOP NO 9 34.18 1 1
SHOP NO 12 55.45 1 1
SHOP NO 13 38.17 1 1
1BHK 1005 49.61 1 1
2BHK 1006 71.81 1 1
2BHK 1101 73.04 1 1
1BHK 1102 50.99 1 1
2BHK 1103 72.3 1 1
2BHK 206 72.41 1 1
1BHK 505 50.77 1 1
2BHK 506 74.29 1 0
2BHK 601 69.03 1 1
1BHK 602 49.42 1 0
2BHK 401 69.03 1 0
1BHK 402 49.42 1 1
2BHK 403 69.68 1 1
2BHK 404 71.07 1 1
1BHK 405 49.61 1 1
2BHK 101 73.04 1 1
1BHK 102 50.99 1 1
2BHK 103 72.32 1 1
2BHK 104 76.63 1 1
1BHK 105 86.97 1 1
2BHK 106 182.11 1 1
1BHK 1202 49.42 1 1
2BHK 1203 69.68 1 1
2BHK 1204 71.07 1 1
2BHK 801 69.03 1 1
1BHK 802 49.42 1 0
2BHK 803 69.68 1 1
2BHK 804 71.07 1 1
1BHK 805 49.61 1 1
2BHK 806 71.81 1 1
2BHK 901 73.04 1 1
1BHK 902 50.99 1 1
2BHK 903 72.3 1 1
2BHK 904 74.01 1 1
2BHK 1104 74.01 1 1
1BHK 1105 50.77 1 1
2BHK 1106 74.29 1 1
2BHK 1201 69.03 1 1
1BHK 905 50.77 1 0
2BHK 906 74.29 1 1
2BHK 1001 69.03 1 1
1BHK 1002 49.42 1 1
2BHK 1003 69.68 1 1
2BHK 1004 71.07 1 1
SHOP NO 8 35.11 1 1
2BHK 501 73.04 1 1
1BHK 502 50.99 1 1
2BHK 503 72.3 1 1
2BHK 301 72.28 1 0
1BHK 302 50.26 1 0
2BHK 303 71.54 1 1
2BHK 304 73.21 1 1
Parking

Parking, Garage & Area Details

Parking provision declared in the sanctioned plan.

Type Proposed Booked Work Done
Garage 0 0 0
Covered Parking 20 0 0
Development

Development Works & Common Area Disclosures

Project-level common infrastructure disclosures as reported by the developer to the RERA authority.

Internal Roads Footpaths % not reported Water Conservation Rainwater Harvesting % not reported Energy Management % not reported
Fire Protection And Fire Safety Requirements % not reported Electrical Meter Room Substation Receivingstation % not reported Aggregate Area Of Recreational Open Space % not reported
Open Parking % not reported Water Supply % not reported Sewerage % not reported
Storm Water Drains % not reported Landscaping Tree Planting % not reported Street Lighting % not reported
Community Buildings % not reported Treatment And Disposal Of Sewage Sullage Water % not reported Solid Waste Management Disposal % not reported
Activity

Building Activity Progress

Statutory activity-wise construction progress as declared by the developer, per building/tower.

  • Vyomkesh
Vyomkesh · Overall Progress 45%
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Not Started
% Work0%
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
Complete
% Work100%
Excavation
Complete
% Work100%
X number of Basement(s) and Plinth
Complete
% Work100%
X number of Podiums
Not Started
% Work0%
Stilt Floor
Not Started
% Work0%
X number of Slabs of Super Structure
Complete
% Work100%
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
In Progress
% Work50%
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Not Started
% Work0%
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Not Started
% Work0%
Documents

RERA Documents & Filings

All statutory documents uploaded by the promoter to the authority portal.

