Squareyards Logo
Blogs
Sell or Rent Property
Login
Rera Banner
residential Under Construction Source: rera.ka

Disha Pursuit Of The Elements RERA Details - PRM/KA/RERA/1251/308/PR/060924/007003 Bangalore

View the RERA registration, promoter, approval, building, inventory, document and construction-progress disclosures for Disha Pursuit Of The Elements under registration PRM/KA/RERA/1251/308/PR/060924/007003 in Bangalore, Karnataka. Data is sourced from rera.ka.

RERA

RERA Snapshot

The most important statutory project disclosures, generated dynamically from available RERA fields.

  • RERA Number PRM/KA/RERA/1251/308/PR/060924/007003
  • Project Name Disha Pursuit of the Elements Phase II
  • Project Type Residential/Group Housing
  • Project Status Under Construction
  • District Bengaluru Urban
  • Taluka Anekal
  • Original Completion 31 December 2028
  • Documents 112 Verified
Timeline

Project Timeline & Completion Details

Key statutory dates from registration through proposed completion and permit validity.

Proposed Start 31 December 2024 Expected commencement of civil works and foundation on site.
Original Completion 31 December 2028 Mandated date for project handover to the allottees and final compliance filing.
Promoter

Promoter, Organisation & Member Details

Declared promoter entity, address and corporate identifiers on file with the authority.

Primary Promoter

Dishahabitat Projects LLP
Registered Address No.43/2, 2nd Floor, Above Axis Bank,Near Hope Farm Junction, Whitefield Main Road ,Bengaluru East ,Bengaluru Urban-560066
Experience Details
Location

Land, Address & Location Details

Land parcel, zoning and geo-coordinates as recorded in the project filing.

Address Sy No.154,155,156,157,166/1,167/2 of , Halasalahalli Thippasandra Village , Anekal , Bengaluru Urban, Karnataka - 560087

RERA Coordinates

Latitude, Longitude 12.922521161832746, 77.75683316846359
Plans

Plans & Approvals

Statutory approvals obtained or pending against the project site.

Plan Approval No. B.D.A/E.M/E.O-1/T.A-4/EAST/40/2023-24
Authority BDA - Bangalore Development Authority
Approved Date 14 December 2023

Understand this Project's RERA details

Get clear answers and additional support from our RERA experts.

RERA Banner
Buildings

Buildings, Towers & Building-Level Details

Statutory building-level disclosures including tower height, sanctioned floors, structural counts and parking areas.

Building Detail
Name No. of Basements No. of Slab No. of Slits No. of Open Parking Building Type Height of Tower No. of Floors No. of Units
Tower A 1 27 0 198 Residential 82.35 26 198
Tower B 1 27 0 198 Residential 82.35 26 198
Tower D 2 31 0 113 Residential 98.55 30 113

Scroll horizontally to view all building-level fields. Values marked "-" were not disclosed in the source RERA record.

Inventory

Unit Inventory & Configuration Details

Configuration mix and floor-level disclosures with both grouped and raw RERA views.

