Squareyards Logo
Blogs
Sell or Rent Property
Login
Rera Banner
residential Under Construction Source: rera.ka

Sumuk Square RERA Details - PRM/KA/RERA/1251/472/PR/070323/005769 Bangalore

View the RERA registration, promoter, approval, building, inventory, document and construction-progress disclosures for Sumuk Square under registration PRM/KA/RERA/1251/472/PR/070323/005769 in Bangalore, Karnataka. Data is sourced from rera.ka.

RERA

RERA Snapshot

The most important statutory project disclosures, generated dynamically from available RERA fields.

  • RERA Number PRM/KA/RERA/1251/472/PR/070323/005769
  • Project Name SUMUK SQUARE
  • Project Type Residential/Group Housing
  • Project Status Under Construction
  • District Bengaluru Urban
  • Taluka Yelahanka
  • Original Completion 25 August 2026
  • Documents 90 Verified
Timeline

Project Timeline & Completion Details

Key statutory dates from registration through proposed completion and permit validity.

Proposed Start 30 January 2023 Expected commencement of civil works and foundation on site.
Original Completion 25 August 2026 Mandated date for project handover to the allottees and final compliance filing.
Promoter

Promoter, Organisation & Member Details

Declared promoter entity, address and corporate identifiers on file with the authority.

Primary Promoter

SUMUK PROJECTS
Registered Address NO 573/A 1ST MAIN ROAD BEML LAYOUT RR NAGAR BANGALORE,NO 573/A 1ST MAIN ROAD BEML LAYOUT RR NAGAR BANGALORE ,Bengaluru South ,Bengaluru Urban-560098
Location

Land, Address & Location Details

Land parcel, zoning and geo-coordinates as recorded in the project filing.

Address SY NO 55/5 JARAKEBHANDEKAVAL VILLAGE YELAHANKA HOBLI , YELAHANKA TALUK BANGALORE , Yelahanka , Bengaluru Urban, Karnataka - 560097

RERA Coordinates

Latitude, Longitude 13.1085255, 77.53614619999999
Plans

Plans & Approvals

Statutory approvals obtained or pending against the project site.

Plan Approval No. BBMP/ADDL.DIR/JDNORTH/0088/21-22
Authority BBMP - Bruhat Bengaluru Mahanagara Palike
Approved Date 01 December 2022

Understand this Project's RERA details

Get clear answers and additional support from our RERA experts.

RERA Banner
Buildings

Buildings, Towers & Building-Level Details

Statutory building-level disclosures including tower height, sanctioned floors, structural counts and parking areas.

Building Detail
Name No. of Basements No. of Slab No. of Slits No. of Open Parking Building Type Height of Tower No. of Floors No. of Units
A 1 6 0 83 Residential 14.5 5 75

Scroll horizontally to view all building-level fields. Values marked "-" were not disclosed in the source RERA record.

Inventory

Unit Inventory & Configuration Details

Configuration mix and floor-level disclosures with both grouped and raw RERA views.