Mh Details Html
Mh Certificate Pdf
Mh Details Pdf
1 Copy Of The Legal Title Report
1 Details Of Encumbrances
2 Details Of Encumbrances
3 Details Of Encumbrances
4 Details Of Encumbrances
5 Details Of Encumbrances
6 Details Of Encumbrances
7 Details Of Encumbrances
8 Details Of Encumbrances
9 Details Of Encumbrances
10 Details Of Encumbrances
11 Details Of Encumbrances
12 Details Of Encumbrances
13 Details Of Encumbrances
14 Details Of Encumbrances
15 Details Of Encumbrances
16 Details Of Encumbrances
17 Details Of Encumbrances
18 Details Of Encumbrances
19 Details Of Encumbrances
20 Details Of Encumbrances
21 Details Of Encumbrances
22 Details Of Encumbrances
1 Copy Of Layout Approval (In Case Of Layout)
2 Copy Of Layout Approval (In Case Of Layout)
3 Copy Of Layout Approval (In Case Of Layout)
4 Copy Of Layout Approval (In Case Of Layout)
5 Copy Of Layout Approval (In Case Of Layout)
6 Copy Of Layout Approval (In Case Of Layout)
7 Copy Of Layout Approval (In Case Of Layout)
8 Copy Of Layout Approval (In Case Of Layout)
1 Building Plan Approval (IOD)
2 Building Plan Approval (IOD)
3 Building Plan Approval (IOD)
4 Building Plan Approval (IOD)
5 Building Plan Approval (IOD)
6 Building Plan Approval (IOD)
7 Building Plan Approval (IOD)
8 Building Plan Approval (IOD)
9 Building Plan Approval (IOD)
10 Building Plan Approval (IOD)
11 Building Plan Approval (IOD)
12 Building Plan Approval (IOD)
13 Building Plan Approval (IOD)
14 Building Plan Approval (IOD)
15 Building Plan Approval (IOD)
16 Building Plan Approval (IOD)
17 Building Plan Approval (IOD)
1 Commencement Certificates / NA Order For Plotted Development
2 Commencement Certificates / NA Order For Plotted Development
3 Commencement Certificates / NA Order For Plotted Development
1 Declaration About Commencement Certificate
1 Declaration In FORM B
1 Certificates Of Architect (Form 1)(Mandatory For Only Ongoing Project)
2 Certificates Of Architect (Form 1)(Mandatory For Only Ongoing Project)
3 Certificates Of Architect (Form 1)(Mandatory For Only Ongoing Project)
4 Certificates Of Architect (Form 1)(Mandatory For Only Ongoing Project)
5 Certificates Of Architect (Form 1)(Mandatory For Only Ongoing Project)
6 Certificates Of Architect (Form 1)(Mandatory For Only Ongoing Project)
1 Certificates Of Engineer (Form 2)(Mandatory For Only Ongoing Project)
2 Certificates Of Engineer (Form 2)(Mandatory For Only Ongoing Project)
3 Certificates Of Engineer (Form 2)(Mandatory For Only Ongoing Project)
4 Certificates Of Engineer (Form 2)(Mandatory For Only Ongoing Project)
5 Certificates Of Engineer (Form 2)(Mandatory For Only Ongoing Project)
6 Certificates Of Engineer (Form 2)(Mandatory For Only Ongoing Project)
7 Certificates Of Engineer (Form 2)(Mandatory For Only Ongoing Project)
8 Certificates Of Engineer (Form 2)(Mandatory For Only Ongoing Project)
9 Certificates Of Engineer (Form 2)(Mandatory For Only Ongoing Project)
10 Certificates Of Engineer (Form 2)(Mandatory For Only Ongoing Project)
11 Certificates Of Engineer (Form 2)(Mandatory For Only Ongoing Project)
12 Certificates Of Engineer (Form 2)(Mandatory For Only Ongoing Project)
1 Engineers Certificate On Quality Assurance (Form 2A FY 2020-21)
2 Engineers Certificate On Quality Assurance (Form 2A FY 2020-21)
3 Engineers Certificate On Quality Assurance (Form 2A FY 2020-21)
1 Disclosure Of Sold/ Booked Inventory
2 Disclosure Of Sold/ Booked Inventory
3 Disclosure Of Sold/ Booked Inventory
4 Disclosure Of Sold/ Booked Inventory
1 Certificates Of CA (Form 5)
2 Certificates Of CA (Form 5)
3 Certificates Of CA (Form 5)
1 Annual Audit Report Of Statutory CA (Form 5) (FY 2018-19)
1 Annual Audit Report Of Statutory CA (Form 5) (FY 2019-20)
1 Annual Audit Report Of Statutory CA (Form 5) (FY 2020-21)
1 Annual Audit Report Of Statutory CA (Form 5) (FY 2021-22)
1 Proforma Of Allotment Letter
2 Proforma Of Allotment Letter
1 Other
Bank

Bank & Cost Disclosure

Declared project cost and the designated escrow account on file.

Project Account Bank MAHARASHTRA GRAMIN BANK
IFSC MAHG0004618
Country/City