Total Units -
Configurations 3
Inventory Type RESIDENTIAL
Configuration Distribution
2 BHK 0 units
3 BHK 0 units
4 BHK 0 units
  • Tower A
  • Tower B
  • Tower D
Floor-Wise Inventory Explorer
Floor Apartment Type Carpet Area No. of Unit
1 3BHK 2T 89.49 A0101
1 2 BHK 73.50 A0102
1 2 BHK 78.31 A0103
1 3BHK 2T 89.76 A0104
1 3BHK 3T 112.13 A0105
1 3BHK 3T 103.01 A0106
1 3BHK 2T 90.53 A0107
1 3BHK 3T 103.25 A0108
2 3BHK 2T 89.49 A0201
2 2 BHK 73.50 A0202
2 2 BHK 78.31 A0203
2 3BHK 2T 89.76 A0204
2 3BHK 3T 112.13 A0205
2 3BHK 3T 103.01 A0206
2 3BHK 2T 90.53 A0207
2 3BHK 3T 103.25 A0208
3 3BHK 2T 89.49 A0301
3 2 BHK 73.50 A0302
3 2 BHK 78.31 A0303
3 3BHK 2T 89.76 A0304
3 3BHK 3T 112.13 A0305
3 3BHK 3T 103.01 A0306
3 3BHK 2T 90.53 A0307
3 3BHK 3T 103.25 A0308
4 3BHK 2T 89.49 A0401
4 2 BHK 73.50 A0402
4 2 BHK 78.31 A0403
4 3BHK 2T 89.76 A0404
4 3BHK 3T 112.13 A0405
4 3BHK 3T 103.01 A0406
4 3BHK 2T 90.53 A0407
4 3BHK 3T 103.25 A0408
5 3BHK 2T 89.49 A0501
5 2 BHK 73.50 A0502
5 2 BHK 78.31 A0503
5 3BHK 2T 89.76 A0504
5 3BHK 3T 112.13 A0505
5 3BHK 3T 103.01 A0506
5 3BHK 2T 90.53 A0507
5 3BHK 3T 103.25 A0508
6 3BHK 2T 89.49 A0601
6 2 BHK 73.50 A0602
6 2 BHK 78.31 A0603
6 3BHK 2T 89.76 A0604
6 3BHK 3T 112.13 A0605
6 3BHK 3T 103.01 A0606
6 3BHK 2T 90.53 A0607
6 3BHK 3T 103.25 A0608
7 3BHK 2T 89.49 A0701
7 2 BHK 73.50 A0702
7 2 BHK 78.31 A0703
7 3BHK 2T 89.76 A0704
7 3BHK 3T 112.13 A0705
7 3BHK 3T 103.01 A0706
7 3BHK 2T 90.53 A0707
7 3BHK 3T 103.25 A0708
8 3BHK 2T 89.49 A0801
8 2 BHK 73.50 A0802
8 2 BHK 78.31 A0803
8 3BHK 2T 89.76 A0804
8 3BHK 3T 112.13 A0805
8 3BHK 3T 103.01 A0806
8 3BHK 2T 90.53 A0807
8 3BHK 3T 103.25 A0808
9 3BHK 2T 89.49 A0901
9 2 BHK 73.50 A0902
9 2 BHK 78.31 A0903
9 3BHK 2T 89.76 A0904
9 3BHK 3T 112.13 A0905
9 3BHK 3T 103.01 A0906
9 3BHK 2T 90.53 A0907
9 3BHK 3T 103.25 A0908
10 3BHK 2T 89.49 A1001
10 2 BHK 73.50 A1002
10 2 BHK 78.31 A1003
10 3BHK 2T 89.76 A1004
10 3BHK 3T 112.13 A1005
10 3BHK 3T 103.01 A1006
10 3BHK 2T 90.53 A1007
10 3BHK 3T 103.25 A1008
11 3BHK 2T 89.49 A1101
11 2 BHK 73.50 A1102
11 2 BHK 78.31 A1103
11 3BHK 2T 89.76 A1104
11 3BHK 3T 112.13 A1105
11 3BHK 3T 103.01 A1106
11 3BHK 2T 90.53 A1107
11 3BHK 3T 103.25 A1108
12 3BHK 2T 89.49 A1201
12 2 BHK 73.50 A1202
12 2 BHK 78.31 A1203
12 3BHK 2T 89.76 A1204
12 3BHK 3T 112.13 A1205
12 3BHK 3T 103.01 A1206
12 3BHK 2T 90.53 A1207
12 3BHK 3T 103.25 A1208
