Srinivasa Srinis Pristine RERA Details - PRM/KA/RERA/1251/308/PR/040925/008056 Bangalore

View the RERA registration, promoter, approval, building, inventory, document and construction-progress disclosures for Srinivasa Srinis Pristine under registration PRM/KA/RERA/1251/308/PR/040925/008056 in Bangalore, Karnataka. Data is sourced from rera.ka.

RERA

RERA Snapshot

The most important statutory project disclosures, generated dynamically from available RERA fields.

  • RERA Number PRM/KA/RERA/1251/308/PR/040925/008056
  • Project Name SRINIS PRISTINE
  • Project Type Residential/Group Housing
  • Project Status New Launch
  • District Bengaluru Urban
  • Taluka Anekal
  • Original Completion 31 December 2028
  • Documents 67 Verified
Timeline

Project Timeline & Completion Details

Key statutory dates from registration through proposed completion and permit validity.

Proposed Start 20 March 2025 Expected commencement of civil works and foundation on site.
Original Completion 31 December 2028 Mandated date for project handover to the allottees and final compliance filing.
Promoter

Promoter, Organisation & Member Details

Declared promoter entity, address and corporate identifiers on file with the authority.

Primary Promoter

SRINIVASA CONSTRUCTIONS
Registered Address No.49, BL Urban, Green Glen Layout, Bellandur, Bangalore- 560103,Green Glen Layout, Bellandur, Bangalore- 560103 ,Bengaluru South ,Bengaluru Urban-560103
Experience Details
Location

Land, Address & Location Details

Land parcel, zoning and geo-coordinates as recorded in the project filing.

Address Sy.No. 48/1 land measuring 1 acre, Khatha No.1562/48/1 PID No. 150200100100221800 , Chambenahalli Village, Sarjapur Hobli, Anekal Taluk, Bangalore Urban District. , Anekal , Bengaluru Urban, Karnataka - 562125

RERA Coordinates

Latitude, Longitude 12.882832860793426, 77.7659480883572
Plans

Plans & Approvals

Statutory approvals obtained or pending against the project site.

Plan Approval No. APA/CC/1025/ 2024-2025
Authority Anekal Planning Authority
Approved Date 04 April 2025

Understand this Project's RERA details

Get clear answers and additional support from our RERA experts.

RERA Banner
Buildings

Buildings, Towers & Building-Level Details

Statutory building-level disclosures including tower height, sanctioned floors, structural counts and parking areas.

Building Detail
Name No. of Basements No. of Slab No. of Slits No. of Open Parking Building Type Height of Tower No. of Floors No. of Units
A 0 5 1 85 Residential 14.95 3 76

Scroll horizontally to view all building-level fields. Values marked "-" were not disclosed in the source RERA record.

Inventory

Unit Inventory & Configuration Details

Configuration mix and floor-level disclosures with both grouped and raw RERA views.

Total Units -
Configurations 2
Inventory Type RESIDENTIAL
Configuration Distribution
2 BHK 0 units
3 BHK 0 units
  • A
Floor-Wise Inventory Explorer
Floor Apartment Type Carpet Area No. of Unit
-1 3 BHK 89.74 1
-1 3 BHK 102.56 2
-1 3 BHK 96.8 3
-1 3 BHK 83.8 4
-1 3 BHK 86.96 5
-1 3 BHK 92.07 6
-1 3 BHK 90.86 7
-1 3 BHK 85.93 8
-1 2 BHK 69.21 9
-1 2 BHK 73.49 10
-1 3 BHK 80.17 11
-1 3 BHK 90.67 12
-1 3 BHK 89.28 13
-1 2 BHK 60.2 14
-1 3 BHK 91.04 15
-1 2 BHK 71.72 16
-1 2 BHK 71.72 17
-1 3 BHK 91.69 18
-1 3 BHK 91.6 19
GF 3 BHK 89.74 101
GF 3 BHK 102.56 102
GF 3 BHK 96.8 103
GF 3 BHK 83.8 104
GF 3 BHK 86.96 105
GF 3 BHK 92.07 106
GF 3 BHK 90.86 107
GF 3 BHK 85.93 108
GF 2 BHK 69.21 109
GF 2 BHK 73.49 110
GF 3 BHK 80.17 111
GF 3 BHK 90.67 112
GF 3 BHK 89.28 113
GF 2 BHK 60.2 114
GF 3 BHK 91.04 115
GF 2 BHK 71.72 116
GF 2 BHK 71.72 117
GF 3 BHK 91.69 118
GF 3 BHK 91.6 119
1 3 BHK 89.74 201
1 3 BHK 102.56 202
1 3 BHK 96.8 203
1 3 BHK 83.8 204
1 3 BHK 86.96 205
1 3 BHK 92.07 206
1 3 BHK 90.86 207
1 3 BHK 85.93 208
1 2 BHK 69.21 209
1 2 BHK 73.49 210
1 3 BHK 80.17 211
1 3 BHK 90.67 212
1 3 BHK 89.28 213
1 2 BHK 60.2 214
1 3 BHK 91.04 215
1 2 BHK 71.72 216
1 2 BHK 71.72 217
1 3 BHK 91.69 218
1 3 BHK 91.6 219
2 3 BHK 89.74 301
2 3 BHK 102.56 302
2 3 BHK 96.8 303
2 3 BHK 83.8 304
2 3 BHK 86.96 305
2 3 BHK 92.07 306
2 3 BHK 90.86 307
2 3 BHK 85.93 308
2 2 BHK 69.21 309
2 2 BHK 73.49 310
2 3 BHK 80.17 311
2 3 BHK 90.67 312
2 3 BHK 89.28 313
2 2 BHK 60.2 314
2 3 BHK 91.04 315
2 2 BHK 71.72 316
2 2 BHK 71.72 317
2 3 BHK 91.69 318
2 3 BHK 91.6 319
Parking

