Squareyards Logo
Blogs
Sell or Rent Property
Login
Rera Banner
residential New Launch Source: rera.ka

5 Elements Urban Nest RERA Details - PRM/KA/RERA/1251/310/PR/060325/007555 Bangalore

View the RERA registration, promoter, approval, building, inventory, document and construction-progress disclosures for 5 Elements Urban Nest under registration PRM/KA/RERA/1251/310/PR/060325/007555 in Bangalore, Karnataka. Data is sourced from rera.ka.

RERA

RERA Snapshot

The most important statutory project disclosures, generated dynamically from available RERA fields.

  • RERA Number PRM/KA/RERA/1251/310/PR/060325/007555
  • Project Name Urban Nest By 5 Elements
  • Project Type Residential/Group Housing
  • Project Status New Launch
  • District Bengaluru Urban
  • Taluka Bengaluru South
  • Original Completion 31 December 2029
  • Documents 81 Verified
Timeline

Project Timeline & Completion Details

Key statutory dates from registration through proposed completion and permit validity.

Proposed Start 01 January 2025 Expected commencement of civil works and foundation on site.
Original Completion 31 December 2029 Mandated date for project handover to the allottees and final compliance filing.
Promoter

Promoter, Organisation & Member Details

Declared promoter entity, address and corporate identifiers on file with the authority.

Primary Promoter

5 Elements Homes
Registered Address 1st Floor, Unit No 101, No 73/1-1, Brigade Corner,S Kariyappa Road, Yediyur Circle, 7th Block Jayanagar ,Bengaluru South ,Bengaluru Urban-560082
Location

Land, Address & Location Details

Land parcel, zoning and geo-coordinates as recorded in the project filing.

Address Sy No 256,Kambipura Village , Kengeri Hobli , Bengaluru South , Bengaluru Urban, Karnataka - 560060

RERA Coordinates

Latitude, Longitude 12.88525, 77.455694
Plans

Plans & Approvals

Statutory approvals obtained or pending against the project site.

Plan Approval No. 16/2024-25
Authority BDA - Bangalore Development Authority
Approved Date 31 December 2024

Understand this Project's RERA details

Get clear answers and additional support from our RERA experts.

RERA Banner
Buildings

Buildings, Towers & Building-Level Details

Statutory building-level disclosures including tower height, sanctioned floors, structural counts and parking areas.

Building Detail
Name No. of Basements No. of Slab No. of Slits No. of Open Parking Building Type Height of Tower No. of Floors No. of Units
Phase 1 Tower 1 1 9 0 72 Residential 26.82 8 72
Tower Phase 1 Tower 2 1 9 0 72 Residential 26.82 8 72
Tower Tower Phase 2 Tower 3 2 9 0 72 Residential 26.82 8 72
Tower Tower Phase 2 Tower 4 2 9 0 72 Residential 26.82 8 72

Scroll horizontally to view all building-level fields. Values marked "-" were not disclosed in the source RERA record.

Inventory

Unit Inventory & Configuration Details

Configuration mix and floor-level disclosures with both grouped and raw RERA views.

Total Units -
Configurations 2
Inventory Type RESIDENTIAL
Configuration Distribution
2 BHK 0 units
3 BHK 0 units
  • Phase 1 Tower 1
  • Tower Phase 1 Tower 2
  • Tower Tower Phase 2 Tower 3
  • Tower Tower Phase 2 Tower 4
Floor-Wise Inventory Explorer
Floor Apartment Type Carpet Area No. of Unit
-1 3 BHK 98.01189149 001
-1 2 BHK 67.16833891 002
-1 3 BHK 83.61204013 003
-1 3 BHK 97.73318469 004
-1 2 BHK 71.25603865 005
-1 3 BHK 91.60163508 006
-1 3 BHK 90.85841695 007
-1 3 BHK 83.61204013 008
GF 3 BHK 98.01189149 101
GF 2 BHK 67.16833891 102
GF 3 BHK 83.61204013 103
GF 3 BHK 97.73318469 104
GF 2 BHK 71.25603865 105
GF 3 BHK 91.60163508 106
GF 3 BHK 90.85841695 107
GF 3 BHK 83.61204013 108
1 3 BHK 98.01189149 201
1 2 BHK 67.16833891 202
1 3 BHK 83.61204013 203
1 3 BHK 97.73318469 204
1 2 BHK 71.25603865 205
1 3 BHK 91.60163508 206
1 3 BHK 90.85841695 207
1 3 BHK 83.61204013 208
2 3 BHK 98.01189149 301
2 2 BHK 67.16833891 302
2 3 BHK 83.61204013 303
2 3 BHK 97.73318469 304
2 2 BHK 71.25603865 305
2 3 BHK 91.60163508 306
2 3 BHK 90.85841695 307
2 3 BHK 83.61204013 308
3 3 BHK 98.01189149 401
3 2 BHK 67.16833891 402
3 3 BHK 83.61204013 403
3 3 BHK 97.73318469 404
3 2 BHK 71.25603865 405
3 3 BHK 91.60163508 406
3 3 BHK 90.85841695 407
3 3 BHK 83.61204013 408
4 3 BHK 98.01189149 501
4 2 BHK 67.16833891 502
4 3 BHK 83.61204013 503
4 3 BHK 97.73318469 504
4 2 BHK 71.25603865 505
4 3 BHK 91.60163508 506
4 3 BHK 90.85841695 507
4 3 BHK 83.61204013 508
5 3 BHK 98.01189149 601
5 2 BHK 67.16833891 602
5 3 BHK 83.61204013 603
5 3 BHK 97.73318469 604
5 2 BHK 71.25603865 605
5 3 BHK 91.60163508 606
5 3 BHK 90.85841695 607
5 3 BHK 83.61204013 608
6 3 BHK 98.01189149 701
6 2 BHK 67.16833891 702
6 3 BHK 83.61204013 703
6 3 BHK 97.73318469 704
6 2 BHK 71.25603865 705
6 3 BHK 91.60163508 706
6 3 BHK 90.85841695 707
6 3 BHK 83.61204013 708
7 3 BHK 98.01189149 801
7 2 BHK 67.16833891 802
7 3 BHK 83.61204013 803
7 3 BHK 97.73318469 804
7 2 BHK 71.25603865 805
7 3 BHK 91.60163508 806
7 3 BHK 90.85841695 807
7 3 BHK 83.61204013 808
Parking