13 3BHK 2T 89.49 A1301
13 2 BHK 73.50 A1302
13 2 BHK 78.31 A1303
13 3BHK 2T 89.76 A1304
13 3BHK 3T 112.13 A1305
13 3BHK 3T 103.01 A1306
13 3BHK 2T 90.53 A1307
13 3BHK 3T 103.25 A1308
14 3BHK 2T 89.49 A1401
14 2 BHK 73.50 A1402
14 2 BHK 78.31 A1403
14 3BHK 2T 89.76 A1404
14 3BHK 3T 112.13 A1405
14 3BHK 3T 103.01 A1406
14 3BHK 2T 90.53 A1407
14 3BHK 3T 103.25 A1408
15 3BHK 2T 89.49 A1501
15 2 BHK 73.50 A1502
15 2 BHK 78.31 A1503
15 3BHK 2T 89.76 A1504
15 3BHK 3T 112.13 A1505
15 3BHK 3T 103.01 A1506
15 3BHK 2T 90.53 A1507
15 3BHK 3T 103.25 A1508
16 3BHK 2T 89.49 A1601
16 2 BHK 73.50 A1602
16 2 BHK 78.31 A1603
16 3BHK 2T 89.76 A1604
16 3BHK 3T 112.13 A1605
16 3BHK 3T 103.01 A1606
16 3BHK 2T 90.53 A1607
16 3BHK 3T 103.25 A1608
17 3BHK 2T 89.49 A1701
17 2 BHK 73.50 A1702
17 2 BHK 78.31 A1703
17 3BHK 2T 89.76 A1704
17 3BHK 3T 112.13 A1705
17 3BHK 3T 103.01 A1706
17 3BHK 2T 90.53 A1707
17 3BHK 3T 103.25 A1708
18 3BHK 2T 89.49 A1801
18 2 BHK 73.50 A1802
18 3BHK 2T 89.76 A1803
18 3BHK 3T 112.13 A1804
18 3BHK 3T 103.01 A1805
18 3BHK 2T 90.53 A1806
18 3BHK 3T 103.25 A1807
19 3BHK 2T 89.49 A1901
19 2 BHK 73.50 A1902
19 2 BHK 78.31 A1903
19 3BHK 2T 89.76 A1904
19 3BHK 3T 112.13 A1905
19 3BHK 3T 103.01 A1906
19 3BHK 2T 90.53 A1907
19 3BHK 3T 103.25 A1908
20 3BHK 2T 89.49 A2001
20 2 BHK 73.50 A2002
20 2 BHK 78.31 A2003
20 3BHK 2T 89.76 A2004
20 3BHK 3T 112.13 A2005
20 3BHK 3T 103.01 A2006
20 3BHK 2T 90.53 A2007
20 3BHK 3T 103.25 A2008
21 3BHK 2T 89.49 A2101
21 2 BHK 73.50 A2102
21 2 BHK 78.31 A2103
21 3BHK 2T 89.76 A2104
21 3BHK 3T 112.13 A2105
21 3BHK 3T 103.01 A2106
21 3BHK 2T 90.53 A2107
21 3BHK 3T 103.25 A2108
22 3BHK 2T 89.49 A2201
22 2 BHK 73.50 A2202
22 3BHK 2T 89.76 A2203
22 3BHK 3T 112.13 A2204
22 3BHK 3T 103.01 A2205
22 3BHK 2T 90.53 A2206
22 3BHK 3T 103.25 A2207
23 3BHK 2T 89.49 A2301
23 2 BHK 73.50 A2302
23 2 BHK 78.31 A2303
23 3BHK 2T 89.76 A2304
23 3BHK 3T 112.13 A2305
23 3BHK 3T 103.01 A2306
23 3BHK 2T 90.53 A2307
23 3BHK 3T 103.25 A2308
24 3BHK 2T 89.49 A2401
24 2 BHK 73.50 A2402
24 2 BHK 78.31 A2403
24 3BHK 2T 89.76 A2404
24 3BHK 3T 112.13 A2405
24 3BHK 3T 103.01 A2406
24 3BHK 2T 90.53 A2407
24 3BHK 3T 103.25 A2408
25 3BHK 2T 89.49 A2501
25 2 BHK 73.50 A2502
25 2 BHK 78.31 A2503
25 3BHK 2T 89.76 A2504
25 3BHK 3T 112.13 A2505
25 3BHK 3T 103.01 A2506
25 3BHK 2T 90.53 A2507
25 3BHK 3T 103.25 A2508
Parking

