Squareyards Logo
Blogs
Sell or Rent Property
Login
Rera Banner
residential Under Construction Source: rera.ka

ARS Zurich RERA Details - PRM/KA/RERA/1251/308/PR/230125/007431 Bangalore

View the RERA registration, promoter, approval, building, inventory, document and construction-progress disclosures for ARS Zurich under registration PRM/KA/RERA/1251/308/PR/230125/007431 in Bangalore, Karnataka. Data is sourced from rera.ka.

RERA

RERA Snapshot

The most important statutory project disclosures, generated dynamically from available RERA fields.

  • RERA Number PRM/KA/RERA/1251/308/PR/230125/007431
  • Project Name ARS ZURICH PHASE-1
  • Project Type Residential/Group Housing
  • Project Status Under Construction
  • District Bengaluru Urban
  • Taluka Anekal
  • Original Completion 30 April 2027
  • Documents 54 Verified
Timeline

Project Timeline & Completion Details

Key statutory dates from registration through proposed completion and permit validity.

Proposed Start 17 December 2024 Expected commencement of civil works and foundation on site.
Original Completion 30 April 2027 Mandated date for project handover to the allottees and final compliance filing.
Promoter

Promoter, Organisation & Member Details

Declared promoter entity, address and corporate identifiers on file with the authority.

Primary Promoter

ARS INFRAA
Registered Address NO 1668/A 3RD FLOOR 14TH MAIN ROAD,7TH SECTOR HSR LAYOUT ,Bengaluru East ,Bengaluru Urban-560102,NO 1668/A 3RD FLOOR 14TH MAIN ROAD,7TH SECTOR HSR LAYOUT ,Bengaluru East ,Bengaluru Urban-560102 ,Bengaluru East ,Bengaluru Urban-560102
Location

Land, Address & Location Details

Land parcel, zoning and geo-coordinates as recorded in the project filing.

Address SY NO 105 SOMPURA VILLAGE SARJAPUR HOBLI ANEKAL TALUK BENGALURU , SY NO 105 SOMPURA VILLAGE SARJAPUR HOBLI ANEKAL TALUK BENGALURU , Anekal , Bengaluru Urban, Karnataka - 562125

RERA Coordinates

Latitude, Longitude 12.87135601424262, 77.77209637300533
Plans

Plans & Approvals

Statutory approvals obtained or pending against the project site.

Plan Approval No. APA/CC/552/2024-25
Authority Local Planing Authority
Approved Date 12 December 2024

Understand this Project's RERA details

Get clear answers and additional support from our RERA experts.

RERA Banner
Buildings

Buildings, Towers & Building-Level Details

Statutory building-level disclosures including tower height, sanctioned floors, structural counts and parking areas.

Building Detail
Name No. of Basements No. of Slab No. of Slits No. of Open Parking Building Type Height of Tower No. of Floors No. of Units
ARS SWASA 1 28 1 104 Residential 81.2 26 104

Scroll horizontally to view all building-level fields. Values marked "-" were not disclosed in the source RERA record.

Inventory

Unit Inventory & Configuration Details

Configuration mix and floor-level disclosures with both grouped and raw RERA views.