Total Units -
Configurations 2
Inventory Type RESIDENTIAL
Configuration Distribution
2 BHK 0 units
3 BHK 0 units
  • A
Floor-Wise Inventory Explorer
Floor Apartment Type Carpet Area No. of Unit
GF 3 BHK 68.14 GF-001
GF 2 BHK 59.79 GF-002
GF 3 BHK 69.45 GF-003
GF 3 BHK 76.61 GF-004
GF 3 BHK 73.91 GF-005
GF 3 BHK 76.77 GF-006
GF 2 BHK 61.15 GF-007
GF 2 BHK 59.7 GF-008
GF 2 BHK 67.13 GF-009
GF 3 BHK 89 GF-010
GF 3 BHK 73.52 GF-011
GF 3 BHK 73.79 GF-012
GF 2 BHK 68.67 GF-013
GF 3 BHK 77.68 GF-014
GF 2 BHK 65.2 GF-015
1 3 BHK 90.15 FF-101
1 2 BHK 64.27 FF-102
1 3 BHK 73.94 FF-103
1 3 BHK 81.1 FF-104
1 3 BHK 78.4 FF-105
1 3 BHK 85.14 FF-106
1 2 BHK 70.54 FF-107
1 2 BHK 64.18 FF-108
1 2 BHK 69.38 FF-109
1 3 BHK 95.37 FF-110
1 3 BHK 77.83 FF-111
1 3 BHK 78.28 FF-112
1 2 BHK 73.16 FF-113
1 3 BHK 82.55 FF-114
1 2 BHK 69.69 FF-115
2 3 BHK 90.15 SF-201
2 2 BHK 64.27 SF-202
2 3 BHK 73.94 SF-203
2 3 BHK 81.1 SF-204
2 3 BHK 78.4 SF-205
2 3 BHK 85.14 SF-206
2 2 BHK 70.54 SF-207
2 2 BHK 64.18 SF-208
2 2 BHK 69.38 SF-209
2 3 BHK 95.37 SF-210
2 3 BHK 77.83 SF-211
2 3 BHK 78.28 SF-212
2 2 BHK 73.16 SF-213
2 3 BHK 82.55 SF-214
2 2 BHK 69.69 SF-215
3 3 BHK 90.15 TF-301
3 2 BHK 64.27 TF-302
3 3 BHK 73.94 TF-303
3 3 BHK 81.1 TF-304
3 3 BHK 78.4 TF-305
3 3 BHK 85.14 TF-306
3 2 BHK 70.54 TF-307
3 2 BHK 64.18 TF-308
3 2 BHK 69.38 TF-309
3 3 BHK 95.37 TF-310
3 3 BHK 77.83 TF-311
3 3 BHK 78.28 TF-312
3 2 BHK 73.16 TF-313
3 3 BHK 82.55 TF-314
3 2 BHK 69.69 TF-315
4 3 BHK 90.15 FF-401
4 2 BHK 64.27 FF-402
4 3 BHK 73.94 FF-403
4 3 BHK 81.1 FF-404
4 3 BHK 78.4 FF-405
4 3 BHK 85.14 FF-406
4 2 BHK 70.54 FF-407
4 2 BHK 64.18 FF-408
4 2 BHK 69.38 FF-409
4 3 BHK 95.37 FF-410
4 3 BHK 77.83 FF-411
4 3 BHK 78.28 FF-412
4 2 BHK 73.16 FF-413
4 3 BHK 82.55 FF-414
4 2 BHK 69.69 FF-415
Parking

Parking, Garage & Area Details

Parking provision declared in the sanctioned plan.

Type Proposed Booked Work Done
Garage - - -
Covered Parking - - -
Open Parking - - -
Development

Development Works & Common Area Disclosures

Project-level common infrastructure disclosures as reported by the developer to the RERA authority.