Parking, Garage & Area Details

Parking provision declared in the sanctioned plan.

Type Proposed Booked Work Done
Garage - - -
Covered Parking - - -
Open Parking - - -
Development

Development Works & Common Area Disclosures

Project-level common infrastructure disclosures as reported by the developer to the RERA authority.

Sub Structure Earth Work And Other Leveling Preparation Work % not reported Sub Structure Foundation Footing Work % not reported Sub Structure Upto Plinth Level % not reported
Sub Structure Sub-structure Flooring (Parking Floor, More Than One Floor Below General Ground Level) % not reported Sub Structure Retaining Wall (All Types) % not reported Sup Structure Rcc Or Ms Framed Structure % not reported
Sup Structure Masonry Construction % not reported Sup Structure Plastering Inside , Outside & Ceiling % not reported Sup Structure Joinery: Doors, Windows, Ventilators Etc % not reported
Sup Structure Basic Work Of Water Supply, Sanitary And Electrification % not reported Sup Structure Dadoing, Skirting, Flooring, Tiles Work (All Types) % not reported Sup Structure Railing And Grill Fixing % not reported
Finishing Works Electrification, Water Supply And Sanitary Finishing % not reported Finishing Works Painting % not reported Finishing Works Fire Prevention And Fire Fighting Fitting And Fixture With Network % not reported
Finishing Works Weather Proof Work(tile,concrete) % not reported Finishing Works Wardrobe, Showcase, Kitchen Cabinet, Puja Work % not reported Finishing Works Elevation Work % not reported
Finishing Works Internal And External Work Including Landscapes As Per Sanctioned Drawings % not reported Internal Infrastructure Water Supply % not reported Internal Infrastructure Sewage And Drainage System % not reported
Internal Infrastructure Water Conservation/rain Water Harvesting/recharge Of Ground Water % not reported Internal Infrastructure Energy Management % not reported Internal Infrastructure Fire Protection And Fire Safety Requirements % not reported
Internal Infrastructure Solid Waste Management And Disposal % not reported Internal Infrastructure Emergency Evacuation Services % not reported External Infrastructure Water Supply % not reported
External Infrastructure Internal Roads & Footpaths % not reported External Infrastructure Sewage And Drainage System % not reported External Infrastructure Electricity Supply Transformer And Substation % not reported
External Infrastructure Solid Waste Management And Disposal % not reported External Infrastructure Emergency Evacuation Services % not reported External Infrastructure Storm Water Drains % not reported
External Infrastructure Use Of Renewable Energy % not reported External Infrastructure Water Conservation/rain Water Harvesting/recharge Of Ground Water % not reported External Infrastructure Fire Protection And Fire Safety Requirements % not reported
External Infrastructure Sewage Treatment Plant (Stp) % not reported External Infrastructure Parks & Tree Planting % not reported External Infrastructure Street Lighting % not reported
Amenities Electricity % not reported Amenities Smart Home Automation % not reported Amenities Cctv Surveillance % not reported
Amenities Club House % not reported Amenities Community Hall % not reported Amenities Outdoor Sports Facility % not reported
Amenities Indoor Sports Facility % not reported Amenities Swimming Pool % not reported Amenities Gym % not reported
Amenities Parks % not reported Amenities Power Backup % not reported Amenities Piped Gas % not reported
Amenities Water And Sanitation % not reported Amenities Air Conditioning % not reported Common Areas Staircases % not reported
Common Areas Lifts % not reported Common Areas Corridor/lobbies % not reported Common Areas Fire Escapes % not reported
Common Areas Common Entrance And Exit For The Building/common Portico/foyer/verandah % not reported Common Areas Basement % not reported Common Areas Terrace % not reported
Common Areas Outer Wall % not reported Common Areas Open Parking Areas % not reported Common Areas Provision For Lodging Of Management Staff And Security Staff % not reported
Common Areas Water Conservation And Renewable Energy % not reported Common Areas Common Storage Spaces % not reported
Documents

RERA Documents & Filings

All statutory documents uploaded by the promoter to the authority portal.