Parking, Garage & Area Details

Parking provision declared in the sanctioned plan.

Type Proposed Booked Work Done
Garage - - -
Covered Parking - - -
Open Parking - - -
Development

Development Works & Common Area Disclosures

Project-level common infrastructure disclosures as reported by the developer to the RERA authority.

Sub Structure Earth Work And Other Leveling Preparation Work % not reported Sub Structure Foundation Footing Work % not reported Sub Structure Upto Plinth Level % not reported
Sub Structure Sub-structure Flooring (Parking Floor, More Than One Floor Below General Ground Level) % not reported Sub Structure Retaining Wall (All Types) % not reported Sup Structure Rcc Or Ms Framed Structure % not reported
Sup Structure Masonry Construction % not reported Sup Structure Plastering Inside , Outside & Ceiling % not reported Sup Structure Joinery: Doors, Windows, Ventilators Etc % not reported
Sup Structure Basic Work Of Water Supply, Sanitary And Electrification % not reported Sup Structure Dadoing, Skirting, Flooring, Tiles Work (All Types) % not reported Sup Structure Railing And Grill Fixing % not reported
Finishing Works Electrification, Water Supply And Sanitary Finishing % not reported Finishing Works Painting % not reported Finishing Works Fire Prevention And Fire Fighting Fitting And Fixture With Network % not reported
Finishing Works Weather Proof Work(tile,concrete) % not reported Finishing Works Wardrobe, Showcase, Kitchen Cabinet, Puja Work % not reported Finishing Works Elevation Work % not reported
Finishing Works Internal And External Work Including Landscapes As Per Sanctioned Drawings % not reported Internal Infrastructure Water Supply % not reported Internal Infrastructure Sewage And Drainage System % not reported
Internal Infrastructure Water Conservation/rain Water Harvesting/recharge Of Ground Water % not reported Internal Infrastructure Energy Management % not reported Internal Infrastructure Fire Protection And Fire Safety Requirements % not reported
Internal Infrastructure Solid Waste Management And Disposal % not reported Internal Infrastructure Emergency Evacuation Services % not reported External Infrastructure Water Supply % not reported
External Infrastructure Internal Roads & Footpaths % not reported External Infrastructure Sewage And Drainage System % not reported External Infrastructure Electricity Supply Transformer And Substation % not reported
External Infrastructure Solid Waste Management And Disposal % not reported External Infrastructure Emergency Evacuation Services % not reported External Infrastructure Storm Water Drains % not reported
External Infrastructure Use Of Renewable Energy % not reported External Infrastructure Water Conservation/rain Water Harvesting/recharge Of Ground Water % not reported External Infrastructure Fire Protection And Fire Safety Requirements % not reported
External Infrastructure Sewage Treatment Plant (Stp) % not reported External Infrastructure Parks & Tree Planting % not reported External Infrastructure Street Lighting % not reported
Amenities Electricity % not reported Amenities Smart Home Automation % not reported Amenities Cctv Surveillance % not reported
Amenities Club House % not reported Amenities Community Hall % not reported Amenities Outdoor Sports Facility % not reported
Amenities Indoor Sports Facility % not reported Amenities Swimming Pool % not reported Amenities Gym % not reported
Amenities Parks % not reported Amenities Power Backup % not reported Amenities Piped Gas % not reported
Amenities Water And Sanitation % not reported Amenities Air Conditioning % not reported Common Areas Staircases % not reported
Common Areas Lifts % not reported Common Areas Corridor/lobbies % not reported Common Areas Fire Escapes % not reported
Common Areas Common Entrance And Exit For The Building/common Portico/foyer/verandah % not reported Common Areas Basement % not reported Common Areas Terrace % not reported
Common Areas Outer Wall % not reported Common Areas Open Parking Areas % not reported Common Areas Provision For Lodging Of Management Staff And Security Staff % not reported
Common Areas Water Conservation And Renewable Energy % not reported Common Areas Common Storage Spaces % not reported
Documents

RERA Documents & Filings

All statutory documents uploaded by the promoter to the authority portal.