Sub Structure Earth Work And Other Leveling Preparation Work % not reported Sub Structure Foundation Footing Work % not reported Sub Structure Upto Plinth Level % not reported
Sub Structure Sub-structure Flooring (Parking Floor, More Than One Floor Below General Ground Level) % not reported Sub Structure Retaining Wall (All Types) % not reported Sub Structure Other Works % not reported
Sup Structure Rcc Or Ms Framed Structure % not reported Sup Structure Masonry Construction % not reported Sup Structure Plastering Inside , Outside & Ceiling % not reported
Sup Structure Joinery: Doors, Windows, Ventilators Etc % not reported Sup Structure Basic Work Of Water Supply, Sanitary And Electrification % not reported Sup Structure Dadoing, Skirting, Flooring, Tiles Work (All Types) % not reported
Sup Structure Railing And Grill Fixing % not reported Sup Structure Other Works % not reported Finishing Works Electrification, Water Supply And Sanitary Finishing % not reported
Finishing Works Painting % not reported Finishing Works Fire Prevention And Fire Fighting Fitting And Fixture With Network % not reported Finishing Works Weather Proof Work(tile,concrete) % not reported
Finishing Works Wardrobe, Showcase, Kitchen Cabinet, Puja Work % not reported Finishing Works Elevation Work % not reported Finishing Works Internal And External Work Including Landscapes As Per Sanctioned Drawings % not reported
Internal Infrastructure Water Supply % not reported Internal Infrastructure Sewage And Drainage System % not reported Internal Infrastructure Water Conservation/rain Water Harvesting/recharge Of Ground Water % not reported
Internal Infrastructure Energy Management % not reported Internal Infrastructure Fire Protection And Fire Safety Requirements % not reported Internal Infrastructure Solid Waste Management And Disposal % not reported
Internal Infrastructure Emergency Evacuation Services % not reported External Infrastructure Water Supply % not reported External Infrastructure Internal Roads & Footpaths % not reported
External Infrastructure Sewage And Drainage System % not reported External Infrastructure Electricity Supply Transformer And Substation % not reported External Infrastructure Solid Waste Management And Disposal % not reported
External Infrastructure Emergency Evacuation Services % not reported External Infrastructure Storm Water Drains % not reported External Infrastructure Use Of Renewable Energy % not reported
External Infrastructure Water Conservation/rain Water Harvesting/recharge Of Ground Water % not reported External Infrastructure Fire Protection And Fire Safety Requirements % not reported External Infrastructure Sewage Treatment Plant (Stp) % not reported
External Infrastructure Parks & Tree Planting % not reported External Infrastructure Street Lighting % not reported Amenities Electricity % not reported
Amenities Smart Home Automation % not reported Amenities Cctv Surveillance % not reported Amenities Club House % not reported
Amenities Community Hall % not reported Amenities Outdoor Sports Facility % not reported Amenities Indoor Sports Facility % not reported
Amenities Swimming Pool % not reported Amenities Gym % not reported Amenities Parks % not reported
Amenities Power Backup % not reported Amenities Piped Gas % not reported Amenities Water And Sanitation % not reported
Amenities Air Conditioning % not reported Common Areas Staircases % not reported Common Areas Lifts % not reported
Common Areas Corridor/lobbies % not reported Common Areas Fire Escapes % not reported Common Areas Common Entrance And Exit For The Building/common Portico/foyer/verandah % not reported
Common Areas Basement % not reported Common Areas Terrace % not reported
Documents

RERA Documents & Filings

All statutory documents uploaded by the promoter to the authority portal.