Promoter Registration Certificate
Promoter Pan Card
Promoter Address Proof
Affidavit
Fd 1 Balance Sheet FY 2022-23.Pdf
Fd 2 Balance Sheet FY 2021-22.Pdf
Fd 3 Balance Sheet FY 2020-21.Pdf
Fd 4 Profit And Loss FY 2022-23.Pdf
Fd 5 Profit & Loss FY 2021-22.Pdf
Fd 6 Profit & Loss FY 2020-21.Pdf
Fd 7 NA.Jpg
Fd 8 NA.Jpg
Fd 9 NA.Jpg
Fd 10 NA.Jpg
Fd 11 NA.Jpg
Fd 12 NA.Jpg
Fd 13 Statement Of Income FY 2022-23.Pdf
Fd 14 NA.Jpg
Fd 15 NA.Jpg
Fd 16 ITR FY 2022-23.Pdf
Fd 17 ITR FY 2021-22.Pdf
Fd 18 ITR FY 2020-21.Pdf
Pd 1 Self Attested PAN Card*( Annexure - 66 )
Pd 2 Commencement Certificate*( Annexure - 67 )
Pd 3 Electricity Permission Letter*( Annexure - 68 )
Pd 4 Water Permission Letter*( Annexure - 69 )
Pd 5 Approved Layout Plan*( Annexure - 70 )
Pd 6 Approved Building Plotting Plan*( Annexure - 71 )
Pd 7 Existing Layout Plan( Annexure - 72 )
Pd 8 Existing Section Plan And Specification( Annexure - 73 )
Pd 9 Sectional Drawing Of The Apartments*( Annexure - 74 )
Pd 10 Project Specifications*( Annexure - 75 )
Pd 11 Approved Section Of Building Infrastructure Plan Of Plotting*( Annexure - 76 )
Pd 12 Area Development Plan Of Project Area*( Annexure - 77 )
Pd 13 Certificate From Registered Engineer Indicating The Structural Safety Of The Building*( Annexure - 78 )
Pd 14 Advocate Search Report*( Annexure - 79 )
Pd 15 Urban Land Ceiling*( Annexure - 80 )
Pd 16 Collaboration Agreement Development Agreement Joint Development Agreement Other Agreement*( Annexure - 81 )
Pd 17 Change Of Land Use*( Annexure - 82 )
Pd 18 District Magistrate*( Annexure - 83 )
Pd 19 Conversion Certificate Under Section 95 Of The KLR Act 1964*( Annexure - 84 )
Pd 20 Any Other Document (Rights Title Interest Name)*( Annexure - 85 )
Pd 21 Proforma Of Agreement For Sale*( Annexure - 86 )
Pd 22 Proforma Of Allotment Letter*( Annexure - 87 )
Pd 24 Brochure*( Annexure - 89 )
Dc 1 Declaration (Form B)*( Annexure - 90 )
Dc 2 Section 3(1) Notarized Affidavit*( Annexure - 91 )
Dc 3 JD AFFIDAVIT CUM DECLARATION*( Annexure - 92 )
Noc 1 ESCOM Electricity*( Annexure - 93 )
Noc 2 KWSSB Water*( Annexure - 94 )
Noc 5 Fire Force Department( Annexure - 97 )
Noc 6 Airport Authority Of India( Annexure - 98 )
Noc 7 KSPCB( Annexure - 99 )
Noc 8 SEIAA( Annexure - 100 )
Noc 9 BSNL( Annexure - 101 )
Dr 3 Relinquishment Deed( Annexure - 110 )
Photo 1 Project Photo
Od 1 Building License.Pdf
Od 2 Demarcated Plan.Pdf
Od 3 1st Floor Plan.Pdf
Od 4 2nd Floor Plan.Pdf
Od 5 Building Plan.Pdf
Od 6 Row Houses Ground Floor Plan.Pdf
Od 7 Section And Elevation.Pdf
Od 8 Terrace Floor Plan, Section And Elevation.Pdf
Od 9 Tower ABCDEF 1st Basement Floor Plan.Pdf
Od 10 Tower ABCDEFG 1st Floor Plan.Pdf
Od 11 Tower ABCDEFG 2nd To 18th & 20th To 22th Floor Plan.Pdf
Od 12 Tower ABCDEFG 19th & 23rd Floor Plan.Pdf
Od 13 Tower ABCDEFG 24th Floor Plan.Pdf
Od 14 Tower ABCDEFG 25, 26th FP, Tower C Terrace FP.Pdf
Od 15 Tower ABCDEFG GFP.Pdf
Od 16 Tower ABCDEFG Ground Floor Plan.Pdf
Od 17 Tower CDE 2nd Basement Floor Plan.Pdf
Od 18 Tower D&E 28th Floor Plan.Pdf
Od 19 Tower D&E Terrace Floor Plan.Pdf
Od 20 Tower DE-27,29,30th FP, Tower ABFG Terrace Floor Plan.Pdf
Od 21 Declaration For Commencement Certificate.Pdf
Od 22 Declaration For KSPCB NOC.Pdf
Od 23 Declaration For Registration Fees.Pdf
Od 24 Declaration For SEIAA NOC.Pdf
Od 25 Declaration Survey Numbers.Pdf
Od 26 Land Cost Calculation Sheet.Pdf
Od 27 Village Map.Pdf
Od 28 CDP Plan.Pdf
Od 29 No Mortgage Affidavit.Pdf
Od 30 STP Drawing.Pdf
Od 31 Abstract Estimation.Pdf
Od 32 Guidance Value Certificate.Pdf
Od 33 Development Plan And Order.Pdf
Od 34 Akarbandh.Pdf
Od 35 Survey Sketch.Pdf
Od 36 Hissa Phodi.Pdf
Od 37 ZR Showing Lake Buffer.Pdf
Ed 1 07-06-2024
Ed 2 07-06-2024
Ed 3 07-06-2024
Ed 4 07-06-2024
Ed 5 07-06-2024
Ed 6 07-06-2024
Ed 7 07-06-2024
Ed 8 07-06-2024
Ed 9 07-06-2024
Ed 10 07-06-2024
Ed 11 07-06-2024
Ed 12 07-06-2024
Ed 13 06-08-2024
Ld Rtc
Ld Mutation
Ld Encumbrance Certificate
Ld Conversion Order
Ld Khatha
Bank

Bank & Cost Disclosure

Declared project cost and the designated escrow account on file.

Project Account Bank Axis Bank
Account Number (RERA) 923020023902257
IFSC UTIB0002177
Branch Address WHITEFIELD MAIN ROAD
Country/City