Parking, Garage & Area Details

Parking provision declared in the sanctioned plan.

Type Proposed Booked Work Done
Garage - - -
Covered Parking - - -
Open Parking - - -
Development

Development Works & Common Area Disclosures

Project-level common infrastructure disclosures as reported by the developer to the RERA authority.

Sub Structure Earth Work And Other Leveling Preparation Work % not reported Sub Structure Foundation Footing Work % not reported Sub Structure Upto Plinth Level % not reported
Sub Structure Sub-structure Flooring (Parking Floor, More Than One Floor Below General Ground Level) % not reported Sub Structure Retaining Wall (All Types) % not reported Sup Structure Rcc Or Ms Framed Structure % not reported
Sup Structure Masonry Construction % not reported Sup Structure Plastering Inside , Outside & Ceiling % not reported Sup Structure Joinery: Doors, Windows, Ventilators Etc % not reported
Sup Structure Basic Work Of Water Supply, Sanitary And Electrification % not reported Sup Structure Dadoing, Skirting, Flooring, Tiles Work (All Types) % not reported Sup Structure Railing And Grill Fixing % not reported
Finishing Works Electrification, Water Supply And Sanitary Finishing % not reported Finishing Works Painting % not reported Finishing Works Fire Prevention And Fire Fighting Fitting And Fixture With Network % not reported
Finishing Works Weather Proof Work(tile,concrete) % not reported Finishing Works Wardrobe, Showcase, Kitchen Cabinet, Puja Work % not reported Finishing Works Elevation Work % not reported
Finishing Works Internal And External Work Including Landscapes As Per Sanctioned Drawings % not reported Internal Infrastructure Water Supply % not reported Internal Infrastructure Sewage And Drainage System % not reported
Internal Infrastructure Water Conservation/rain Water Harvesting/recharge Of Ground Water % not reported Internal Infrastructure Energy Management % not reported Internal Infrastructure Fire Protection And Fire Safety Requirements % not reported
Internal Infrastructure Solid Waste Management And Disposal % not reported Internal Infrastructure Emergency Evacuation Services % not reported External Infrastructure Water Supply % not reported
External Infrastructure Internal Roads & Footpaths % not reported External Infrastructure Sewage And Drainage System % not reported External Infrastructure Electricity Supply Transformer And Substation % not reported
External Infrastructure Solid Waste Management And Disposal % not reported External Infrastructure Emergency Evacuation Services % not reported External Infrastructure Storm Water Drains % not reported
External Infrastructure Use Of Renewable Energy % not reported External Infrastructure Water Conservation/rain Water Harvesting/recharge Of Ground Water % not reported External Infrastructure Fire Protection And Fire Safety Requirements % not reported
External Infrastructure Sewage Treatment Plant (Stp) % not reported External Infrastructure Parks & Tree Planting % not reported External Infrastructure Street Lighting % not reported
Amenities Electricity % not reported Amenities Smart Home Automation % not reported Amenities Cctv Surveillance % not reported
Amenities Club House % not reported Amenities Community Hall % not reported Amenities Outdoor Sports Facility % not reported
Amenities Indoor Sports Facility % not reported Amenities Swimming Pool % not reported Amenities Gym % not reported
Amenities Parks % not reported Amenities Power Backup % not reported Amenities Piped Gas % not reported
Amenities Water And Sanitation % not reported Amenities Air Conditioning % not reported Common Areas Staircases % not reported
Common Areas Lifts % not reported Common Areas Corridor/lobbies % not reported Common Areas Fire Escapes % not reported
Common Areas Common Entrance And Exit For The Building/common Portico/foyer/verandah % not reported Common Areas Basement % not reported Common Areas Terrace % not reported
Common Areas Outer Wall % not reported Common Areas Open Parking Areas % not reported Common Areas Provision For Lodging Of Management Staff And Security Staff % not reported
Common Areas Water Conservation And Renewable Energy % not reported Common Areas Common Storage Spaces % not reported
Documents