Promoter Registration Certificate
Promoter Pan Card
Promoter Address Proof
Affidavit
Fd 1 YASH 21-22.Pdf
Fd 2 YASH IT 20-21 Compressed.Pdf
Fd 3 YASH 19-20 Compressed.Pdf
Fd 4 YASH 21-22.Pdf
Fd 5 YASH IT 20-21 Compressed.Pdf
Fd 6 YASH 19-20 Compressed.Pdf
Fd 7 HEMANTH IT 21-22 Compressed.Pdf
Fd 8 HEMANTH IT 20-21 Compressed.Pdf
Fd 9 HEMANTH IT 19-20 Compressed.Pdf
Fd 10 HEMANTH IT 21-22 Compressed.Pdf
Fd 11 HEMANTH IT 20-21 Compressed.Pdf
Fd 12 HEMANTH IT 19-20 Compressed.Pdf
Fd 13 HEMANTH IT 21-22 Compressed.Pdf
Fd 14 HEMANTH IT 20-21 Compressed.Pdf
Fd 15 HEMANTH IT 19-20 Compressed.Pdf
Fd 16 YASH 21-22.Pdf
Fd 17 YASH IT 20-21 Compressed.Pdf
Fd 18 YASH 19-20 Compressed.Pdf
Pd 1 Self Attested PAN Card*( Annexure - 66 )
Pd 2 Commencement Certificate*( Annexure - 67 )
Pd 3 Electricity Permission Letter*( Annexure - 68 )
Pd 4 Water Permission Letter*( Annexure - 69 )
Pd 5 Approved Layout Plan*( Annexure - 70 )
Pd 6 Approved Building Plotting Plan*( Annexure - 71 )
Pd 7 Existing Layout Plan( Annexure - 72 )
Pd 8 Existing Section Plan And Specification( Annexure - 73 )
Pd 9 Sectional Drawing Of The Apartments*( Annexure - 74 )
Pd 10 Project Specifications*( Annexure - 75 )
Pd 11 Approved Section Of Building Infrastructure Plan Of Plotting*( Annexure - 76 )
Pd 12 Area Development Plan Of Project Area*( Annexure - 77 )
Pd 13 Certificate From Registered Engineer Indicating The Structural Safety Of The Building*( Annexure - 78 )
Pd 14 Advocate Search Report*( Annexure - 79 )
Pd 15 Urban Land Ceiling*( Annexure - 80 )
Pd 16 Collaboration Agreement Development Agreement Joint Development Agreement Other Agreement*( Annexure - 81 )
Pd 17 Change Of Land Use*( Annexure - 82 )
Pd 18 District Magistrate*( Annexure - 83 )
Pd 19 Conversion Certificate Under Section 95 Of The KLR Act 1964*( Annexure - 84 )
Pd 20 Any Other Document (Rights Title Interest Name)*( Annexure - 85 )
Pd 21 Proforma Of Agreement For Sale*( Annexure - 86 )
Pd 22 Proforma Of Allotment Letter*( Annexure - 87 )
Pd 24 Brochure*( Annexure - 89 )
Dc 1 Declaration (Form B)*( Annexure - 90 )
Dc 2 Section 3(1) Notarized Affidavit*( Annexure - 91 )
Dc 3 JD AFFIDAVIT CUM DECLARATION*( Annexure - 92 )
Noc 1 ESCOM Electricity*( Annexure - 93 )
Noc 2 KWSSB Water*( Annexure - 94 )
Noc 3 Approval NOC Under Section 109 Of KLR Act 1961( Annexure - 95 )
Noc 4 Approval NOC Under Section 14 Of The KTCP Act( Annexure - 96 )
Noc 5 Fire Force Department( Annexure - 97 )
Noc 6 Airport Authority Of India( Annexure - 98 )
Noc 7 KSPCB( Annexure - 99 )
Noc 8 SEIAA( Annexure - 100 )
Noc 9 BSNL( Annexure - 101 )
Noc 10 Lift Authorities( Annexure - 102 )
Noc 11 BMRCL( Annexure - 103 )
Noc 12 NOC In Case Of Building Proposals Abutting To Neighbouring Properties( Annexure - 104 )
Noc 13 Bangalore Urban Arts Commission( Annexure - 105 )
Noc 14 Inspector Of Factories Controller Of Explosives Railways( Annexure - 106 )
Noc 15 Coastal Regulation Zone Authority( Annexure - 107 )
Dr 1 Utilisation Certificate( Annexure - 108 )
Dr 2 Transfer Of Development Rights Certificate( Annexure - 109 )
Dr 3 Relinquishment Deed( Annexure - 110 )
Photo 1 Project Photo
Od 1 NA .Pdf
Ed 1 24-01-2023
Ed 2 24-01-2023
Ed 3 24-01-2023
Ed 4 24-01-2023
Ed 5 24-01-2023
Ed 6 24-01-2023
Ed 7 24-01-2023
Ed 8 24-01-2023
Ed 9 24-01-2023
Ed 10 24-01-2023
Ed 11 31-01-2023
Ed 12 31-01-2023
Ed 13 06-03-2023
Ed 14 06-03-2023
Ed 15 06-03-2023
Ed 16 06-03-2023
Ld Rtc
Ld Mutation
Ld Encumbrance Certificate
Ld Conversion Order
Ld Sale Deed
Ld Khatha
Bank

Bank & Cost Disclosure

Declared project cost and the designated escrow account on file.

Project Account Bank HDFC
Account Number (RERA) 50200077125944
IFSC HDFC0001039
Branch Address RR NAGR
Country/City