Total Units -
Configurations 1
Inventory Type RESIDENTIAL
Configuration Distribution
3 BHK 0 units
  • ARS SWASA
Floor-Wise Inventory Explorer
Floor Apartment Type Carpet Area No. of Unit
GF 3 BHK 142.65 101
GF 3 BHK 124.78 102
GF 3 BHK 124.78 103
GF 3 BHK 124.78 104
1 3 BHK 142.65 201
1 3 BHK 124.78 202
1 3 BHK 124.78 203
1 3 BHK 124.78 204
2 3 BHK 142.65 301
2 3 BHK 124.78 302
2 3 BHK 124.78 303
2 3 BHK 124.78 304
3 3 BHK 142.65 401
3 3 BHK 124.78 402
3 3 BHK 124.78 403
3 3 BHK 124.78 404
4 3 BHK 142.65 501
4 3 BHK 124.78 502
4 3 BHK 124.78 503
4 3 BHK 124.78 504
5 3 BHK 142.65 601
5 3 BHK 124.78 602
5 3 BHK 124.78 603
5 3 BHK 124.78 604
6 3 BHK 142.65 701
6 3 BHK 124.78 702
6 3 BHK 124.78 703
6 3 BHK 124.78 704
7 3 BHK 142.65 801
7 3 BHK 124.78 802
7 3 BHK 124.78 803
7 3 BHK 124.78 804
8 3 BHK 142.65 901
8 3 BHK 124.78 902
8 3 BHK 124.78 903
8 3 BHK 124.78 904
9 3 BHK 142.65 1001
9 3 BHK 124.78 1002
9 3 BHK 124.78 1003
9 3 BHK 124.78 1004
10 3 BHK 142.65 1101
10 3 BHK 124.78 1102
10 3 BHK 124.78 1103
10 3 BHK 124.78 1104
11 3 BHK 142.65 1201
11 3 BHK 124.78 1202
11 3 BHK 124.78 1203
11 3 BHK 124.78 1204
12 3 BHK 142.65 1301
12 3 BHK 124.78 1302
12 3 BHK 124.78 1303
12 3 BHK 124.78 1304
13 3 BHK 142.65 1401
13 3 BHK 124.78 1402
13 3 BHK 124.78 1403
13 3 BHK 124.78 1404
14 3 BHK 142.65 1501
14 3 BHK 124.78 1502
14 3 BHK 124.78 1503
14 3 BHK 124.78 1504
15 3 BHK 142.65 1601
15 3 BHK 124.78 1602
15 3 BHK 124.78 1603
15 3 BHK 124.78 1604
16 3 BHK 142.65 1701
16 3 BHK 124.78 1702
16 3 BHK 124.78 1703
16 3 BHK 124.78 1704
17 3 BHK 142.65 1801
17 3 BHK 124.78 1802
17 3 BHK 124.78 1803
17 3 BHK 124.78 1804
18 3 BHK 142.65 1901
18 3 BHK 124.78 1902
18 3 BHK 124.78 1903
18 3 BHK 124.78 1904
19 3 BHK 142.65 2001
19 3 BHK 124.78 2002
19 3 BHK 124.78 2003
19 3 BHK 124.78 2004
20 3 BHK 142.65 2101
20 3 BHK 124.78 2102
20 3 BHK 124.78 2103
20 3 BHK 124.78 2104
21 3 BHK 142.65 2201
21 3 BHK 124.78 2202
21 3 BHK 124.78 2203
21 3 BHK 124.78 2204
22 3 BHK 142.65 2301
22 3 BHK 124.78 2302
22 3 BHK 124.78 2303
22 3 BHK 124.78 2304
23 3 BHK 142.65 2401
23 3 BHK 124.78 2402
23 3 BHK 124.78 2403
23 3 BHK 124.78 2404
24 3 BHK 142.65 2501
24 3 BHK 124.78 2502
24 3 BHK 124.78 2503
24 3 BHK 124.78 2504
25 3 BHK 142.65 2601
25 3 BHK 124.78 2602
25 3 BHK 124.78 2603
25 3 BHK 124.78 2604
Parking

Parking, Garage & Area Details

Parking provision declared in the sanctioned plan.

Type Proposed Booked Work Done
Garage - - -
Covered Parking - - -
Open Parking - - -
Development

Development Works & Common Area Disclosures

Project-level common infrastructure disclosures as reported by the developer to the RERA authority.

Sub Structure Earth Work And Other Leveling Preparation Work % not reported Sub Structure Foundation Footing Work % not reported Sub Structure Upto Plinth Level % not reported
Sub Structure Sub-structure Flooring (Parking Floor, More Than One Floor Below General Ground Level) % not reported Sub Structure Retaining Wall (All Types) % not reported Sup Structure Rcc Or Ms Framed Structure % not reported
Sup Structure Masonry Construction % not reported Sup Structure Plastering Inside , Outside & Ceiling % not reported Sup Structure Joinery: Doors, Windows, Ventilators Etc % not reported
Sup Structure Basic Work Of Water Supply, Sanitary And Electrification % not reported Sup Structure Dadoing, Skirting, Flooring, Tiles Work (All Types) % not reported Sup Structure Railing And Grill Fixing % not reported
Finishing Works Electrification, Water Supply And Sanitary Finishing % not reported Finishing Works Painting % not reported Finishing Works Fire Prevention And Fire Fighting Fitting And Fixture With Network % not reported
Finishing Works Weather Proof Work(tile,concrete) % not reported Finishing Works Wardrobe, Showcase, Kitchen Cabinet, Puja Work % not reported Finishing Works Elevation Work % not reported
Finishing Works Internal And External Work Including Landscapes As Per Sanctioned Drawings % not reported Internal Infrastructure Water Supply % not reported Internal Infrastructure Sewage And Drainage System % not reported
Internal Infrastructure Water Conservation/rain Water Harvesting/recharge Of Ground Water % not reported Internal Infrastructure Energy Management % not reported Internal Infrastructure Fire Protection And Fire Safety Requirements % not reported
Internal Infrastructure Solid Waste Management And Disposal % not reported Internal Infrastructure Emergency Evacuation Services % not reported External Infrastructure Water Supply % not reported
External Infrastructure Internal Roads & Footpaths % not reported External Infrastructure Sewage And Drainage System % not reported External Infrastructure Electricity Supply Transformer And Substation % not reported
External Infrastructure Solid Waste Management And Disposal % not reported External Infrastructure Emergency Evacuation Services % not reported External Infrastructure Storm Water Drains % not reported
External Infrastructure Use Of Renewable Energy % not reported External Infrastructure Water Conservation/rain Water Harvesting/recharge Of Ground Water % not reported External Infrastructure Fire Protection And Fire Safety Requirements % not reported
External Infrastructure Sewage Treatment Plant (Stp) % not reported External Infrastructure Parks & Tree Planting % not reported External Infrastructure Street Lighting % not reported
Amenities Electricity % not reported Amenities Smart Home Automation % not reported Amenities Cctv Surveillance % not reported
Amenities Club House % not reported Amenities Community Hall % not reported Amenities Outdoor Sports Facility % not reported
Amenities Indoor Sports Facility % not reported Amenities Swimming Pool % not reported Amenities Gym % not reported
Amenities Parks % not reported Amenities Power Backup % not reported Amenities Piped Gas % not reported
Amenities Water And Sanitation % not reported Amenities Air Conditioning % not reported Common Areas Staircases % not reported
Common Areas Lifts % not reported Common Areas Corridor/lobbies % not reported Common Areas Fire Escapes % not reported
Common Areas Common Entrance And Exit For The Building/common Portico/foyer/verandah % not reported Common Areas Basement % not reported Common Areas Terrace % not reported
Common Areas Outer Wall % not reported Common Areas Open Parking Areas % not reported Common Areas Provision For Lodging Of Management Staff And Security Staff % not reported
Common Areas Water Conservation And Renewable Energy % not reported Common Areas Common Storage Spaces % not reported
Documents