Promoter Registration Certificate
Promoter Pan Card
Promoter Address Proof
Affidavit
Fd 1 Balance Sheet 2023 24.Pdf
Fd 2 Balance Sheet 2022 23.Pdf
Fd 3 Balance Sheet 2021 22.Pdf
Fd 4 Profit & Loss 2023 24.Pdf
Fd 5 Profit & Loss 2022 23.Pdf
Fd 6 Profit & Loss 2021 22.Pdf
Fd 7 ITR AY 2024-25.Pdf
Fd 8 ITR AY 2023-24.Pdf
Fd 9 ITR AY 2022-23.Pdf
Pd 1 Commencement Certificate( Annexure - 80 )
Pd 2 Approved Building Plan( Annexure - 81 )
Pd 3 Sectional Drawing Of The Apartments( Annexure - 82 )
Pd 4 Certificate From Registered Engineer Indicating The Structural Safety Of The Building( Annexure - 83 )
Pd 5 Project Specifications( Annexure - 84 )
Pd 6 Brochure( Annexure - 85 )
Pd 7 Relinquishment Deed( Annexure - 86 )
Pd 8 Proforma Of Agreement For Sale( Annexure - 87 )
Pd 9 Proforma Of Allotment Letter( Annexure - 88 )
Dc 1 Declaration (Form B)( Annexure - 89 )
Dc 2 Section 3(1) Notarized Affidavit( Annexure - 90 )
Dc 3 JD AFFIDAVIT CUM DECLARATION( Annexure - 91 )
Dc 4 Advocate Search Report( Annexure - 92 )
Noc 1 ESCOM Electricity( Annexure - 95 )
Noc 2 KWSSB Water( Annexure - 96 )
Noc 3 KSPCB( Annexure - 97 )
Noc 4 SEIAA( Annexure - 98 )
Noc 5 Fire Force Department( Annexure - 99 )
Noc 6 Airport Authority Of India( Annexure - 100 )
Photo 1 Project Photo
Photo 2 Project Photo
Photo 3 Project Photo
Photo 4 Project Photo
Od 1 LICENCE Issued By BDA.Pdf
Od 2 Kambipura BDA NOC.Pdf
Od 3 1st Floor Plan.PDF
Od 4 2nd To 8th Floor Plan.PDF
Od 5 Ground Floor Plan.PDF
Od 6 Lower Basement Plan.PDF
Od 7 Upper Basement Plan.PDF
Od 8 Terrace And Elevation Plan.PDF
Od 9 GPA.Pdf
Od 10 Akarband.Pdf
Od 11 MR - T15-2015-16.Pdf
Od 12 MR T6.Pdf
Od 13 MR 21.Jpeg
Od 14 Phodi Sketch.Jpg
Od 15 ADLR Sketch.Jpg
Od 16 Tilte Deed - Will To Landowner From Her Father.Pdf
Od 17 N Chinappa Family Tree & Death Certificate.Pdf
Od 18 Family Tree Of SOWBHAGYA.Pdf
Od 19 Confirmation Deed 5373-2022-23.Pdf
Od 20 ESTIMATE.Pdf
Od 21 STP DRAWING - URBAN NEST.Pdf
Od 22 Area Statments UDS.Pdf
Od 23 Common Area Details.Pdf
Od 24 External Internal INFRASTRUCTURE.Pdf
Od 25 Development Details.Pdf
Od 26 Land Cost Calculation.Pdf
Od 27 CDP Urban Nest .Png
Od 28 CDP Plan.Pdf
Od 29 Bifurcation Of Area Details (2).Pdf
Od 30 KSPCB NOC Application ACK.Pdf
Od 31 Amenities Details.Pdf
Od 32 No-Mortgage.Pdf
Od 33 D P Plan Kambipura Marked.Pdf
Ed 1 21-02-2025
Ed 2 21-02-2025
Ed 3 21-02-2025
Ed 4 21-02-2025
Ed 5 21-02-2025
Ed 6 21-02-2025
Ed 7 21-02-2025
Ld Rtc
Ld Mutation
Ld Encumbrance Certificate
Ld Conversion Order
Ld Khatha
Bank

Bank & Cost Disclosure

Declared project cost and the designated escrow account on file.

Project Account Bank STATE BANK OF INDIA
Account Number (RERA) 43748139422
IFSC SBIN0006959
Branch Address SME Jayanagar
Country/City