RERA Documents & Filings

All statutory documents uploaded by the promoter to the authority portal.

Promoter Registration Certificate
Promoter Pan Card
Promoter Address Proof
Affidavit
1 Completion Certificate
Fd 1 SRINIVASA CONSTRUCTIONS-BSHEET.Pdf
Fd 2 S C P&L AND BS 2023.Pdf
Fd 3 S C P&L And BS -2022.Pdf
Fd 4 SRINIVASA CONSTRUCTIONS-P&L.Pdf
Fd 5 S C P&L AND BS 2023.Pdf
Fd 6 S C P&L And BS -2022.Pdf
Fd 7 ITR-Srinivasa Constructions.Pdf
Fd 8 S C IT RETURN 2023.Pdf
Fd 9 ACK ADXFS2877H 2022-23 581052531300922 (3).Pdf
Pd 1 Commencement Certificate( Annexure - 80 )
Pd 2 Approved Building Plan( Annexure - 81 )
Pd 3 Sectional Drawing Of The Apartments( Annexure - 82 )
Pd 4 Certificate From Registered Engineer Indicating The Structural Safety Of The Building( Annexure - 83 )
Pd 5 Project Specifications( Annexure - 84 )
Pd 6 Brochure( Annexure - 85 )
Pd 7 Relinquishment Deed( Annexure - 86 )
Pd 8 Proforma Of Agreement For Sale( Annexure - 87 )
Pd 9 Proforma Of Allotment Letter( Annexure - 88 )
Dc 1 Declaration (Form B)( Annexure - 89 )
Dc 2 Section 3(1) Notarized Affidavit( Annexure - 90 )
Dc 4 Advocate Search Report( Annexure - 92 )
Noc 1 ESCOM Electricity( Annexure - 95 )
Noc 2 KWSSB Water( Annexure - 96 )
Noc 3 KSPCB( Annexure - 97 )
Noc 13 Coastal Regulation Zone Authority( Annexure - 107 )
Photo 1 Project Photo
Od 1 Site And Stilt Floor Plan.Pdf
Od 2 25 TAX Paid.Pdf
Od 3 36 ADLR SKETCH.Pdf
Od 4 32 Building Permission.Pdf
Od 5 35-3 Single Layout Order.Pdf
Od 6 SRINIVASA CONSTRUCTION COST ESTIMATE.Pdf
Od 7 STP SRINIS PRISTINE.Jpeg
Od 8 MASTER PLAN MARKED.Pdf
Od 9 VILLAGE MAP MARKED.Jpeg
Od 10 SINGLE LAYOUT PLAN.Pdf
Od 11 SRINIVASA CONSTRUCTION COST ESTIMATE.Pdf
Od 12 AREA STATEMENT - SRINIVASA CONSTRUCTION.Pdf
Od 13 COMMAN AREA-SRINIVASA CON.Pdf
Od 14 CA No Due Certificate.Pdf
Od 15 Ground Typical Terrace Section Elevation.Pdf
Od 16 Site And Stilt Floor Plan.Pdf
Od 17 32 Building Permission.Pdf
Ed 1 30-08-2025
Ed 2 30-08-2025
Ed 3 30-08-2025
Ed 4 30-08-2025
Ed 5 30-08-2025
Ed 6 30-08-2025
Ed 7 30-08-2025
Ed 8 30-08-2025
Ed 9 30-08-2025
Ed 10 30-08-2025
Ed 11 30-08-2025
Ed 12 30-08-2025
Ed 13 30-08-2025
Ld Rtc
Ld Mutation
Ld Encumbrance Certificate
Ld Conversion Order
Ld Sale Deed
Ld Khatha
Bank

Bank & Cost Disclosure

Declared project cost and the designated escrow account on file.

Project Account Bank STATE BANK OF INDIA
Account Number (RERA) 44231028812
IFSC SBIN0030495
Branch Address HSR LAYOUT
Country/City