RERA Documents & Filings

All statutory documents uploaded by the promoter to the authority portal.

Promoter Registration Certificate
Promoter Pan Card
Promoter Address Proof
Affidavit
Fd 1 INFRAA - Financials AY-23-24.Pdf
Fd 2 ARSFinancialsFY 2223.Pdf
Fd 3 ARS INFRAA FY 21220001 126compressed.Pdf
Fd 4 INFRAA - Financials AY-23-24.Pdf
Fd 5 ARSFinancialsFY 2223.Pdf
Fd 6 ARS INFRAA FY 21220001 126compressed.Pdf
Fd 7 INFRAA - Financials AY-23-24.Pdf
Fd 8 ARSFinancialsFY 2223.Pdf
Fd 9 ARS INFRAA FY 21220001 126compressed.Pdf
Pd 1 Commencement Certificate( Annexure - 80 )
Pd 2 Approved Building Plan( Annexure - 81 )
Pd 4 Certificate From Registered Engineer Indicating The Structural Safety Of The Building( Annexure - 83 )
Pd 5 Project Specifications( Annexure - 84 )
Pd 6 Brochure( Annexure - 85 )
Dc 1 Declaration (Form B)( Annexure - 89 )
Dc 2 Section 3(1) Notarized Affidavit( Annexure - 90 )
Dc 3 JD AFFIDAVIT CUM DECLARATION( Annexure - 91 )
Noc 1 ESCOM Electricity( Annexure - 95 )
Noc 2 KWSSB Water( Annexure - 96 )
Noc 4 SEIAA( Annexure - 98 )
Noc 5 Fire Force Department( Annexure - 99 )
Noc 6 Airport Authority Of India( Annexure - 100 )
Noc 13 Coastal Regulation Zone Authority( Annexure - 107 )
Photo 1 Project Photo
Od 1 CDP MAP.Pdf
Od 2 Sompura Village Map.Pdf
Od 3 ZR COPY.Pdf
Od 4 SWASA 3.PDF
Od 5 SWASA CC LETTER.Pdf
Od 6 STP DRAWING ZURICH.Pdf
Od 7 Typical Floor Plan.PDF
Ed 1 17-01-2025
Ed 2 17-01-2025
Ed 3 17-01-2025
Ed 4 17-01-2025
Ed 5 17-01-2025
Ed 6 17-01-2025
Ed 7 17-01-2025
Ed 8 17-01-2025
Ed 9 17-01-2025
Ed 10 17-01-2025
Ed 11 17-01-2025
Ed 12 17-01-2025
Ed 13 17-01-2025
Ed 14 17-01-2025
Ld Rtc
Ld Mutation
Ld Encumbrance Certificate
Ld Conversion Order
Ld Khatha
Bank

Bank & Cost Disclosure

Declared project cost and the designated escrow account on file.

Project Account Bank ICICI Bank
Account Number (RERA) 777705231035
IFSC ICIC0004387
Branch Address SARJAPURA
Country/City